RISHABH SOFTWARE PRIVATE LIMITED

Description:

Mechanical Drawings. Plant layout drawings. Piping isometric drawing. Structure drawing. Equipment layout drawing. As built documentation / 3D modelling ... – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0
Slides: 19
Provided by: Prag4
Category:

less

Transcript and Presenter's Notes

Title: RISHABH SOFTWARE PRIVATE LIMITED


1
WELCOME TO
RISHABH SOFTWARE PRIVATE LIMITED
2
WORKING DOMAIN
RISHABH SOFTWARE PRIVATE LIMITED
RISHABH ENGINEERING SERVICES
BPO
IT
INDUSTRIES WE CATER TO
ENGINEERING SERVICES
Chemical Pharmaceutical
Oil Gas
Petro Chemicals
Power
3
DRAFTING SERVICES
  • 3D modelling 2D drafting services with software
    like
  • (PDS / CADWORX / MICROSTATION /
    AUTOCAD)
  • 3D modeling
  • Complete plant model
  • Piping modeling
  • Equipment modeling
  • Civil structure modeling
  • Electrical Raceway modeling
  • 2D drafting
  • Mechanical Drawings
  • Plant layout drawings
  • Piping isometric drawing
  • Structure drawing
  • Equipment layout drawing
  • As built documentation / 3D modelling
  • Clash detection / Interference check
  • On site Deputation
  • Automated Deliverables

4
DETAILED ENGINEERING SERVICES
  • Pre-bid estimation / Proposal engineering
  • Plant layout
  • Piping layout
  • Piping routing
  • Plant Revamping/Expansion
  • Based on PMS, Plant Layout PID like
  • Equipment Layout
  • Pipe rack Modelling
  • 3D Model of Plant
  • GA Drawings
  • MTO / BOM
  • ISO Drawing
  • Civil Drawings
  • Mechanical Drawings
  • Structural Drawings
  • Rack modelling / drawings
  • Pipe support modelling / drawings
  • Pipe support modelling / drawings

5
Our Valued Clients
OFS
GAMMON COOLING TOWERS LTD.
6
CASE STUDIES
  • M/s. Oil Field Supplies FZCO, Dubai
  • OFS is a Dubai (UAE) based upcoming EPC
    Contractor. They offer international grade
    design, engineering construction services to
    all kind of power plants. They have also been
    engaged in various upcoming projects.
  • M/s. Doosan Engineering Services India Pvt.
    Ltd.
  • Doosan Engineering Services India Pvt.
    Ltd. is a wholly owned subsidiary of Doosan Heavy
    Industries Construction, South Korea, offers
    international-grade design, engineering
    construction services to all kind of power plants
    over the past 20 years.
  • M/s. Gammon Cooling Towers Ltd.
  • GCTL is an EPCC company, offers
    Customized Cooling Systems based on specific
    application of clients. With the in-house team of
    experienced multi-disciplines professionals, GCTL
    provides an optimized and cost-effective solution
    for design, engineering, manufacturing and
    construction for all aspects of Cooling Towers
    and Cooling Systems.
  • M/s. Vijay Tanks Vessels Ltd.
  • VTV is a major player in the turnkey
    design an EPCC for atmospheric storage tanks,
    cryogenic storage tanks, high pressure spheres,
    mounded storage vessels, shop pressure vessels,
    heat exchangers, process columns, pipelines and
    process.
  • M/s. Spectra Dynamics Ltd.
  • Spectra Dynamics Ltd. is an EPC company,
    serving the chemical process and supplying
    turnkey effluent treatment and water treatment
    plants. It also offers high quality reliable
    process design engineering consultancy.

7
M/s. Oil Field Supplies FZCO, Dubai
  • Scope of Work
  • Equipment modeling of Diesel Engine, Generator,
    Radiator, Air Intake, Thermal Boiler, Exhaust
    Stack, Storage Tanks, Various Skids, Starting Air
    Compressor Etc.
  • Complete Structure modeling of Engine, Radiator,
    Pipe Rack, Pipe Trench, Unloading Station, and
    Loading Bay etc.
  • Design Modeling of complete piping arrangement
    including small-bore lines, Skids piping etc.
  • Marking modeling of all physical supports
  • Extraction of Stress Isometrics, System
    Isometrics Fabrication Isometric drawings
  • Preparation of complete MTO in EXCEL format
  • Preparation of GA drawings
  • DRV sessions for client review
  • Approach Achievements
  • The project was planned to complete within 3
    months it was completed just in time.
  • A team of 5 members (including 1 team leaders)
    successfully carried out this project.
  • All the project work was carried out on CADWORX,
    AutoCAD MS-Excel (MS Office).
  • Our accuracy level was very high our work was
    highly appreciated by the main PMC Company.

