How to "fuska" with statistics - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

How to "fuska" with statistics

Description:

Fact: Magnetic storm = Dst = Ring current. Hypothesis: ... up to 1980's : Guillain-Barre Syndrome (GBS) (yes) medicine-1 (Steroid) (yes) medicine-2 (PE) ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 19
Provided by: myama
Category:

less

Transcript and Presenter's Notes

Title: How to "fuska" with statistics


1
How to "fuska" with statistics
For p3 science coffee 2005-12-7 Yama
2
Deliminator / null case
  • Latitude ???

3
Limit of traversal
Don't forget the orbital characteristic
(2) Longitude ???
4
Clear cases
Weak/absent
Must take over total including null
5
Can we "test" ?
  • Fact Magnetic storm Dst Ring current
  • Hypothesis Magnetic storm is the cause
  • Examine take correlation with Dst

number

Yes !
Dst0 0 -30 -30 -60 lt-60
(4) Check also AE

No !
AE 0 50 100 150 200 300 400 600
Confirm the hypothesis ! gt wrong !!
6
We need classification
  • up to 1980's Guillain-Barre Syndrome (GBS)
  • (yes) medicine-1 (Steroid)
  • (yes) medicine-2 (PE)
  • (?) medicine-3 (IVIG)

1990 establish CIDP, re-define GBS ? CIDP GBS
(never!) medicine-1 (yes) medicine-2 or
medicine-3 CIDP (yes) all
  • 2000 establish AMAN?AIDP
  • re-define GBS AMANAIDP
  • AMAN
  • (never!) medicine-1
  • (yes) medicine-2 or medicine-3
  • (best) combination of medicine-3 -1
  • AIDP (yes) medicine-2 or medicine-3

1. Steroid anti-inflammatory corticosteroids 2.
PE plasma exchange 3. IVIG intravenous immune
globulins
7
However,,,,
If we classify in MLT
AE
Dst
Different result !
8
Yet,,,
If we limit to 12 MLT, Dst is.
Dst
AE
Correlation with Dst only gt Hypothesis is right
???
9
However (2) Total number
8/39 50/154 14/26
Dst gt 0 0 -30 lt -30
  • Majority (58/72) is during Dstgt-30
  • Hypothesis is wrong !
  • correlation is "necessary condition"
  • but not "sufficient condition"
  • Making ypothesis is misleading !

What causes "majority cases" ?
10
First check axis change
Dst
AE
11
Second check past history
Dst
AE
hours
12
With number
Again, need numbers!
25 6 31 35 12 9 9 9 9 7 8 8 7
7 6 7 5 3 3 151
Dst
57 17 74 92 45 35 30 27 23 13 11 15 15 13 8 13 13
13 5 51
AE
hours
13
Without number
14
Right statement Out of 202 clear-case
traversals, 179 traversals (89) are within 12
hours after hourly AE gt 300 nT activities,
whereas only 55 traversals (27) are within 12
hours after Dst lt -30 nT activities
15
Some note on Distribution
MLT 6 9 12 15 18
double peak
hours
16
possibility
17
Distirubition
  • Most probable duration is 12 hours
  • Most probable interval 78 hours
  • gt Majority is (c) with 78 hour interval ???

18
Distirubition
  • Most probable duration is 12 hours
  • Most probable interval 78 hours
  • gt Majority is (c) with 78 hour interval ???

No ! Only 10 of intervals (3 in hours) are 78
hours
Write a Comment
User Comments (0)
About PowerShow.com