Title: INDIA AIDC IMPLEMENTATION STATUS AND ISSUES


1
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
  • Presented by
  • Airports Authority of India
  • Mini Seminar AIDC 23rd July 2013

2
ATM Automation systems in India
  • Raytheon(AT3) Delhi, Mumbai
  • Raytheon (AT3) Chennai
  • Indra (Aircon2100) at 38 mid/small sized airports
  • Indra (Aircon2100) at Kolkata Under
    Installation
  • Selex ATM System at Bengaluru and Hyderabad
  • Kolkata(New ATM system under installation)

3
AIDC Status
  • Delhi (AT3) AIDC with
  • Ahmedabad (Aircon2100)
  • Nagpur (Aircon2100) Implemented
  • Varanasi (Aircon2100)
  • Mumbai (AT3) AIDC with
  • Chennai (AT3) Under trial operation
  • Muscat Planned
  • Karachi Planned (initial testing carried out)
  • Chennai (AT3) AIDC with
  • Mumbai Under trial operation
  • Bengaluru
  • Hyderabad Planned and configured
  • Cochin
  • Kuala Lumpur
  • Male(Maldives) Planned
  • Colombo

4
AIDC Implementation Issues
  • Diverse ATM systems at ATSUs
  • Some issues in Aircon2100 (under resolution)
  • Non display of NO, CO in radar data block.
  • Generation of MAC msg on termination of FPL.
  • Route terminator "T" to be configured which
    affects AMAN profile/trajectories of the pairing
    stations
  • When the actual boundary ETO in an ABI varies
    from the system calculated ETO (based on the
    EOBT) of the overflying aircraft, the system
    rejects the ABI message with an LRM.
  • SSR codes of pairing unit sometimes do not match
    due to limited available codes.

5
Challenges in AIDC Implementation
  • Interoperability between diverse ATM Systems.
  • Implementation and system design issues
    attributed to revision of AIDC ICD versions.

6
Suggestions
  • HMI for AIDC functionalities may be considered to
    be included in AIDC Guidance Material.
  • To avoid prohibitive cost of frequent ATM
    Automation systems upgrade, backward
    compatibility of ICD versions should be assured.
  • AIDC messages need time bound response within a
    short span of time for effective operations.
    Therefore, higher priority than normal flight
    plan messages may be considered for AIDC messages.

7
Thanks for Kind Attention