Title: Seacoast Utility Authority Water Use Permit
1Seacoast Utility AuthorityWater Use Permit
Steven Memberg, Section LeaderWater Use
Regulation Division, Water Supply
DepartmentJanuary 26, 2009
2Seacoast Utility Authority
Loxahatchee River
Seacoast Utility Service Area
3Seacoast Utility Authority
- Utility Service Area includes Palm Beach
Gardens - North Palm Beach
- Juno Beach
- Lake Park Unincorporated areas of
PBC
Hood Road Wellfield
PBG Wellfield
NPB Wellfield
Burma Road Wellfield
4Seacoast Utility Authority
- Originally permitted in 1976
- Current Allocation
- Population 101,664 (2005)
- Per Capita 190
- Annual 19.31 MGD
- Proposed Allocation
- Population 102,423 (2012)
- Per Capita 190
- Annual 19.46 MGD
5Consumptive Use Permit Rule Protections for the
Loxahatchee
- Minimum Flows and Levels (MFL) covers
- Northwest Fork of the Loxahatchee River
- (G-92 to River Mile 6)
6Consumptive Use Permit Rule Protections for the
Loxahatchee
- Minimum Flows and Levels (MFL) covers
- Northwest Fork of the Loxahatchee River
- (G-92 to River Mile 6)
- Including tributaries
- Kitching Creek
- Hobe Grove Ditch
- Cypress Creek
7Consumptive Use Permit Rule Protections for the
Loxahatchee
- Minimum Flows and Levels (MFL)
- MFL violation occurs when an exceedance occurs
more than once in a six year period. - Flows over Lainhart Dam decline below 35 cfs for
more than 20 consecutive days. - Average daily salinity concentration on a
20-day rolling average exceeds two parts per
thousand at river mile 9.2 - Northwest Fork is not currently meeting the MFL,
therefore rule requires implementation of a
recovery strategy
8Consumptive Use Permit Rule Protections for the
Loxahatchee
- Recovery Strategy
- One component of recovery strategy is the
implementation of the Regional Water Availability
Rule
requested allocation will not cause a net
increase in the volume or cause a change in the
timing on a monthly basis of surface and ground
water withdrawn from the North Palm Beach County
/ Loxahatchee River Watershed Waterbodies over
that resulting from the base case
9Seacoast Utility Authority
Loxahatchee River
Seacoast Utility Service Area
Loxahatchee River Watershed Waterbodies
10Seacoast Utility Authority
- Regional Water Availability
- Calibrated groundwater flow model
- Annual requested withdrawal of 8,084 MG modeled
to accommodate two operating plans - Prime Scenario Hood Road Wellfield
- Alternate 1 Palm Beach Gardens Wellfield
- Transient model using a 27-month scenario
simulating 1-in-10 drought conditions
11Seacoast Utility Authority
12Staff Evaluation
- Regional Water Availability
- No net increase in the volume or change in timing
on a monthly basis of surface and ground water
withdrawn from the Waterbodies - Minimum Flows and Levels (MFL)
- No direct or indirect withdrawal from MFL body
- No contribution to existing MFL violations
- Other environmental considerations
- Drawdown impacts and mitigation for wetlands in
the wellfields cone of influence are still under
evaluation.