2V52
V52 850 kW Pitch/Optispeed 14.00 to 31.40rpm
Weight Nacelle 22 ton Rotor 10 ton Sum 32
ton
Nacelle factories Italy Taranto V52 Hub
factories Italy Taranto V52 _ Primary
factory Prototype, Working instruction
3V82
V82 1,65 MW Active-Stall 14.4 rpm (1 speed
generator) V82 1,65 MW(900kW) Active-Stall
14.4/10.8 rpm (2 speed generator)
Weight Nacelle 52 ton Rotor 43 ton Sum 95
ton
Nacelle factories Spain Viveiro V82 India
Chennai V82 Hub factories Denmark Skagen
V82 India Chennai V82 _ Primary factory
Prototype, Working instruction
4V80-V90
V80 2 MW Pitch/Optispeed 9 to 19 rpm V90
1,8-2 MW Pitch/Optispeed 9 to 14.9 rpm V80
1,8 MW Pitch/Optislip 15.5 to 16.8 rpm
Weight Nacelle 67 ton Rotor 37 ton Sum
104 ton
Nacelle factories Denmark Viborg V80 2MW Spain
Leon V80 2MW China (2007) Tianjin V80 2MW Hub
factories Denmark Ringkøbing V80 2MW China
(2007) Tianjin V80 2MW _ Primary factory
Prototype, Working instruction
5V90
V90 3 MW Pitch/Optispeed 8.6 to 18.4 rpm
Weight Nacelle 70 ton Rotor 41 ton Sum
111 ton
Nacelle factories Denmark Ringkøbing V90 3MW,
Hub factories Denmark Ringkøbing V90 3MW, _
Primary factory Prototype, Working instruction
6Nacelles Value Chain
Vestas Nacelles Value Chain
7Vestas Nacelles production facilities
Denmark, Norway, Sweden, Germany, Italy, Spain,
India and China
8Vestas Castings
Vestas Castings Magdeburg, components up to 11
ton Kristianssand, components up to 20
tons Guldsmedshyttan components up to 40 ton
9Vestas Machining - Lem
10Vestas Generator - Lübeck
11Pictures from Ringkøbing
12Pictures from Leon
13Pictures from Viveiro
14Pictures from Taranto
15Pictures from Chennai
16Pictures from Tianjin
17Pictures from Tianjin
Land approx. 50.000 sqm Buildings approx. 13.000
sqm.
18Pictures from Viborg (1)
19Factory Viborg
LEAN-Production in Viborg (15-18
turbines/week) 6 step (2x3 parallel 3) 1 step
takes 6 hours. Target is 4 hours
Operation 0100 Main foundation Yaw beam Yaw gear
Operation 0200 Crane column
Operation 0300 Gear Main shaft/bearing Hydraulic
station
Front
Operation 0400 Rear section Generator
Operation 0500 Control cabinet Transformer
Operation 0600 Cables Generator finish
Rear
Operation 0700 Assembling of main foundation and
rear Crane finish Cables
Operation 0900 Glass fiber cabin Ready for
shipment
Operation 0800 Final test
20Pictures from Viborg (2)
21Pictures from Viborg (3)
22Pictures from Viborg (4)
23Pictures from Viborg (5)
24Pictures from Viborg (6)
25Pictures from Viborg (7)
26Pictures from Viborg (8)
27Pictures from Viborg (9)
28Pictures from Viborg (10)
29Pictures from Viborg (11)
30Pictures from Viborg (12)
31Pictures from Viborg (13)
32Pictures from Viborg (14)
33Pictures from Viborg (15)
34Pictures from Skagen (1)
35Pictures from Skagen (2)
36Pictures from Skagen (3)
37Responsibility
38Drawing system
- Drawing system Pro/E
- Archives system Intralink
39Drawing system
40Structure
V80 - 76 Variants V80/V90, 50 Hz/60Hz, Ral
7035/9010, VCS/VRCC etc.
Level 1 (Nacelle) Level 2 (Main module) Level 3 (Sub module) Level 4-x (Assembly)
Main foundation mod
Rear foundation mod
Generator mounted
Generator module
Slip-ring module
Yaw module
Nacelle cover module
Mainshaft-gear mod.
Mainshaft module
Gearbox brake offl.filt.
Rotating transfer mod.
Torquearm module
Torquearm left
Torquearm right
41Certificate
- A turbine cant be erected without a certificate.
- Certificates can be issued by GL, DNV and TÜV
based on documentation from Vestas. - Guidelines and standards IEC 61400, DS 472, NVN
11400, GL, DIBt etc. - Three elements in the certificate
-
- - Design assessment.
- Verification of the design and engineering
documents. - Turbine management and safety.
- Load calculation.
- Strength calculation.
- - Quality management
- ISO 9001 covers the majority of the requirements
. - - Prototype test
- Validation of the calculations.
- Turbine management.
- Performance.
42Operational Loads
- Wind Loads etc. (Flex5)
- Gravity (9,82 N/kg)
- Horizontal acceleration
- Extreme 5 N/kg Fatigue 1 N/kg (m5, n107)
Loads based on GL category 1A Extreme wind speed
for 80 m V 70 m/s Annual average for 80 m V
10 m/s Turbulence intensity for category A1 18
(3. december 1999 51,4 m/s) (Katrina
Hurricane 2005 77,8 m/s) Extreme moment at
blade flange V80 6000kNm 1000kg at 600m
43Transport Loads
44Certificate Main parts
Component Approval Issue
Hub Loads Flex 5 Strength FEM Fatigue and static strength Deformations by the bearings.
