Context, Part I - PowerPoint PPT Presentation

1 / 35
About This Presentation
Title:

Context, Part I

Description:

Context, Part I – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 36
Provided by: Ste8352
Category:
Tags: context | part

less

Transcript and Presenter's Notes

Title: Context, Part I


1
(No Transcript)
2
Context, Part I
3
Context, Part II
4
Key Conclusions
  • There are companies that successfully wed profit
    and purpose.
  • Developers are more important than architects.
  • I should become a developer.

5
The LivingHomes customer
  • 1. Appreciates products with great design (form
    and functionality)
  • 2. that are healthy and built in a sustainable
    way.
  • 3. But they cant find homes that reflect their
    values.

6
Our consumers/Us
  • Desire
  • A living solution. A home.
  • Minimized ecological footprint. Third party
    verification of claims.
  • Great price value minimal hassle.
  • Our response
  • Secure top architects. Design homes for living.
  • Extremely comprehensive, LEED certified
    environental program.
  • Proprietary prefabricated building systems to
    create homes better, faster, cheaper, with
    minimal waste.

7
Ray Kappe LivingHomes
RK1
RK2
RK5.1
RK4.1
8
Kieran Timberlake LivingHomes
KT1.1
KT1.2
KT1.2
KT1.3
9
The first LivingHome Factory Production
(10/05-4/06)
10
Model home
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
Model home
21
WIRED LivingHome
22
WIRED LivingHome
23
WIRED LivingHome
24
WIRED LivingHome
25
KOHLER LivingHome
26
KOHLER LivingHome Living / Dining Room / Kitchen
27
KOHLER LivingHome Bonus Room
28
KOHLER LivingHome Master Bedroom
29
KOHLER LivingHome Master Bathroom
30
KOHLER LivingHome 2nd Bedroom / Nursery
31
Z6 Environmental Design Program
32
Our Development Process
  • Based on perceived market demand, ID product type
    we want (size, features, price).
  • Select architect.
  • Develop Product Requirements Doc.
  • Iterative design process with SE, manufacturer.
  • Secure client. (Repeat.) Architect serves as
    Designers LivingHomes does PA, CA, PM.

33
Key Characteristics of LivingHomes Architects
  • Form/Function design orientation.
  • Sustainable design experience.
  • Building system experience.and
  • Willingness to work like an industrial designer
  • Design flexibility.
  • Our deal payment, royalty.

34
Architecture versus Product Design
35
The Prefab Advantage
  • (Our) reality
  • NOT FOR ONE! Prefab wants to do volume!
    Transport is non-trivial.
  • Can be, but potentially more time with
    consultants, subs.
  • Yes, but youll spend much time in CA getting
    there.
  • No question.
  • Implied advantage
  • Less expensive.
  • Faster.
  • Better quality.
  • Less waste.
Write a Comment
User Comments (0)
About PowerShow.com