WP3 Job management and control - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

WP3 Job management and control

Description:

Task 3.1 Detailed analysis of existing tools and technologies ... Seismology CMT (CNRS): simple application family, test cases are focused on ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 8
Provided by: dalb155
Category:

less

Transcript and Presenter's Notes

Title: WP3 Job management and control


1
WP3 Job management and control
  • Viet Tran
  • Institute of Informatics
  • Slovakia

2
Content
  • Task 3.1 Detailed analysis of existing tools and
    technologies
  • Task 3.2 Identification of missing technologies
    and tools
  • Task 3.3 Specification of improvements of
    existing tools and technologies
  • Task 3.4 Preparation of test suite

3
Task 3.1 Existing technologies
  • Overview of existing Grid technologies
  • Analyzed middleware
  • Globus Toolkit 4 (GC RAS)
  • Unicore (SCAI)
  • LCG, gLite (II-SAS)
  • Analyzed tools
  • Workflow management tools (II-SAS)
  • Distributed management tools (CNRS)
  • Monitoring tools (CNRS)

4
Task 3.1 Existing technologies
  • Results were reported in D3.1 (PM9)
  • Some tools and middleware are still missing in
    the report (especially after Workshop in
    Bratislava)
  • ARC, ASKALON, JMS, .
  • Need to update in the final Deliverable 3.3
    Updated state of the art and gap analysis on
    application management and control technologies
    (PM 21)

5
Task 3.2 Missing technologies
  • Ongoing work (PM4-PM18)
  • Missing technologies
  • Job execution (II-SAS) Near-realtime,
    reliability
  • Workflow (II-SAS) automatic workflow
    composition, dynamic workflow
  • Monitoring (II-SAS) expected job start/end time,
    notification, progress
  • MPI support (SCAI) different versions of MPI
  • Licensing management and scheduling
  • Co-scheduling of data (SCAI)
  • First draft of report is on portal

6
Task 3.3 Specification of improvements
  • Just starting now
  • Based on the missing technologies and the
    requirements of ES applications

7
Task 3.4 Test suits
  • Ongoing task
  • Two test suits have been proposed
  • Seismology CMT (CNRS) simple application family,
    test cases are focused on distributed job
    management
  • Flood forecasting FFCS (II-SAS) complex workflow
    application, test cases are focused on workflow
  • Report are uploaded on portal
Write a Comment
User Comments (0)
About PowerShow.com