Machine frame Loads Flex 5 Strength FEM Fatigue and static strength
Rear section Loads Flex5 Analytic Strength Analytic FEM Fatigue and static strength Welded component
Drive train Loads Flex5 Analytic Strength FEM Fatigue and static strength Welded component
Crane with traverse Loads Analytic Strength Analytic FEM Static strength Welded component
45Certificate Main parts
46Certifikate Small parts
Component Approval Issue
Bearings Loads Flex 5 Strength Approved by supplier Fatigue and static strength
Main bearing housing Loads Flex 5 Strength FEM Fatigue and static strength
Rotor lock Loads Flex 5 Strength Approved by supplier Static strength
Coupling and breake Loads Flex 5 Strength FEM / Supplier Fatigue and static strength
Gear box torque arms Loads Flex 5 Strength FEM / Supplier Fatigue and static strength
47The rest
- 1000 drawings of different parts for one
Turbine - For example
- Tread plates
- Glass fiber cabinet/nose cone support
- Support for hydraulic and electrical parts
- Coolers
- Ladders
- Anemometer
- Cover plates
- Hatches
- Etc.
48Standards - Why?
- The components shall be produced global without
problems. - Knowledge to standards and GPS (Geometrical
product specification) is therefore important -
Chinese supplier
49Design - PE
Not add better requirements than necessary! Not
all requirements are mentioned on the drawings.
Remember to check the bill of material in INFOR
50Design - PE
- Drawing head - assembling
Bulk items in the BOM Georoil etc Accessories
not separate in the BOM Cable Stripper, lock oil
etc
51Design - PE
Verdana 12 pt, font colour white
52Design - PE
- Make it cheaper
- The redesign displayed below gives savings of
10.000 DKK/week in Viborg
Verdana 12 pt, font colour white
53Design - PE
54Design - PE
55Design - PE
- Improve drawings GPS 3D measuring (Tolerance
0,003)
56Design - PE
- Improve drawings GPS Lasertracker
57Design - PE
- See failures before they occur
Fatigue crack
Verdana 12 pt, font colour white
58Remember Fatigue
Verdana 12 pt, font colour white
59Remember Fatigue
60NCR - PE
BP 04.03.00. This procedure is valid for the
handling of non-conformity items/products
detected during Vestas' manufacturing, storage,
transport, installation and commission activities
until the after sales system/procedures takes
over.
61NCR - PE
62Surface treatment
- Inside Nacelle C3
- Hot dip galvanizing acc. ISO 14611999 minimum
local thickness 45 µm - Thermal spraying acc. ISO 20632005 (ISO
149192001 ZnAl15) 70 µm - Thermal spraying acc. ISO 20632005 (ISO
149292001 ZnAl 15) 50 S3.17 - Indvendig Inside Hub C4
- Hot dip galvanizing acc. ISO 14611999 minimum
local thickness 85 µm - Thermal spraying acc. ISO 20632005 (ISO
149192001 ZnAl15) 110 µm - Thermal spraying acc. ISO 20632005 (ISO
149292001 ZnAl 15) 100 S4.20 -
- Outside Nacelle C5M
- Hot dip galvanizing acc. ISO 14611999 minimum
local thickness 170 µm - Thermal spraying acc. ISO 20632005 (ISO
149292001 ZnAl 15) 100 S7.02
Verdana 12 pt, font colour white
63Documentation
- Documentation demand, see BP 08.16.00
- Work instruction, Purchase specification, Quality
Specification, Control instruction, - Inspection scheme, Supplier approval
- A-item are items where defects affect the
- Quality of the product,
- Environment,
- Safety
- Assurance
- Legislation prescribes calculations, safety
evaluations, production documentation -
- B-item are items (including catalogue items),
that defects only marginally affect the - Product quality,
- Environment
- Safety
- The defect will be detected in the prescribed
inspections - Only capable of affecting processes and
reliability of supply briefly.
64Material - Welding - Cast
- Quality requirements - Welding
- Depending on consequence and use (Loads etc). See
nacelle notes guideline - QS 993667 (Elementary quality requirements)
- QS 993665 (Comprehensive quality requirements)
- If there is a reference to TPS 901529 or TPS
901530 it is allowed to manufacture the item in
an substitute material for example Chinese
standardized steel. - TPS 901528 Casting quality requirements
- TPS 901529 Parts - Certified components
(Approved by DNV, GL etc.) / Component which are
important for the safety of the turbine - The substitute material has at least the same
strength as the specified material. - TPS 901530 Parts - Non certified components /
Non-important components. The substitute material
may be weaker than the specified strength of the
parent material - Strength of steel S355 (EN 10025) may be reduced
with max. 10 - Strength of steel S235 (EN 10025) may be reduced
with max. 5
65Temperature
Production stop Alarm 19 Ambient temperature
too low -30 C Alarm 83 Gear oil
temperature too low -10 C Alarm 94
Nacelle temperature too low -15 C
66Tower
67Local content percentage distributionon
components
Name of component NDRC Possible NDRC
Tower 16.9 9.0
Electrics in Wind Farm 7.2
Nacelle cover 4.4 4,0
Generator 7.4 8.0
Blade 22.5 19.0
Gearbox 15.4 15.0
Main shaft, (incl. Bearings, coupling) 3.4 4.0
Hub (incl. Pitch regulated system) 4.2 7.0
Yaw system 1.3 5.0
Central control and monitoring system 3.5 3.0
Electrical control sys. (SCADA) incl. inverter 3.5 16.0
Hydraulic system 2.2 2.0
General assembly 3.0 3.0
Spareparts 1.0 5.0
Others 4.1
SUM 100.0 100.0