Title: MBS Review
1451-102 Introduction to Surveying (B.P.D.)
- Setting Out Buildings
- Introduction
- Project Requirements
- Set out Plan
- Survey Control
- Survey Methods
- Survey Equipment
2451-102 Introduction to Surveying (B.P.D.)
- Project Requirements
- Residential House
- Boundary marks
- Survey Marks
- Builders Set out
- Builders Methods
3451-102 Introduction to Surveying (B.P.D.)
4451-102 Introduction to Surveying (B.P.D.)
- Project Requirements
- Nursing Home
- Survey Marking
- Reference Lines
- Builders Set out
- Surveyors Set out
- Survey Methods
5451-102 Introduction to Surveying (B.P.D.)
6451-102 Introduction to Surveying (B.P.D.)
- Project Requirements
- High Rise Building
- Site Boundary
- Survey Control
- Survey Monitoring
- Survey Set Out
7451-102 Introduction to Surveying (B.P.D.)
8451-102 Introduction to Surveying (B.P.D.)
- Survey Equipment
- Horizontal Control
- Coordinate System
- Marking Survey Control
- Total Stations, Theodolites
- Plummets, Lasers
- Stainless steel bands
9451-102 Introduction to Surveying (B.P.D.)
Horizontal Control
Total Station 1990s
Theodolite 1950s
Theodolite 1980s
10451-102 Introduction to Surveying (B.P.D.)
Horizontal Control
Slab Penetration
Laser Plummet Level
Transfer of Control through slab penetrations
11451-102 Introduction to Surveying (B.P.D.)
Horizontal Control
Transfer of Control through slab penetrations
Survey Gear
12451-102 Introduction to Surveying (B.P.D.)
Vertical Control
Transfer of Vertical Control through slab
penetrations
Precise level and Invar staff
Precise level 1970s
13451-102 Introduction to Surveying (B.P.D.)
Vertical Control
Automatic Level
Automatic Level Staff
14451-102 Introduction to Surveying (B.P.D.)
Monitoring Surveys
Digital Automatic Level Invar Barcode Staff
15451-102 Introduction to Surveying (B.P.D.)
- Setting Out Buildings
- Melbourne Exhibition Centre
16451-102 Introduction to Surveying (B.P.D.)
- Setting Out Buildings
- Crown Casino