HECTOR MCKENZIE - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

HECTOR MCKENZIE

Description:

2001 First low floor tram introduced by Yarra. 2002 DDA DSAPT passed (C'wlth) ... gap between tram and platform. Coordination of low floor tram introduction and ... – PowerPoint PPT presentation

Number of Views:69
Avg rating:3.0/5.0
Slides: 13
Provided by: kay59
Category:
Tags: hector | mckenzie | tram

less

Transcript and Presenter's Notes

Title: HECTOR MCKENZIE


1
HECTOR MCKENZIE Deputy Director Public Transport
Franchise Relationships
2
A Potted History
  • Steady progress has been made in improving
    accessible public transport in Victoria
  • 1985/6 First low floor accessible buses
    introduced by Grendas
  • 1998 DOI Action Plan
  • 2001 First low floor tram introduced by Yarra
  • 2002 DDA DSAPT passed (Cwlth)
  • May 2006 Meeting Our Transport Challenges (MOTC)
    allocates 250m for infrastructure plus announces
    funding for low floor trams.
  • September 2006 State Action Plan 2006 2012
    released

3
The Starting Point
  • Identify progress towards the milestones,
  • broadly
  • 25 by 2007
  • 55 by 2012
  • 90 by 2017
  • Full by 2022 except
  • trains and trams 2032
  • Some Parts 100 by
  • 2007 and 2012
  • Gaps to meet milestones (red, orange) identified
    as basis to funding programs shown on next slide.

4
The starting point
5
Action Plan 2006 2012
  • The State Action Plan 2006 released in September
    2006.
  • 48 actions to meet 2007 and 2012 milestones for
    infrastructure
  • ?System-wide initiatives Metlink Signage,
    Information, Ticketing
  • ?Melbourne trains
  • ?Melbourne trams
  • ?Melbourne and regional buses
  • ?V/Line Passenger
  • ?Taxis

6
Trains Stations
  • Metro Trains
  • Almost 100 accessible
  • Regional Trains
  • 89 compliance, 38 new V/Locities
  • Continued role for conductors providing direct
    assistance
  • Upgrading older carriages to remove need for
    people in larger wheelchairs to travel in
    conductors area
  • Access Paths
  • Flange Gap cannot be eliminated
  • New Standards developed for
  • pedestrian rail level crossings

7
Stations (contd)
  • Station Works
  • Widening platform ends
  • Ramps - generally involving low rises
  • Currently developing a lift strategy and
    standards
  • TGSIs (Over 50 stations treated over last four
    years)
  • Lighting - interiors, underground stations, new
    white light
  • Hearing augmentation hearing loops where
    technically feasible but visual information
    alternative preferred

8
Trams Boarding
  • Trams
  • Boarding remains Victorias most difficult issue
  • Currently 95 low floor trams (23)
  • Tram replacement program funded in MOTC
  • Interface with infrastructure critical

9
Trams Stops
  • Boarding
  • Platform stops preferred access better for
    everyone (but 250,000 to
  • 1m each)
  • Several different designs developed
  • Focus has shifted from tackling most difficult
    to also doing easier ones
  • Maximum likely platform numbers 30 to 40 of
    stops
  • Remaining Issues
  • Threshold gap between tram and platform
  • Coordination of low floor tram introduction and
    platform stop locations
  • Need for lifts in new low floor trams
  • Integration of lifts with road safety treatments

10
Metro Regional Buses
  • Buses
  • almost 50 compliance, over 90 buses replaced
    each year
  • Many new and extended services being provided
  • Bus Stops
  • 4 of 26,000 bus stops are compliant
  • major program underway TGSIs, access paths and
    surfaces (2012 issue) with local government
  • complex logistics with large numbers of stops,
    locations and parties involved
  • Programs to meet 2007 milestone in 2008 and
    progress towards 2012 milestone.
  • Coaches
  • 35 compliance on long haul coaches

11
Taxis
  • Key issues
  • Improved Response Times for Wheelchair accessible
    taxis
  • Raised identification numbers on taxis
  • Taxi industry and regulators are addressing both
    issues nationally
  • Continue Multi Purpose Taxi Program
  • (50 fare subsidy)

12
Next steps
  • Roll out Funded Programs to Meet Milestones to
    2012
  • New Ticketing System
  • Myki Smart card system
  • Many options to purchase a ticket
  • System practices best fare outcomes
  • New ticketing system will set new benchmarks for
    compliance
  • Five Year Review of Standards (Cwlth) -
    submissions due 24 August
  • 2007
  • Develop Scope and funding for 2012 2022 and
    2032 requirements
Write a Comment
User Comments (0)
About PowerShow.com