IceCube Deployment Monitoring System (PTS) - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

IceCube Deployment Monitoring System (PTS)

Description:

IceCube Collaboration Meeting, Bartol, March 2004. Requirements ... RS232 (300 baud) RS485 (9600 baud?) DAQ. Integration. Data merging. Readout during freeze-in ... – PowerPoint PPT presentation

Number of Views:30
Avg rating:3.0/5.0
Slides: 10
Provided by: kurtwos
Category:

less

Transcript and Presenter's Notes

Title: IceCube Deployment Monitoring System (PTS)


1
IceCube Deployment Monitoring System (PTS)
  • Kurt Woschnagg, Ryan Bay
  • UC Berkeley
  • IceCube Collaboration Meeting, Bartol, March 2004

2
Requirements during deployment
  • How deep is the string?
  • Is it still moving
  • or is it . . . sk?
  • Save data for post-deployment analysis

3
Post-deployment requirements
  • Analyze data
  • drop speed
  • deployment speed
  • string stretching
  • Monitor freeze-in (p, T)
  • Ambient temperature profile

4
temperature
pressure
drill
5
Pressure sensors
Paroscientific 0-4000 m, also
temp. RS232/RS485 Temperature corrected 6k
Keller 0-2600 m (formerly 2000 m) Needs
temperature correction Calibration curves
supplied 0.7k
  • Both used in AMANDA
  • Specs and quotes in docushare

6
Thermistors
  • Omega, model no. 4403x
  • Working range -80 to 75 C
  • Resistance (100s kO-MO) ? temperature (using
    calibration chart)
  • 0.1 degree accuracy
  • Leads spliced to service wires,
    molded onto breakout

Used in AMANDA Specs and quote in dosushare
7
Cable considerations
  • Use DOM breakout locations
  • Paro 4 wires (2 pairs), slipring
  • Keller 2 pairs, slipring
  • Thermistors 1 pair
  • All strings
  • Paro at bottom (breakout 30)
  • Keller (thermistor?) at 1900 m (b/o 15)
  • First 4 strings
  • Additional Paro at top of instrumented section
    (b/o 1), using LC quad
  • Four thermistors in bottom 400 m
  • Surface cable no wires needed for pressure
    sensors

8
b/o 1 b/o 15 b/o 30
Stand-alone DAQ (laptop with RS232/485) or Integra
ted with drill monitoring system
9
Issues
  • Responsibilities
  • Paro readout rate
  • RS232 (300 baud) ? RS485 (9600 baud?)
  • DAQ
  • Integration
  • Data merging
  • Readout during freeze-in
Write a Comment
User Comments (0)
About PowerShow.com