1Diagram Activities
2Dimensionless Block Diagram
The dimensionless block diagram is the first
layout attempt and the result of the activity
relationship chart and the worksheet. Even
though this layout is dimensionless, it will be
the basis for the master layout and plot plan.
3Dimensionless Block Diagram
Cut up a piece of paper into about 2 x 2
squares. Indicate the activity number and place
the relationship codes in the positions indicated
below.
4Dimensionless Block Diagram
Once the pieces are ready, arrange the components
in order to satisfy as many activity codes as
possible. Arrange the A codes first (full side
touching), E codes next (at least one corner
touching), and so on. No X relationships
should be touching. Grade your solution. . .the
fewer number of checks, the better.
5Dimensionless Block Diagram
Completed Dimensionless Block Diagram Example
6
1,5
4
11
1
10
5 X8
6
10
11
14
2,3,14
9
12
1
9,14
1,3
2,6
3,10
7
4
1
2
8
6
9,11,13,14
14
5,9,13
4,5,12
9,12,13
2,4
3,7
6,8
4,8
12,13
4
3
7 X6
6
9,12,13
9,12,13,14
5
14
13,14
9
13
9
12
1,4
4
2,3,5,6,8,10
1,2,3,5,8
9,13
9,12,14
14
13
4,5,6,8
7,11
1,4
2,3,5,8
6Activity Relationship Analysis
- The activity relationship diagram
- The worksheet
- The dimensionless block diagram
- The flow analysis
7Flow Analysis
Flow analysis is now performed on the
dimensionless block diagram. Starting with
receiving (5), show the movement of materials to
stores (6), fabrication (1), welding (2), paint
(3), assembly and packing (4), warehouse (7), and
to shipping (8). Material should flow through
the facility and not skip areas. Additionally,
shipping and receiving should not be in the
middle of the building.
8Flow Analysis
Flow Analysis on the Completed Dimensionless
Block Diagram Example
6
1,5
4
11
1
10
5 X8
6
10
11
14
1
2,3,14
9
12
9,14
1,3
2,6
3,10
7
4
1
2
8
6
5,9,13
9,11,13,14
4,5,12
14
9,12,13
2,4
3,7
6,8
4,8
12,13
4
3
7 X6
6
9,12,13,14
5
9,12,13
14
13,14
9
13
9
12
1,4
2,3,5,6,8,10
4
1,2,3,5,8
9,13
9,12,14
14
13
4,5,6,8
1,4
7,11
2,3,5,8
9Engineered Planning Approach
- Computer-Aided Approach Phases
- Decision Support Systems
- Computer-Aided Space Planning
- Computer-Aided Design
- Management Information Systems
10Engineered Planning Approach
- Computer-Aided Software
- CRAFT (computerized relative allocation of
facilities) - ALDEP (automated layout design program)
- CORELAP (computerized relationship layout
planning)
11Benefits Pitfalls
- Visual representation
- Easy to understand
- Rational explanation
- Reduced nonvalue activities
- Inventory reduction
- Focused on material transport issues
- Dynamic systems
- Relationships are usually omitted
12Questions Comments