Title: Smart Grid Projects at NSTAR NE Electricity Restructuring Roundtable
1Smart Grid Projects at NSTAR NE Electricity
Restructuring Roundtable
Doug Horton Project Manager, Smart Grid NSTAR
Electric Gas October 28, 2011
2Agenda
1
NSTARs Smart Grid Projects
2
AMR Based Dynamic Pricing
3
Grid Self-Healing Efficiency Expansion
4
Urban Grid Monitoring and Renewables Integration
5
Synchrophasor Measurement Installation
1
3NSTAR is currently pursuing 4 new Smart Grid
initiatives
Initiative Description ARRA Grant Estimated Budget
AMR-Based Dynamic Pricing Deployment of advanced technology to enable real-time measurement and two-way communication of energy consumption using existing AMR meters. SGDP Recipient 50 Grant 4.7M
Grid Self-Healing and Efficiency Expansion Creates an auto restoration or self-healing capability on the distribution system, using modern sensing, communications and information processing based on digital technologies. SGIG Recipient 50 Grant 20.1M
Urban Grid Monitoring and Renewables Integration Facilitates the interconnection of inverter-based distributed generation in a safe manner onto a secondary area network grid. SGDP Recipient 50 Grant 10.5M
Synchrophasor Measurement Installation In conjunction with ISO-NE, install Phasor Measurement Units (PMU) in four substations to enable real-time phasor data applications. SGIG Sub-recipient for ISO-NE 1.6M
Total Total Total 37.0M
50 DOE Funding 50 DOE Funding 50 DOE Funding 18.5M
4Agenda
1
NSTARs Smart Grid Projects
2
AMR Based Dynamic Pricing
3
Grid Self-Healing Efficiency Expansion
4
Urban Grid Monitoring and Renewables Integration
5
Synchrophasor Measurement Installation
3
5AMR-Based Dynamic Pricing
- Overview
- Compliant with Massachusetts Green Communities
Act - Will include 2,870 total NSTAR customers
- Integrates two way communications and near real
time measurement of consumption data via Tendril
Networks Home Area Network system - Utilizes Time of Use Pricing by integrating
interval data from Tendril to NSTAR back office
systems - Low-cost solution utilizing existing
infrastructure - Compatible with existing meters
- Compatible with existing billing system
- Utilizes Internet for communications back-haul
4
6Tendril/NSTAR AMR-Based Dynamic Pricing
All participants
ERT
Portal
ERT
Display
Translate
Gateway
Zigbee
Zigbee
Half of the participants
Load Control Switch
Thermostat
7All participants will receive real-time
information on usage and cost
All Participant Groups
Load Control
Access to Web Portal
In Home Display
Programmable Thermostat
Internet Gateway / HAN
- Zigbee device
- Real-time power demand
- Billing period electricity consumption cost
- Price of electricity
- Up to 4 programmable set points per day
- Controllable over the Internet via the Web
Portal - Critical Event management and control
- Home Area Network (HAN) to enable two-way
communication between the customer and NSTAR
- View and manage household energy consumption
online - Receive messages from NSTAR
- Analyze historical usage patterns
6
8Pricing Structures
- NSTAR will call no more than 12 Critical Peak
Events during the course of the year, each
lasting for up to 5 hours - Peak Time Rebate customers will be eligible to
earn a fixed rebate of 5 per event if the
customer allows central air conditioning (A/C)
load control - TOU-CPP customers will experience steep price
differentials, per the table below
Illustrative TOU and CPP Rate Periods and Prices Illustrative TOU and CPP Rate Periods and Prices Illustrative TOU and CPP Rate Periods and Prices Illustrative TOU and CPP Rate Periods and Prices Illustrative TOU and CPP Rate Periods and Prices Illustrative TOU and CPP Rate Periods and Prices
Period Summer Period (June - September) Winter Period (October - May) Illustrative Standard Electricity Price (/kWh) Approximate Supply Price Ratio Illustrative TOU-CPP Electricity Price (/kWh)
Critical Peak As called by NSTAR As called by NSTAR 0.16 10.62 1 0.90
On-peak Noon to 5pmnon-holiday weekdays 4pm to 9pmnon-holiday weekdays 0.16 2.23 1 0.25
Off-peak All other times during the period All other times during the period 0.16 0.60 1 0.13
9Marketing Recruitment
Phase I General Marketing Campaign
Traditional marketing techniques Appeal to
mainstream audiences Test/monitor
receptivityappetite and aptitude
- Objectives
- Document outreach and results
