Title: OMP Observation Management Project Software Suite JCMT UKIRT
1OMPObservation Management Project Software Suite
JCMT UKIRT
- Remo Tilanus
- JAC/NWO
- Radionet Synergy Meeting, Sep. 23-24 2004,
Dwingeloo, Netherlands
2(No Transcript)
3JCMT Instruments
- SCUBA dual-wavelength submillimetre bolometer
array operating at 850µm 450µm with 2 arcmin
field of view - RxA single-polarization, dual sideband
heterodyne receiver covering 230 GHz band - RxB dual-polarization, single sideband
heterodyne receiver covering the 345 Ghz band - RxW dual-polarization, single sideband
heterodyne receiver covering the 460/490 GHz and
690 GHz band.
4Operations
- A 16-hour on-the-sky operation is supported
nightly by a telescope system specialist and a
visiting observer. - Programs are dynamically scheduled observations
are selected based on the TAC priority and
current weather conditions five bands 1(best)
5 (worst).
- Observing time is divided over the three partner
countries, the U.K. (55), Canada (25), and The
Netherlands (20), after allocation of a share to
the Univ. of Hawaii (10) and international
observers (10). - The JCMT is operated on behalf of the three
partner countries by the Joint Astronomy Centre
(JAC) which is based in Hilo (the JAC also
operates the United Kingdom Infra Red Telescope,
UKIRT).
5Operations Weather
6OMP Principles Requirements
- Dynamically scheduled, service-mode observations
will(!) at minimum result in data equal in
quality to those of an average experienced
observer
- Intense feedback loop with P.I.
- same level of interactive control as classical
observing to ensure quality but also to maintain
spirit of ground-based observing.
Procedures and Tools must ensure feedback!
Telescope Agnostic Software !
DB Agnostic
- Stringent quality control.
- complication external observers since youll
lack the necessary staff. This observer can be
inexperienced!
Procedures and Tools must ensure quality!
7OMP Observation Management Software Suitemain
components
- Observing Tool (JCMT-OT) Phase-II observations
tool for science program submission to OM
database. - Query Tool (JCMT-QT) Observation Query tool
presents a ranked list of observations
schedulable given the time of the night, current
weather conditions, and program and instrument
constraints. - Observations as defined by PI are directly
submitted to the telescope control system.
8OMP Observation Management Software Suitemain
components (cont.)
- Pipeline (ORAC-DR) Sophisticated pipeline that
provides real-time co-adding, analysis, and
visualization of observations. Enables immediate
quality control, observation assessment, and
completion checks. - Feedback System Observer log, shift log,
thumb-nail images (WORF), project progress
administration, time accounting, fault tracking,
secure data downloads, logging of emails between
PIs and local support staff. Real-time and
near-time feedback and full archiving of
meta-data.
9OMP Observation Management Software Suite
Mantra If things are going predictably right, no
staff should have to do anything. Neither if
things are going predictably wrong. Requires
total machine readability at every stage of the
project lifecycle. Rely on people to assess
science, dont rely on them for grunge-work.
10Observation Management Software Suite
400,000 lines Code doc
OMP Software Suite
11Observing Tool the Science Program
.
12Query Tool Scheduling
.
13Query Tool Scheduling
.
14Pipeline Reduction Quick view coadds
.
15Pipeline Reduction Quick view analysis
.
16OMP Feedback1
Project Summary
.
17OMP Feedback2
.
18OMP Feedback2
.
19OMP Feedback2
WORF Eavesdrop
.
20OMP Feedback5
Feedback Comments
.
21OMP Feedback4
.
Associated Faults View
22Observation Management Software Suite
Observation Management Software Suite
23ORAC-DR Pipeline Features Automation
- Its a pipeline - no interaction required near
real-time - Determines observing mode and executes a default
recipe or one specified by the observer - Combines observations of the same
source/wavelength/mode
24PipelineOff-line use
- Runs off-line as well as on-line
- Is used for determining calibration history of
the telescope and for blazar monitoring. - Has been used to automatically reduce all skydip
observations from the archive
25Return_value subroutine(parlist) Subroutine(parl
ist)
26OMP integrated accounting and fault tracking
system
27 End
28 29Editorial note switch to Web browser!
.