Title: Overview
1Overview Management of NORM in Saudi Aramco
- Khalid Mously, Michael Cowie
- Saudi Aramco
- Environmental Protection Department
2Outlines
- Brief history of NORM
- Origins Where NORM accumulates
- NORM exposure scenarios
- NORM levels
- Workers Protection
- NORM Management Program
3NORM Definition
- Naturally Occurring Radioactive Material (NORM)
any nuclide that is radioactive in its natural
state ( i.e. not man-made), but not including
source, by-product, or special nuclear material.
4Brief History
- Early accounts of NORM
- Canadian oil field (1904)
- Radium in Russian fields (1930)
- Uranium in gas formations (1953)
- NORM in north sea (1985)
- Guidelines (API, IAEA, etc.)
- Regulations
5Origins of NORM
- NORM in earth crust
- NORM in reservoir rock formations
- NORM in Formation water
- NORM in Natural gas
- NORM in Sea water
Uranium ppm Thorium ppm
Limestone 0.03 - 27 0 - 11
Sandstone 0.1 - 62 0.7 - 227
6Which NORM !
- NORM nuclides of interest to oil industry
-
- Radium-226 Radium-228
- Uranium
- Radon-222
- Lead-210
- Polonium-210
7Uranium-238 4.5 By
Principal decay Scheme of Uranium
Th-234 Pa-234 U-234 Th-230.
Radium-226 1620 Y
Radon Daughters
Radon-222 3.8 d
8Relative Penetrating Power
9Radiation Emitted by NORM
- Gamma rays
- Ra-226 and Pb-210
- Beta particles
- Ra-228, Pb-210, Bi-210
- Alpha particles
- Ra-226,U-238,Po-210 and Pb-210
10Where NORM accumulates
- NORM may accumulate in the following media
- Scale
- Scrapings
- Sludge
- Thin films (radon progeny)
11NORM in Scale
- Types of scales
- Sulfate SrSO4 and BaSO4 (RaSO4)
- Carbonate CaCO3 (RaCO3)
- Effect of water mixing
- Change in pressure/temperature
- Scale accumulates in production tubing, well
head, valves, and pumps - Scale inhibitors
12NORM in Scale
13NORM in Pipelines Scrapings
- Crude pipelines
- (Radium Pb-210)
- Seawater pipelines
- (Uranium)
14 NORM in Gas Processing Facilities
Boiling Point (?K, 1 Atm)
Ethane 185
Radon 211
Propane 231
- Radon progeny
- Pb-210 (22 years)
- Po-210 (138 days)
- Bi-210 (5 days)
- Form thin films on compressors, reflux pumps,
control valves, product lines/vessels.
15NORM Exposure Scenarios
- Contamination
- Inhalation
- Ingestion
- Absorption
- Irradiation
- External Exposure
-
16NORM Health Impact
- No short-term acute effects
17NORM Regulations
- Specifies contamination limits
- Equipment, waste and soil
- Nuclide dependent
- Country dependent
Country Limit of 226Ra (pCi/g)
Canada 8
UK 10
USA 5 to 30
18NORM Levels
World wide reported levels of NORM
19NORM in Natural Gas
- Radon gas (Rn-222)
- EPA limit for Radon in air is 4 pCi/ liter
Medium Specific activity pCi/liter
Natural gas 0.14 5400
NGL 0.27 40500
Propane 0.27 113400
20Workers Radiation Dose
- A workers dose depends on
- Type of work
- Cleaning vessels/tanks
- Maintenance
- NORM activity
- Time
- Protective measures
21Workers Protection
- Awareness/training
- Protective clothes
- Respirators use
- Practice good hygiene
- Limited work scenarios
22Summary
- NORM is a global issue for the oil gas industry
- NORM health hazards are controllable
- Implementing NORM procedure will not obstruct
operations - NORM limit varies
23Management of NORM in Saudi Aramco
24Management of NORM in Saudi Aramco
- International Radiation Protection Standards
- International Commission on Radiological
Protection (ICRP) - National Radiation Protection Regulations
- King Abdul-Aziz City for Science and Technology
(KACST) - Saudi Aramco Standard
- Management of Technologically Enhanced Naturally
Occurring Radioactive Material (NORM) - Saudi Aramco Guidance
- NORM Guidance Manual
- NORM Workers protection and contamination control
guidance
25Development of NORM management guidelines
- Saudi Aramco Standard, Management of
- Technologically Enhanced Radioactive Material
(NORM)
- Transport of NORM Contaminated Materials
- NORM Contaminated Equipment
- Decontamination
- Disposal of NORM Waste
- Responsibilities
- NORM Surveys
- Workers Protection
- Contamination Control
- Confined Space Entry
- NORM contamination limits
26Management of NORM in Saudi Aramco
- NORM Strategy
- NORM monitoring
- Safe management of NORM contaminated equipment
- Control of NORM waste
- Workers protection and training
- Development of NORM management guidelines
27(No Transcript)
28NORM Management Process Cycle
NORM Monitoring
NORM Detected?
Identify NORM Contaminated equipment/waste
Assess Radiological Risks
Yes
No
Normal Operation
NORM Contaminated Equipment
Workers Protection Contam. Control
NORM Waste
NORM Free Equipment
Decontaminate NORM equipment
Interim Storage of NORM equipment
NORM waste Interim Storage
NORM Waste
Release for general use
NORM Waste Permanent Disposal
29Management of NORM in Saudi Aramco
- Emphasis on partnering
- Understanding of the operational process is
important - Work with proponents to adapt control measures to
operations - Cooperation rather than imposition
- Awareness and training
30Recommendations
- Identify the problem
- Develop a strategy
- Plan actions
- Establish controls
- Awareness and training
- Cooperation and inclusion
- Continued re-evaluation
31(No Transcript)
32NORM Screening Zone - Al Midra Reclamation
33(No Transcript)