Title: Erik'Ranheimintertanko'com
1 - Erik.Ranheim_at_intertanko.com
- Manager Research and Projects
- Lloyds 7th International Product Tanker
Conference - London 14 September 2005
2Phase out
- Regulations
- 13F
- 13G
- 13H
- MARPOL Annex II
- OPA90 schedule/size limit different
- Statistics
- Conversion to PL/SBT - DH
- 2010 final year for SH tankers?
3Phase out history
- In the aftermath of Exxon Valdez, 0n 18 August
1990, the US President signed into law the US Oil
Pollution Act of 1990 (OPA 90). This was the
first regulation which has mandated double hull
design for tankers with a building contract after
30 June 1990 and with a delivery after 31 Dec.
1992 - First IMO phase out initiated by the US OPA 90 -
ratified by IMO March1992 - enforced as from July
1993 - Accelerated IMO phase out initiated by Europe as
a result of the ERIKA accident outside France -
ratified by IMO April 2000 - enforced as from
September 2001 - Further acceleration of IMO phase out initiated
by Europe as a result of the PRESTIGE accident
outside Spain - ratified by IMO December 2003,
enforced as from April 2005 - enforced by Europe
as from October 2003 - The European Unions Regulation (1726/2003) on
single hull tankers took effect on 21st October
2003 - Both ERIKA and PRESTIGE carried Heavy Fuel Oils
that can pollute up to ten times more than crude
oil. IMO therefore adopted a new regulation
Regulation 13H of Annex I of MARPOL 73/78
banning the carriage of heavy grade oil as cargo
in single hull oil tankers as from 5 April 2005.
4Phase out by segment
5Phase out SH tankers (5-9,999 dwt)
ships 02 SH 432
Phase out year
6Phase out SH tankers (10-19,999 dwt)
ships 542 SH 186 order 149
Phase out year
Phase out overhandg - 2004 44
7Phase out SH tankers (20-29,999 dwt)
ships 253 SH 142 Orders 18
Phase out overhang - 2004 23
Phase out year
8Phase out SH tankers (30-44,999 dwt)
Ships 637 SH 216 Orders 121
Phase out overhang - 2004 13 36 category 1
tankers built 1978-82 33 DB/DS phased out
2010-2015
Phase out year
9Phase out SH tankers (45,000 59,999 dwt)
Ships 425 SH 75 Orders 229
Phase out year
Phase out overhang - 2004 2 14 category 1
tankers built 1978-82
10Phase out SH tankers (60,000 79,999 dwt)
Ships 264 SH 98 Orders 129
Phase out year
11 category 1 tankers built 1978-82
11Phase out SH tankers (10,000 79,999 dwt)
Ships 75 m dwt SH 28 m dwt Orders 28 m
dwt
Phase out year
63 (976 tankers 17.6 m dwt) phase out below
30,000 dwt 32 (401 tankers 8.9 m dwt) orders
below 30,000 dwt 4-10 m due for phase out 2010
12Tanker fleet development
m dwt
13Implementation policies of special provisions
14Phase out
- special provisions
- 13 G (5) - double bottom/sides - CAS requirement
- 13 G (7) - SH trading beyond 2010/25 years
- 13 G (8) (b) entry into ports or offshore
terminals (provisions (5), (7) - 13 H (5) - double bottom/sides - trading beyond
2010/25 years - 13 H (6) (a) - crude oil having a density at 15ºC
higher than 900 kg/m3 but lower than 945 kg/m3 - 13H (6) (b) - 600 tons dwt and above but less
than 5,000 tons dwt - SH until 25 years - 13 H (7) - exclusively within an area under its
jurisdiction, - 13 H (8) (b) entry into ports or offshore
terminals (provisions (5), (6)
15Implementation policies
Source WWW.INTERTANKO.com
16Annex II revision
17MARPOL Annex II Revisions
- After 1 January 2007 products defined as
"floaters" and "persistent floaters", which
include the vegetable oils, will be assigned to
Category Y. Vegoils will have to be carried in
IMO Type 2 or 3 space. Oil-like substances will
not exist (xylene will require chemical code
certificate). All ships loading IBC Cargoes will
need to hold a Certificate of Fitness (CoF)
issued under the revised requirements.
18MARPOL Annex II Revisions
- The vegetable oils listed in Chapter 17 of the
IBC Code will be regulated as Pollution Category
Y and ship Type 2, and contain a limit on free
fatty acid content. The IMO agreed that the
individually identified vegetable oils should in
principle be carried in Ship Type 2. However, via
regulation 4.1.3 of the revised MARPOL Annex II,
an administration might allow the carriage of
these substances in a ship Type 3 ONLY if the
ship complies with all requirements for a ship
Type 3, as identified in the IBC Code, except for
cargo tank location. The cargo tank location
shall be in accordance with regulation 4.1.3.2 of
the revised MARPOL Annex II but these ships must
be constructed with double sides meeting the
requirements for IMO ship Type 2 vessels and
double bottom requirements of B/15 or 2 metres
(whichever is the lesser) and the CoF shall
indicate the exemption granted.
19Tanker fleet by hull
by m dwt
20Conclusion
21Conclusion
- Phase on schedule with no major problems
- 2010 situation unclear
- OPA re-schedule different
- Annex II revision will affect single hull product
tankers