NENA Technical Committee Status Report - PowerPoint PPT Presentation

1 / 27
About This Presentation
Title:

NENA Technical Committee Status Report

Description:

NENA Technical Committee Status Report – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 28
Provided by: mike311
Category:

less

Transcript and Presenter's Notes

Title: NENA Technical Committee Status Report


1
NENATechnical Committee Status Report
  • Florida 9-1-1 Database Group
  • March 8, 2007

Delaine Arnold, NENA Data Technical Committee
Chair, dmarnold_at_verizon.net
2
Data Technical CommitteeStatus Report
  • Chair Delaine Arnold, dmarnold_at_verizon.net
  • Vice-Chair Kim Leigh, kim.leigh_at_qwest.com

3
Status ReportData Technical Committee
  • 02-010 DEF Standards approved 02/25/2006
  • Established VoIP classes of service
  • Exhibit 22 for GIS mapping
  • XML updated to accommodate i2 Standard
  • 02-013 Data Standards for the Provisioning and
    Maintenance of MSAG Files to VDBs and ERDBs
    approved 01/09/2007

4
Status ReportData Technical Committee
  • 02-011 DBM Standards approved 11/21/2006
  • Changed Dial Tone Provider to Access
    Infrastructure Provider
  • FX/DPA/OPX Standard
  • VoIP Shell Record
  • Jurisdictions access to DBMS
  • NENA ID Responsibilities
  • When an ALI record is required
  • Fictitious Addresses
  • PSAP Managers List of NENA Company IDs

5
  • General LNP standards
  • U function code expires after 90 days. Deleted
    from DBMS and ALI
  • NPAC/LERG validation
  • Statistical reports identifying by NENA ID
    stranded unlocks more than 30 days old sent to
    the 911 database stakeholder
  • NPDI Standards modified to include VoIP
  • Exhibit F through J flow charts revised
  • VoIP Testing Scenarios

6
Status ReportData Technical Committee
  • 02-014 NENA GIS Data Collection and Maintenance
    Standards public review completed many
    comments being addressed by WG
  • 02-501 NENA Wireless (Pre-XML) Static and Dynamic
    ALI Data Content TID October 16, 2006

7
Status ReportData Technical Committee
  • 2007 Tasks/Issues
  • Review 02-010 and 02-011 to ensure still current
  • Determine alternatives for distributing 9-1-1
    data current method NPA/NXX does not work with
    porting
  • Develop written processes to resolve Wireline,
    Wireless VoIP NRFs and ANI/ALI discrepancies
  • Create XML schemas for GIS data model
  • Create standard sub-location fields USPS Pub 28

8
  • Pilot/Subline processing
  • XML Schema Updates
  • Add MSAG FOCs
  • Customer Name format (last, first)
  • Ongoing updates, as required/requested
  • Compare ALI format with ITEF PIDF-LO (Presence
    Information Data Format Location Object)

9
Network Technical CommitteeStatus Report
  • Chair Anand Akundi
  • akundi_at_telcordia.com
  • Vice-Chair John Garner, ENP John.Garner_at_cingular
    .com

10
Status ReportNetwork Technical Committee
  • Internetworking WG
  • Seeking a solution that will allow
    interoperability between different SR platforms.
  • Originating PRI Requirements WG
  • Focus is on defining any specifics necessaryfor
    using Originating PRI that might not be covered
    in the landline SS7 TID

11
Status ReportNetwork Technical Committee
  • Functional Entity WG
  • Reviewing impact of VoIP to 9-1-1 Functional
    Entity Model - new functional elements being
    added to address the i2 solution
  • Voice Circuit Standards WG
  • Address trunk group sizing guidelines
    finalizing document

12
Status ReportNetwork Technical Committee
  • Network Quality Assurance and Design WG
  • Goal is to publish a NENA Standard detailing
    Network Quality Assurance Design, including a
    section on contingency planning and
    survivability.
  • Default Call Path WG
  • Goal is to develop a TID identifying various
    network arrangements for all types of
    default routing and overflow treatment
    in landline, VoIP and wireless technologies

13
Status ReportNetwork Technical Committee
  • Geographic Number Portability WG
  • Identify all impacts of GNP on 9-1-1
  • Rate Center Consolidation WG
  • 03-505 NENA TID on Rate Center Consolidation,
    Issue 1, 11/08/2006, exposes the potential
    impacts of RCC to reliable E9-1-1 service if
    appropriate precautions arent taking during the
    planning stages

