Title: MFG/PRO eB2
1MFG/PRO eB2Desktop 2
- By
- Amy Conrad Susan Seaborg
2Where Did The Ideas Come From?
3Development Groups
- Automotive
- Shipment Performance
- Container and Line Charges
- Customer Consignment Inventory
- Supplier Consignment Inventory
- Electronics/ Industrial
- Reserved Locations
- Purchase Work Order Accounting
- ATP Enforcement
- SSM Enhancements
- Kanban Management
- Flow Schedule
- CP/ FB
- Linked Site Costing
- Enhanced Distribution Orders
- Work Order Site Control
- Work Order Close dates
- PO Enhancements
4Customer Enhancement Requests!
- MANY simple, uncontroversial good ideas have been
included in MFG/PRO eB2 - (So, keep those cards and letters coming!!)
- HOW?
- WHERE? ltEnhancement Requestgt
5eB2 Areas of Enhancement
- Financials
- Manufacturing
- Distribution
- Customer Services
- Supply Chain
- Pro/Plus
- System
- External Interface
- UI
6Financial Enhancements
- Logistics Accounting
- Purchasing and Work Order Accounts
- Linked-Site Costing
- Intercompany Accounting
- Improved Financial Reporting
7Logistics Accounting
- Link cost elements of purchased items to
logistics charges - Accrue on receipt or shipment
- Match invoices to accruals and account for
variances
8 Purchase Work Order Accounting
- Allocate purchasing variances and accruals by
site, product line supplier type - Allocate manufacturing variances by site,
product line
9 Linked Site Costing
- Eliminate cost set copying by linking inventory
to source costs - Flexible rules to support different types of
network
10Multi-entity Accounting
- Support Shared Services Accounts Payable
- Define inter-company account by entity pair
- Raise single check to cover payables on multiple
entities - Keep inter-company separate to facilitate
reconciliation
QAD
11Improved Financial Reporting
- Stock Journal
- Unvouchered PO Receipts as of Date
- GL Account Sheet Report
- Suppress Reopening a Closed Period
- Invoice Numbering Report
- Voucher Numbering Report
- Apply AR payment distribution-line detail
automatically
12Manufacturing Enhancements
- Work Order Control by Site
- Work Order Dates
- Kanban Transactions Lean Manufacturing
- Flow Scheduling Module Lean Manufacturing
- Improved MRP/DRP Performance
13Work Order Control by Site
- ALL work order update functions controlled by
site security - Select work orders by site on ALL functions,
reports, browses, inquiries
14Work Order Dates
- Added a Work Order Receipt Date and Work Order
Close Date. - Automatically capture Userid with Close Date and
Receipt Date. - Added new information to Status Report and
History Report.
15 Kanban
- Manage through 1 Card or 2 Card Kanban System
- Manage and track internal or external Kanbans
- Execute Kanban signals via PO Receipts, Item
Movements, and Production Receipts - Automatically generate signals to replenishment
sources
16Flow Scheduling
- Generate rate-based, mixed model master
scheduling for products and product families - Sequence production based on priority, capacity,
and linearity - Schedule by production line and site
- Level load by defining flex fences
- Monitor time and machine capacity in a schedule
- Optimize flow production levels due to flexible
workforce or extra machine capacity
17Improved MRP/DRP Performance
- Use Progress Appserver to support multithreading
MRP/DRP processes across multiple processors - Selectable by MRP or DRP or both
- Default Parameters override-able at run time
18Distribution Enhancements
- Customer Reserved Locations
- Customer Consignment Inventory
- ATP Enforcement
- Multiple Customer Items on Customer Schedules
- EMT Enhancements
- Purchase Order Enhancements
- Supplier Consignment Inventory
19Customer Reserved Locations
- Minimize shipping lead time by reserving
inventory to specific customers without a sales
order. - Ensure availability of inventory for specific
customers, by allowing only specific customers
orders to be shipped from their reserved
location. - Manage inventory levels of reserved locations
through new reporting
20Customer Consignment
- Ability to plan, order, ship, stock, track and
report customer consigned items while at the same
time deferring invoicing and AR - Trigger Invoicing and AR transactions by customer
usage - Transfer of ownership occurs as customer usage
21ATP Enforcement
- Control order processing of items based on
projected availability - Selectively prevent users from inputting
subjective due dates that cannot be met by the
MPS - Exception reporting to compare the MPS
information to the Sales Order information - Track cumulative ATP information
22EMT Enhancements
- Improved synchronization of primary Sales Order
to secondary Sales Order - Improved tracking of Sales Order through
additional status flags - Streamlined direct shipping process
23Purchase Order Enhancements
- Redirect PO shipments direct to other sites
- Revise line item quantities on released POs
24Multiple Customer Items
- Ship same internal item to satisfy demand for
multiple customer items - Update and Report Scheduled Orders by customer
reference and model year - Manage a many to one relationship between
customer item numbers ordered and supplier item
numbers shipped.
