Develop standard subcontract terms. Require timely change order responses ... Standard Subcontract Terms. Coordinate work and resolve sub disputes ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 12
Provided by: Sal557
Category:
Tags: cparb

less

Transcript and Presenter's Notes

Title: CPARB


1
CPARB
  • Specialty Subcontractors
  • Ed Kommers, P.E.
  • Former President of University Mechanical
    Contractors, Inc.
  • Director of Technical Services for the Mechanical
    Contractors Association of Western Washington

2
Specialty Contractors Summary
  • Many subcontractors will not support the renewal
    of APW (GCCM) unless changes are made
  • The project delivery system may not be maximizing
    the effectiveness of the project budget for
    taxpayers on many projects

3
Comments on GC/CM
  • Waste or doubling up on services like cleanup,
    dumpsters and porta potties.
  • Bid package subs work against each other rather
    than with each other under a strong leader
  • Prefer not to bid GC/CM or will add higher margin
  • Risk shifting down to subs

4
Previous support of GC/CM
  • Minimized bid shopping because bids were
    delivered sealed and publicly opened
  • Subcontractors had to obtain a bid bond providing
    a built-in eligibility and responsibility
  • Oversight committee

5
JLARC Report
  • Subcontractors who perform much of the work on
    GC/CM projects comments were somewhat
    marginalized in the report (App 4)
  • GC/CM projects demonstrate characteristics that
    are a success except for the following that are
    inconclusive
  • Risk (shared risk)
  • Project Cost (impact on CO, claims litigation)
  • Quality (whether GCCM produces better quality)

6
Mission of CPARB
  • Evaluation of public capital projects
    construction processes
  • Impact of contracting methods on project
    outcomes
  • Advise on policies related to alternative
    public works delivery methods

7
Specialty Subs Priorities
  • Develop standard subcontract terms
  • Require timely change order responses
  • Prohibit incentives paid out of MACC contingency
  • Revise Eligibility

8
Standard Subcontract Terms
  • Coordinate work and resolve sub disputes
  • Allow recovery of costs due to delay
  • Realistic overhead and profit on COs
  • Require realistic lien waivers
  • Standardize scopes
  • Improve DRB process

9
How to standardize terms
  • Agree on New Prime Contract Terms and Conditions
  • Require subcontracts to be no more restrictive on
    specific clauses
  • Develop standard subcontract terms and conditions
  • Edit existing model contracts

10
General Public Works
  • Retainage needs lots of work
  • Responsibility criteria
  • Provide logical relief from Johnson decision
  • Restrict right to reject all bids to good cause

11
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com