14
Status ReportNetwork Technical Committee
  • ESRN/ESQK WG
  • Drafting a TID that provides a reference and
    guidelines for Public Safety Authorities, E9-1-1
    SSPs, VPCs and VSPs on the assignment of ESQKs.
  • 20-Digit for VoIP Calls (ESGW-to-SR)
  • Research switch capabilities with respect to
    20-digit support

15
CPE Committee Status Report
Chair Mike Vislocky, mike_at_netorange.com Vice
Chair David Hayes, ENP, david.w.hayes_at_verizonbus
iness.com
16
Status ReportCPE Technical Committee
  • NENA 04-005, ALI Query Service STD - Published
    11/21/2006
  • Defines NENA XML ALI Query Service (AQS)
  • Specifies new protocols between the PSAP and the
    Next Generation Emergency Services Network
    (NGESN)
  • Provides the rationale behind the AQS and how it
    relates to the current ALI protocol
  • Provides a detailed description implementation
    alternatives

17
Status ReportCPE Technical Committee
  • IP Capable PSAP (NG9-1-1)
  • Requirements Documents
  • Standards Documents
  • Transition Planning

18
VoIP/Packet Technical CommitteeStatus Report
Chair Nate Wilcox, nwilcox_at_microdatagis.com
Vice-Chair Roger Marshall, rmarshall_at_telecomsys
.com
19
VLWG Location Work Group
  • Review of Scope and Goals
  • Location Determination
  • Location Acquisition
  • Milestones
  • TRD TID Published
  • Liaison Updates
  • IETF
  • ESIF
  • Other SDO interaction
  • Possible Future VLWG Work
  • Access technology gap analysis
  • Discussion of VLWGs path forward

20
VMWG Migratory WG Update
  • i2.5
  • New prioritized list of issues being worked
  • Some existing i2 issues to look at
  • Weekly meetings (Monday AM)
  • Contributions to solutions encouraged

21
LTD (i3) Update
  • i3 TRD (08-751) published (Dec 2006)
  • The i3 Architecture document (Functional and
    Interface Standards for NG 9-1-1)
  • sent out to outside SDOs for comments
  • document could be ready by 2Q2007, but
  • IMS vs. non-IMS documentation imbalance
  • additional contributions requested!!
  • All i3 documents create the foundation for NG
    9-1-1 work

22
Non-Traditional Technical CommitteeStatus Report
  • Chair Tony Busam, tbusam_at_rcc.com
  • Vice-Chair Dave Irwin, d.irwin_at_emd.wa.gov

23
Status ReportNon-traditional Technical Committee
  • Automatic Collision Notification (ACN) / Vehicles
    Telematics
  • Describe in technical as well as operational
    terms the current telematics industry and
    telematics emergency calls and associated
    information delivered to Public Safety Answering
    Points (PSAPs)
  • Reflects on the current 9-1-1 infrastructure, the
    Next Generation Emergency Networks, and discusses
    integration of telematics emergency calls and
    information into those networks, including to
    9-1-1
  • Provide NENA and other interested parties
    guidelines to develop new communications
    methodologies and protocols to facilitate
    emergency communications between Telematics
    Service Providers (TSP) and PSAPs

24
  • NEW
  • JOINT
  • TECHNICAL OPERATIONS
  • COMMITTEE

25
Next Generation 9-1-1 Transition Planning
Committee (NGTPC)
  • CO-CHAIRS
  • Technical David Jones
  • Operations Bill McMurray
  • CO-VICE-CHAIRS
  • Technical Bob Sherry
  • Operations Jim Goerke

26
Mission
  • The NGTPC will define transition plans for the
    migration from the legacy E9-1-1 environment to
    Next Generation 9-1-1 systems supporting
    emergency services. The scope will focus on three
    categories of networks and associated subsystems
    originating networks, the core emergency services
    network(s) and PSAP Networks, and the necessary
    operational, service and management features
    required for the overall NG9-1-1 system to
    function.

27
  • THANK YOU
  • Contact either the Committee Chair or Committee
    Vice-Chair to join any of the WGs described.
Write a Comment
User Comments (0)
About PowerShow.com