25Supplier Consignment
- Ability to plan, order, receive, stock, track and
report supplier consigned items while at the same
time postponing purchase cycle - Trigger Receipt and AP transactions by usage
transactions - Transfer ownership at time of usage
- Satisfy MRP requirements without transfer of
onwership
26Customer Services
- Customer Services
- Service Contract Enhancements
- PRM Enhancements
27Contract Enhancements
- Optional three-tiered contracts for either
- Multiple end-users, each with multiple items
- Multiple items, each with multiple end-users
- Expanded billing options
- Contract revenue can be posted as accrued, cash,
or deferred
28PRM Enhancements
- Manage multiple Material Orders (MO) assigned to
each Project Activity Order Line - Correct errors in MO consumption through Project
Activity Recording - Manage Project WIP through new reporting options
29Supply Chain
- Enhanced Distribution Orders
- EDI Ecommerce
30 Distribution Order (DO) Enhancements
- Optionally use a PUSH inventory model instead of
a PULL inventory model - Optimize shipping costs by adding items to
shipment not included in original requirements - Enable shipping of non-sale items such as samples
- Streamlined DO closed short process
- Manage discrepancies between supply site and
demand site through new reporting options
31EDI Ecommerce Enhancements
- Relocated EDI Ecommerce menu structure
- Additional trading partner document types
- Self-Bill
- Cycle Count
- Text Information
- Consignment Information
- Status Messages
- Exchange EDI documents in XML format
- New Additions to Trading Partner Libraries
- Additional Process Improvements
32Pro/Plus
- Container and Line Charges
- Shipment Performance Reporting
33Container Line Charges
- Manage container and other charges by line item
- Selectively charge for container depending on
container used - Optionally define customized calculation for
container/line charges - Track/Validate shipping codes (e.g. AETC or
airport codes) - Account for revenue by charge type
34Shipment Performance Reporting
- Monitor shipping effectiveness by measuring
shipping dates/quantities to requested
dates/quantities - Collect performance information on discrete
orders, scheduled orders, return material
authorizations, distribution orders, and material
orders - Measure performance by required date, performance
date, due date, and shipment quantity - Selectively enable performance reporting by
system, customer, item, or order type
35System Enhancements
- User Security Changes
- License Registration Improvements
- Multiple Time Zones Setup
- Change Tracking
- Oracle Improvements
36System Access Enhancements
- Single Access Methodology to validate User access
at sign-on - Menu Password functions renamed to Menu Security
functions - Additional User Information
- Country Code
- Variant
- User Type
- Time Zone
- Access Location
- Manage user activity through new reporting options
37Change Tracking
- Monitor Sales Order efficiency by tracking line
item changes by reason code - Manage performance by tracking reason code and
comments - Streamline tracking process by determining which
information must be enabled for change tracking
38External Interfaces
- Demand Planner API
- Data Synchronization Improvements
- Q/LinQ Enhancements
- APO Available to Promise
39Data Synchronization
- Manage multiple types of relationships among
source and destination databases - Synchronize data across timezones and currencies
- Accommodate local independent operations as
required - Multiple methods available for database
communication
40Q/LINQ
- XML data mapping capability using Extended
Stylesheet Language Transformation (XSLT) - Access multiple MQ Series queues with a single
Message Oriented Middleware (MOM) adapter - Management of MOM adapter parameters controlled
by system administrator rather than user - Additional MOM Adapter tuning tools
41Advanced Planning and Optimization (APO)
Available to Promise
- Obtain real-time ATP information from Adexa
products as demand is entered in MFG/PRO - Available for Sales Orders, Sales Orders received
via EDI, Return Material Authorizations, and
Material Orders (SSM) - Determine ATP information from Adexa products
through order inquiry before entering a sales
order - Optionally use ATP enforcement feature when APO
ATP is not available
42Minor Enhancements
- Control Tables Report (36.17.6) includes
information on optional modules such as PRO/PLUS - AP Payment Register (28.9.12) no longer displays
multiple header rows and columns align correctly - Address Code Change (2.11) re-written to improve
performance and can be executed in batch mode - Item Description displays next to Item Number in
Supplier Schedule Maintenance (5.5.1.13) - Approver Report (5.2.1.17) contains additional
sort options - Build PO from Requisitions (5.2.18) generates
e-mails - Container Archive/Delete function added
- Quality Order Maintenance contains GL Effective
date - Ship-To address in Purchase Order Returns stored
in History - PO Delete/Archive includes selection by PO type
- Warning Message for Tax Info added to SO Maint,
SQ Maint, Pending Invoice Maintenance, RMA
Maintenance - SIC Code added to Customer Maintenance and Master
Report
43Thanks!