Title: CE 3205 Water and Environmental Engineering
1CE 3205 Water and Environmental Engineering
2SPILLWAY
- A spillway is a structure used to provide for the
controlled release of flows from a dam or levee
into a downstream area, typically being the river
that was dammed. - to prevent overtopping and possible failure of
the dam.
Four Mile Dam, Australia Ogee Spillway
3Upper South Dam, Australia Ogee Spillway
4Sourcehttp//www.leanhtuan.com/
5Hoover Dam Spillway Crest
6Hoover Dam Spillway
7New Cronton Dam NY Stepped Chute Spillway
8Sippel Weir, Australia Drop Spillway
9Four Mile Dam, Australia Ogee Spillway
10Upper South Dam, Australia Ogee Spillway
11Itaipu Dam, Uruguay Chute Spillway
12Itaipu Dam Flip Bucket
13- Common type of spillways
- Free over fall/straight drop spillways
- Overflow or ogee spillways.
- Chute spillways
- Siphon saddle spillway
14- Free overfall or straight drop spillway
- In this type, water drops freely from the crest.
- Occasionally the crest is extended in the form of
overhanging lip to direct small discharges away
from the face of overfall section.
15- Ogee or overflow spillway
- The Ogee spillway is generally provided in rigid
dams and forms a part of the main dam itself if
sufficient length is available.Ā - The overflow type spillway has a crest shaped in
the form of an ogee or S-shape. - The upper curve at the crest may be made either
larger or sharper than the nappe.
16- Chute spillway
- chute spillways are used in flow ways where water
is to be lowered from one level to another and
where it is desirable to avoid a stilling basin. - These are mostly used with earth dams and have
the following merit. - It can be provided on any type of foundations.
- Simplicity of design.
- However this type of spillway should not be
provided where too many bends are to be given as
per topography.
Baffle apron or chute spillway
17- Saddle spillways
- A siphon spillway is a closed conduit system
formed in the shape of an inverted U. - This type of siphon is also called a Saddle
siphon spillway. - Siphonic action takes place after the air in the
bend over the crest has been exhausted.
18Required spillway capacity
- Spillway capacity should be equal to the max.
outflow rate determined by flood routing. The
following data are required for the flood
routing. - Inflow flood hydrograph-Indicates rate of inflow
respect to time. - Reservoir capacity curve-indicates the reservoir
storage at different reservoir elevations. - Outflow discharge curve-indicates the rate of
outflow through spillways at different reservoir
elevations.
19Overflow Spillway
Basic equation flow over weirs,
Where Qdischarge m3/s Cdcoefficient of
discharge Leeffective length Heactual effective
head
Hddesign head Hahead due to velocity of
approach (sometimes neglected)
Le effective width of crestL net width of
crest(clear waterway x no.of spans)N
number of piersKp pier contraction
coefficientKa abutment contraction coefficient
20 Contraction Coefficients
Table 1 Pier Contraction Coefficient (Kp)
Table 2 Abutment Contraction Coefficient (Ka)
Pier contraction coefficient depends on several
factors such as shape and location of pier nose,
thickness of piers and velocity of
approach. Abutment contraction coefficient
depends on factors such as shape of abutment and
velocity of approach.
21- Downstream profile
- d/s profile of spillway can be represented by
x,y coordinates of the point on the spillway
surface Hddesign head K,n constant, depend on
inclination of the upstream face of spillway
22Different inclination of upstream face of spillway
For overspillway/ogee, the upstream face is
vertical
- The slope of the d/s face of the overflow dam
usually varies in the range of 0.71 to 0.81 - Z is total fall from the upstream water level to
the floor level - P is height of spillway crest above the bed.
- Y depth of flow at toe
- R is radius
- V is velocity of flow at toe
23slope of the d/s face of the overflow section
24C. vs. ?
25Cd. vs. (P/Hd)
(P/Hd)gt1.33, velocity is neglected
26Tailwater Effect on C
27Problem 01
- Problem 01 An overflow spillway with the
upstream face vertical is to be designed for a
flood peak of 3000 m3/s. The height of the
spillway crest is kept at RL 130.50 m. The
average river bed level at the site is 102.50 m.
The number of spans is 6, clear waterway between
piers is 12 m, thickness of the pier is 2 m, pier
contraction coefficient, Kp 0.02 and abutment
contraction coefficient, Ka 0.20 for the effect
of end contraction. Assume the coefficient of
discharge is 2.20 and the slope of the d/s face
of the overflow section is 0.8 1. - Determine the design head by neglecting the end
contraction. - What will happen if the design head is determined
by taking the effect of end contraction of piers
and spans? - Determine the tangent point of x ordinate of
the downstream - profile from the origin of the crest.
R.L is reservoir level
28Solution
- Peak flow, Q3000 m3/s.
- The no. of spans is 6,
- clear waterway between piers is 12 m,
- thickness of the pier is 2 m,
- pier contraction coefficient, Kp 0.02
- abutment contraction coefficient, Ka 0.20
- Coefficient of discharge, C is 2.20
- Slope of the d/s face of the overflow section is
0.8 1.
Determine the design head by neglecting the end
contraction.
Neglecting the end contraction, so we calculate
L L L clear waterway x no.of spans L12 x 6
72m
29a) Determine the design head
b) design head is determined by taking the effect
of end contraction of piers and spans
N6 Kp0.02 Ka0.2
30PHeight of spillway crest at R.L- average river
bed level at the site 130.5-102.5 28 m
Check, P/Hd 28/7.11 3.94 greater
than 1.33 So effect of velocity can be
neglected HeHdHa(due to velocity0) He Hd
c) Determine the tangent point of x ordinate of
the downstream profile from the origin of the
crest. .
For vertical upstream K2, n1.85
31Differentiate both sides with respect to x
Since slope of the d/s face of the overflow
section is 0.8 1, So...
32End