Civil Construction Issues in PD2 Linac Upgrade - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Civil Construction Issues in PD2 Linac Upgrade

Description:

Need an 805 MHz buncher cavity about every 30 meters in injection line ... 8-foot berm (approx) above grade. Steel is three times better than dirt. 19': Good! ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 10
Provided by: Elliott64
Category:

less

Transcript and Presenter's Notes

Title: Civil Construction Issues in PD2 Linac Upgrade


1
Civil Construction Issues in PD2 Linac Upgrade
  • Elliott McCrory, et al.
  • March 21, 2002

2
(No Transcript)
3
Build this when Booster gets decommissioned
New Equipment Gallery
4
Sighting Issues
  • New equipment gallery cannot invade Booster
    shielding
  • Or new Linac shielding
  • Need an 805 MHz buncher cavity about every 30
    meters in injection line
  • Put the Klystrons as close to cavities as
    possible
  • Will put the four new cavities fairly far down
    the injection line.
  • Can move these up if/when there is an energy
    upgrade

5
Size of a Side-Coupled Module
15 inches
30 inches
50 inches
30 inches
24 inches
6
Size of the Tunnel?
11 ft.
8 ft.
3 ft.
3 ft.
1 ft.
7
With an Unknown Thing Down The Side
10 ft.
5 ft.
3 ft.
8
Depth of Linac Upgrade Segment
13 bad!!
7620
19 Good!
7500
7490
Existing Linac
7420
7360
7306
New Linac Segment
7226
8-foot berm (approx) above grade. Steel is three
times better than dirt.
9
Other Shielding Issues (M.F.)
  • Low-energy end
  • X-Rays from any new RFQ will require new
    enclosure around it
  • Backscattering of neutrons must be reduced from
    present levels
  • 400 MeV Labyrinth
  • Must make the bend to the new Linac section very
    cleanly
  • Electronic protection of transfer line
  • More dirt on new Linac section enclosure!