- Demonstrate pilot attempts to reach all customers
- Complete non-participant and participant research
Phase II Targeted Marketing
- Objectives
- Secure sufficient pilot participants
- Complete non-participant and participant research
Digital/Online
10Direct Mail
Direct mail communication to eligible residents
in Newton, Hopkinton, Jamaica Plain
11Email Campaign Initial Results
12Current Status
- Installed equipment in almost 1400 customer homes
- Integrated interval metering data into billing
and CIS systems to produce Critical Peak Rebates
and time-differentiated billing - Called 5 Critical Events during the summer
- 3M project spending out of 4.7M total 50
funded by US DOE
11
13Agenda
1
NSTARs Smart Grid Projects
2
AMR Based Dynamic Pricing
3
Grid Self-Healing Efficiency Expansion
4
Urban Grid Monitoring and Renewables Integration
5
Synchrophasor Measurement Installation
12
14Grid Self-Healing Efficiency Expansion
- Electric delivery network using modern sensing,
communications, and information processing based
on digital technologies - Microprocessor-based measurement and control
using remote sensors - Current, voltage, KVA, temperature
- Circuit self-healing implementation
(Auto-Restoration) - Supervisory controlled overhead and underground
switches with voltage and current sensors - Interoperability standards using PI interface
- SCADA interface to recloser control cabinet
13
15Three Operational Modes
- Mode 1 Supervisory mode
- Leverages remote control of switches
- Operator controlled sequences
- Mode 2 Operational Acknowledgement mode
- Computer-simulated restoration sequences
- Operator validation and execution
- Mode 3 Self-Healing mode
- Computer-determined restoration sequences
- No human intervention
14
16Grid Self-Healing Efficiency Expansion
- Over 1,700 SCADA Switches installed through the
service territory and over 5,000 sensors
monitoring the overhead electric grid
15
17DA South 600amp Switch locations
18DA North ASU locations
19Smart Switch Equipment
18
20Current Status
- Over 1700 smart switches deployed throughout our
service territory - Allow for remote switching by our SCADA operators
to significantly reduce the amount of time our
customers go without power - 57,000 outages avoided in 2011 due to automated
sectionalizing, with another 142,000 outages
being restored in less than 5 minutes. - Hurricane Irene
- 506,000 total outages
- 232,000 restored in less than 1 hour
- 50,000 outages avoided
- 12.4M project spending out of 20M total 50
funded by US DOE
19
21Agenda
1
NSTARs Smart Grid Projects
2
AMR Based Dynamic Pricing
3
Grid Self-Healing Efficiency Expansion
4
Urban Grid Monitoring and Renewables Integration
5
Synchrophasor Measurement Installation
20
22Project Objectives
- Incorporate advanced sensing and monitoring
equipment to test the integration of distributed
resources onto a secondary area network - Improve visibility into secondary area network
grid using two different types of nodes or
sensors - Deploy sensors on the underground secondary
network - Refine methods suitable to scale broadly across
urban areas nationwide - Develop model to safely examine small
inverter-based distributed resource integration - Solar PV integration from downtown customers
- Potential for integration anywhere on the test
grid - Pave the way for other, inverter-based DR in the
future
21
23Demonstration Grid Location (Shown in Red)
22
24Digital Grid Secondary Cable Monitoring CTs
25Current Status
- Finalized the award with the US DOE October 18,
2011 - Preparing to order equipment and proceed with
project as planned - Initial installations of major and minor nodes
planned for end of 2011
24
26Agenda
1
NSTARs Smart Grid Projects
2
AMR Based Dynamic Pricing
3
Grid Self-Healing Efficiency Expansion
4
Urban Grid Monitoring and Renewables Integration
5
Synchrophasor Measurement Installation
25
27Synchrophasor Measurement Installation
- NSTAR is sub-recipient to ISO New England US DOE
Smart Grid Investment Grant. - Install Phasor Measurement Units (PMU) in four
substations - The project is an essential part of ISO New
England's plans for infrastructure development
based on the expansion of its PMU-based
disturbance detection and monitoring system - RD project to provide real-time data to ISO NE
every 1/60th of a second, rather than once every
10 seconds
26