Title: New Horizons Preliminary Design Review
1New Horizons Preliminary Design Review
Science Operations Center
Leslie A. Young Payload Science
Coordinator 303-546-6057 layoung_at_boulder.swri.edu
2Presentation Outline
- Overview
- Requirements
- Function and design
- Planned documentation
- Risk identification and mitigation
3Science Operations Center Overview
Level 1bData
Science OperationsCenter (TSOC, CSOC)
TLMData
4Science Operations Center Element Locations
- Boulder TSOC
- Tombaugh Science Operations Center
- Main Science Operations Center during cruise,
planning, and post-encounter - APL CSOC
- Christy Science Operations Center
- For use during initial checkout, during
encounters, and other critical operations
CICLOPS imaging lab (Boulder SwRI), similar to
planned TSOC
CONTOUR GC station (APL), similar to planned CSOC
5Science Operations Center Requirements Flowdown
New HorizonsData Management Plan7399-9TBD
New HorizonsConcept Study Report
New Horizons Mission Science Requirements7399-90
00
New HorizonsScience Operations
CenterRequirements Document05310.01.01-SOC-RD-01
New HorizonsScience Operations CenterDesigners
Notebook
6Science Operations Center Top Level Requirements
7Tombaugh Science Operations CenterDerived
Requirements and Verification Matrix
8Christy Science Operations CenterDerived
Requirements and Verification Matrix
9Tombaugh Science Operations Center Primary
functions
- Pre-launch operations
- Support Integration and Test
- Verify SOC operations
- Supply request files to MOC for mission
simulations - Instrument flight operations planning
- Supply merged deconflicted request files to MOC
for instrument operations - Pipeline data processing
- Receive telemetry from MOC, produce uncalibrated
images, spectra, and timeseries (level 1b data) - Archiving
- Source of telemetry for Science Team
- Source of level 1b data for Science Team, EPO,
PDS
10Tombaugh Science Operations CenterDesign Overview
11Christy Science Operations Center Primary
functions
- Real-time operations
- Support Integration and Test
- Data analysis during initial checkout,
encounters, and other critical operations - Monitoring
- Contingency
12Christy Science Operations Center Design Overview
13Science Operations Center Design Details
- Operations Planning (TSOC)
- Sun Blade 2000 (MOC compatible)
- SEQGEN, SEQADAPT programs for planning
- Data Analysis (TSOC, CSOC)
- PC/Linux dual boot machines
- Open-source tools preferred for data analysis
- Produce level 1b data uncalibrated images,
spectra, and timeseries, together with ancillary
data (quality flags, timing) - Distribution and Archive (TSOC)
- PC/Linux dual boot machines
- Level 1b FITS images, cubes, or tables with
automatically-generated detached PDS headers
archived to PDS small-bodies node
14Science Operations Center Planned Documentation
- SOC requirements document
- Draft by PDR
- Approved before CDR
- SOC designers notebook
- Draft by PDR
- Final before CDR
- SOC users guide
- Draft during Phase C implementation
- Sections added and updated as needed.
- New Horizons Data Management Plan
- Approved by Launch 1 year
- PDS Software Interface Specification
- Approved by Launch 1 year
15Science Operations Center Risk Identification
and Mitigation
- Primary risk
- Long-term maintainability
- Mitigation
- Obtain long-term hardware and software
maintenance contracts - Plan migration of data storage media types
- Document pipeline processing algorithms
- Preserve pedigree of all archived files
- Avoid proprietary data formats
- Formal internal reviews of users manuals, logs,
and other documentation