Update on - PowerPoint PPT Presentation

1 / 4
About This Presentation
Title:

Update on

Description:

September 15, 2000. STT meeting. Yi Dai, Sept 15, 2000. Beam Spot ... For later-on beam history study. Planned Procedures: STT meeting. Yi Dai, Sept 15, 2000 ... – PowerPoint PPT presentation

Number of Views:13
Avg rating:3.0/5.0
Slides: 5
Provided by: harry174
Category:
Tags: update

less

Transcript and Presenter's Notes

Title: Update on


1
  • Update on
  • Beam Spot Monitoring Feedback
  • Yi Dai
  • STT Meeting
  • September 15, 2000

2
Beam Spot Monitoring and Feedback

Basic Idea
  • To achieve the best beam position stability
  • Beam spot size
  • 30microns
  • Primary vertex reconstruction resolution
  • a few 10microns
  • Correction dipole accuracy
  • 10microns
  • To minimize the complexity
  • Database storage
  • To avoid frequent redundant entries
  • Communication and control traffic
  • Fastest ACNET communication lt 1Hz
  • To have a responsive system
  • Efficient primary vertex reconstruction
  • Once every a few minutes(?)
  • Correction dipole reaction time
  • Better than one step every a few minutes(?)

3
Beam Spot Monitoring and Feedback

Planned Procedures
  • Beam Position Calibration
  • To provide the static parameters
  • Done for each store of beam
  • Stored in the online database
  • Beam Parameter Downloading
  • At the beginning of each run
  • To be used as L2STT triggering parameters
  • Beam Position Monitoring and Feedback
  • Continuous beam position monitoring - EXAMINE
  • For daily shifters
  • For accelerator control people
  • Feedback triggered when deviations exceed
    thresholds
  • To ACNET dipoles for correction
  • New beam parameters will be entered into database
    after feedback correction
  • To Updated beam parameters
  • For later-on beam history study

4
Beam Spot Monitoring and Feedback

Expected Performance
  • Beam Position Control Stability
  • Overall beam stability
  • 100 microns (in positions)
  • Feedback control accuracy
  • 10 microns
  • Responsiveness
  • A few minutes for each feedback correction
  • Mainly limited by EXAMINE and ACNET front-end
    (correction dipoles) reaction time
Write a Comment
User Comments (0)
About PowerShow.com