Title: Status of
1Status of
- Eric Kajfasz
- CPPM/Fermilab
- GDR-Susy, Lyon - 26 novembre 2001
2The D0 detector
3Short history of RunII so far ...
Run 2, the big picture
Shutdown 2004
4L0 Trigger and Luminosity Monitor
Level 0 trigger luminosity counters
August 1 ? Oct 7
Delivered 9.5 pb-1 Exposed 6.8pb-1 use for
all data taking ( commissioning tests
physics) Global 3.5pb-1 for global physics runs
5Silicon Tracker
real life
6 barrels 12 F disks 4 H disks
800K channels completed hook up by May 2001 ?
85 live channels
After November shutdown ? About 95 live channels
Results from SMT tracking only measure
interaction vertex
X, Y vs. Z
X vs. Y
?Moved detector by 4 (X) and 5mm (Y)
6Silicon Tracker
Noise 1 to 2 counts
Cluster charge 25 counts/MIP
7Silicon Tracker
8Silicon Tracker - b tagging
IP signif.
First hint of an impact parameter signal from
Bs Very encouraging!
9Central Fiber Tracker
8 layers of axial and stereo 800um fibers
94 boards installed (74 axial/12 stereo)
10SMT - CFT alignment
11Calorimeter Electronics Upgrade
- 55k channel Ur/liq. Argon calorimeter
- Run II upgrade
- replacement of electronics to accommodate faster
bunch crossings - 55k dual FET PreAmps
- 23k Switch Capacitor Arrays (SCA) on
1200 BaseLineSubtraction (BLS)-boards - 50 bad channels (0.1)
Trig. sum
Bank 0
Calibration
SCA (48 deep)
electronics readout chain
SCA (48 deep)
x1
Filter/ Shaper
Output Buffer
Preamp/ Driver
BLS
SCA
x8
Calorimeter
SCA (48 deep)
SCA (48 deep)
Bank 1
12Calorimeter Performances
SCA-behavior pedestal measurement over all
channels of 1 chip spread 1ADC count
Timing Studies using triple sampling runs all
crates timed in at 10ns
Energy Scale estimation from electronic
calibration absolute scale verified at 10
ADC counts
L1 SCA up
pulser ADC-readout
L1 SCA down
pulser shaper output
L2 SCA
13Calorimeter W/Z events
Z ?ee candidate 2 EM objects, ET gt 20
GeV, isolation and shower shape cuts
m(e,e) L0.7pb-1
DØ
DØ
mT(e,n) L0.7pb-1
MZ
un-calibrated energies
un-calibrated energies
transverse mass (GeV)
invariant mass (GeV)
14Calorimeter jet events
?-jet event ET?27 GeV em-fraction 0.9
2-jet event ETjet1230 GeV, ETjet2190GeV
Etjet24GeV em-fraction 0.5
DØ
Run I- jet corrections
DØ
0.7 cone
15Muon System
16Inter Cryostat Detector
- multiple improvements during shutdown
- all tiles/phototubes installed
- ready for data taking
17Forward Proton Detector
- Installation in the tunnel and in the hall
progressing well - Continue commissioning
18Trigger and DAQ
19L3 calorimeter trigger
EM clusters, pT gt 10 GeV Isolated, EM fraction gt
0.9 ? lt 1.1
Jets, pT gt 15 GeV R 0.7 cone ? lt 1.1
20Outlook
- Pre-shutdown data analysis proves efficient
operation of most detector sub-systems, including
hardware and software - Shutdown jobs were successful and accomplished on
schedule - AFE installation will continue during next 2
months in parallel with Fiber Tracker and Fiber
Trigger commissioning - Starting post-shutdown operations with few dead
channels in most systems, a new Linux L3 farm and
improved DAQ system
21Outlook
- Have a well defined list of goals for operation
during December-January to be ready for Spring
Conferences - Concentrate on global physics data taking
- Reasonably minimize amount of special runs
- Tevatron plan is to provide colliding beams
starting late November - No major shutdown planned until next summer
- Will start from the same luminosity as before the
shutdown - Ramp luminosity to 1-2x1031 in January
- 1 day of studies per week
- Longer term plan is to get luminosity of
5-10x1031 by next summer - Expect 400 pb-1 by the end of 2002
22Part of the future Silicon for RunIIb