BACK TO CASE STUDY
8
(No Transcript)
9
BACK TO CASE STUDY
10
M/s. Doosan Engineering Services India Pvt. Ltd.
Scope of Work a. Detailed Engineering of 3
no. of HRSG for Barka II Power Desalination
Plant (Oman) b. Detail Engineering of 1 no. of
HRSG for Daharki Combined cycle Power Plant
(Pakistan)
  • Equipment modeling of PPA, HRSG, HP LP Drums,
    Silencers, Main Stack, Bypass Stack Blow down
    Tank, pumps
  • Complete Structure modeling of HRSG, Inlet Duct,
    Main Stack platforms, Bypass Stack platforms
    stairs ladders, platforms ladders
  • Design Modeling of complete piping arrangement
    including small bore lines
  • Marking modeling of all physical supports
  • Extraction of Stress Isometrics, System
    Isometrics Fabrication Isometric drawings
  • Preparation of complete MTO in EXCEL format
  • Preparation of GA drawings
  • SPR sessions for client review
  • Approach Achievements
  • The project was planned to be completed within 8
    months it was completed in time.
  • A team of 5 members (including 1 team leaders)
    successfully carried out this project.
  • All the project work was carried out on PDS,
    Microstation, AutoCAD MS-Excel (MS Office)
  • Our accuracy level was very high. Our work was
    highly appreciated by the Head of the Piping
    Department of Doosan E S Pvt. Ltd.

BACK TO CASE STUDY
11
BACK TO CASE STUDY
12
Project 3D Modeling of Cooling
Tower System on PDS for Residue upgradation
MS/HSD quality improvement for
IOCL - Gujarat Refinery Dumad sites
(PMC is a Japanese
EPC company)
M/s. Gammon Cooling Towers Ltd.
  • Scope of Work
  • Set up of the complete project, its
    administration customization of specs
  • Modeling of Equipments, Cooling Towers, Piping,
    Pipe Rack, Structures, Electrical cable-trays,
    Fire fighting, Instrumentation Supports
  • Extraction of Isometric drawings
  • Extraction of MTO
  • Preparation of GA drawings
  • Preparation of Clash check reports
  • SPR sessions for client review
  • Approach Achievements
  • The project is to complete within 4 months it
    is on-going.
  • A team of 3 members (including 1 team leaders)
    are successfully carrying out the project
  • work.
  • All the project work is carried out using PDS,
    Microstation MS Office.

BACK TO CASE STUDY
13
BACK TO CASE STUDY
14
Project 3D Modeling of LPG
Storage System (Including Loading Unloading) on
PDS for
Residue upgradation MS/HSD
quality improvement for IOCL Gujarat Refinery
Dumad sites (Consultant is a
Japanese EPC company)
M/s. Vijay Tanks Vessels Ltd.
  • Scope of Work
  • Set up of the complete project, its
    administration customization of specs
  • Modeling of Equipments, Piping, Pipe Rack,
    Structures, Electrical cable trays, Fire
    fighting, Instrumentation Supports
  • Extraction of Isometric drawings
  • Extraction of MTO
  • Preparation of GA drawings
  • Preparation of Clash check reports
  • SPR sessions for client review
  • Approach Achievements
  • The project is to be completed within 4 months
    it is on-going.
  • A team of 3 members (including 1 team leader) are
    successfully carrying out the project work.
  • All the project work is carried out using PDS,
    Microstation MS Office

BACK TO CASE STUDY
15
(No Transcript)
16
BACK TO CASE STUDY
BACK TO CASE STUDY
17
Project Detailed Engineering
for Facilities for Moisture Control De-hazing
of gas oil in MAB refinery (for
KNPC, Kuwait)12
M/s. Spectra Dynamics Ltd.
  • Scope of Work
  • Set up of the complete project, its
    administration customization of specs
  • Modeling of Equipments, Piping, Pipe rack,
    Structures Electrical cable trays
  • Marking of supports
  • Extraction of Isometric drawings
  • Preparation of MTO
  • Preparation of GA drawings
  • SPR sessions for client review
  • Approach Achievements
  • The project was to be completed within 6 months
    it was completed in time.
  • A team of 3 members (including 1 team leaders)
    successfully carried out the project work.
  • All the project work was carried out using PDS,
    Microstation MS Office.