Scheduler ProfileBased Intelligent Production Systems - PowerPoint PPT Presentation

1 / 79
About This Presentation
Title:

Scheduler ProfileBased Intelligent Production Systems

Description:

love. Sensing: seeing. hearing. touching, etc. Intuiting: hunch. Eight ... Extraversion: tough mindedness, impulsiveness, tendency to be outgoing, desire ... – PowerPoint PPT presentation

Number of Views:60
Avg rating:3.0/5.0
Slides: 80
Provided by: Sat4151
Category:

less

Transcript and Presenter's Notes

Title: Scheduler ProfileBased Intelligent Production Systems


1
Scheduler Profile-Based Intelligent Production
Systems
  • Gürsel A. Süer
  • IMSE, Ohio University, USA
  • 7th International Workshop on Human Factors in
    Planning, Scheduling and Control in Manufacturing
  • June 13-15, 2005, Groningen, Netherlands

2
Presentation Outline
  • Manufacturing Systems
  • Intelligent Production Systems
  • Human Involvement
  • Human Personalities
  • Proposed Considerations
  • Other Components

3
PART I. Manufacturing SystemsMajor Activities
4
PART I. Manufacturing Systems Suppliers,
Manufacturer, Customers
Materials Finished Products
Purchasing Production Planning Demand
and Control
Management Human Issues Human
Issues Human Issues
5
PART I. Manufacturing Systems Various Planning
Functions

6
PART I. Manufacturing Systems Characteristics of
Manufacturing Systems-I
Planning Horizon (t) Response Time
long
short
7
PART I. Manufacturing Systems Characteristics of
Manufacturing Systems-II
Precision
low
high
8
PART II. Intelligent Production
SystemsDefinitions
  • Intelligent System
  • Software than can make decisions to solve
    problems
  • Intelligent Production Systems
  • Software that contains the expertise required to
    make decisions and the tools needed to solve
    production-related problems
  • In this presentation, the emphasis is on the
    production planning and control aspects

9
PART II. Intelligent Production Systems KB
Systems -Traditional Approach
10
PART II. Intelligent Production Systems What is
Expertise?
  • Combination of
  • Formal Knowledge
  • Domain-independent knowledge
  • Learning from schools and books
  • Deep knowledge
  • Experience
  • Domain-dependent knowledge
  • Learning from mentors and experiences
  • Surface knowledge

11
PART II. Intelligent Production Systems Sample
Applications-I
  • single machine scheduling advisor
  • Experts Gürsel A. Süer and Cihan Dagli
  • Developers Gürsel A. Süer and Cihan Dagli
  • Users Whoever has the need for such a
  • consultation

12
PART II. Intelligent Production Systems Sample
Applications-II
  • Knowledge-Based Master Scheduling
  • Expert Current Master Scheduler at
  • AVON
  • Developers Gürsel A. Süer
  • User Current/Future Master Schedulers
  • at AVON

13
PART II. Intelligent Production SystemsReplacing
Experts
  • Knowledge-based systems can be developed
  • to make the expertise available to others
  • to speed up decision making process
  • Eventually, experts are replaced by
    Knowledge-Based Systems

14
PART II. Intelligent Production Systems
Advantages of KB Systems
  • 1. They are always available
  • 2. They always attend to details
  • 3. They are consistent
  • 4. Better KB systems can perform their
    specialized
  • tasks better than human specialists
  • 5. They ask questions and explain their reasoning
    if
  • asked and justify their questions
  • 6. They can function with incomplete and
    uncertain
  • data
  • 7. They do not display biased judgments

15
PART II. Intelligent Production Systems
Disadvantages of KB Systems
  • 1. They lack commonsense
  • 2. Their expertise is limited to a narrow field
  • 3. They do not learn
  • 4. They cannot reason from axioms or general
  • theories

16
PART II. Intelligent Production Systems Other
Approaches-I
  • Fuzzy Sets
  • Deals with Uncertainty
  • Membership Function
  • Neural Networks
  • Extremely simplified models of human brain
  • Different approach to information processing when
    an algorithmic procedure for solving a problem is
    not known
  • Learning

17
PART II. Intelligent Production Systems Other
Approaches-II
  • Tabu Search
  • Neighborhood search
  • Cycling back to previously visited solutions is
  • prevented by the use of memories called tabu
    lists
  • Efficient Technique
  • Simulated Annealing
  • Provides a means to escape local optima by
    allowing hill climbing moves
  • Modeled after thermodynamic behavior

18
PART II. Intelligent Production Systems Other
Approaches-III
  • Genetic Algorithms
  • Bio-inspired technique
  • Darwinian principle of natural selection
  • Proved to be effective especially in the global
    search
  • Memetic Algorithms
  • Similar to Genetic Algorithms
  • Exploits all available knowledge (heuristics,
    approximation algorithms, local search, local
    optimizers, etc.)
  • Ant Colonies
  • Behavior of real ants
  • Pheromone trail laying and following

19
PART II. Intelligent Production Systems Other
Approaches-IV
  • Particle Swarm Optimization
  • social behavior of organisms such as bird
    flocking and fish schooling
  • knowledge is optimized by social interaction
  • population-based search procedure
  • individuals change their position (state) with
    time
  • each individual adjusts its position according to
    its own experience, and according to the
    experience of a neighboring individual

20
PART II. Intelligent Production Systems Other
Approaches-V
  • Genetic Programming
  • Extension of genetic algorithms
  • Population consists of computer programs
  • Data Mining
  • Deals with analyze large databases to solve
    problems
  • automated extraction information from databases

21
PART II. Intelligent Production Systems Other
Approaches-VI
  • Scatter Search, Variable Neighborhood Search,
    Guided Local Search, Adaptive Search, Iterated
    Local Search, Constraint Satisfaction, etc.
  • Classical Optimization
  • Linear Programming
  • Integer Programming
  • Nonlinear Programming, etc.

22
PART II. Intelligent Production Systems From ..To
From Knowledge-Based Intelligent Systems
To Faster Systems Computation-Intensive
Systems More Efficient Search Techniques Learning
Systems Adaptive Systems Hybrid Techniques
23
PART III Human InvolvementIn a Typical Function
24
PART III Human Involvement In a Typical
Function -Details
25
PART III Human InvolvementDecision Making
Levels
Decisions
Solution Tech.
Decision Makers
Conscious
Opt.
Group
Eff. Search Fuzzy KB.
Unconscious
Single
26
PART III Human InvolvementIndividual vs. Group
DM
  • Individual Decision Making
  • Expertise (Knowledge and Experience)
  • Behavior
  • Group Decision Making
  • Expertise of Individuals (Knowledge and
    Experience)
  • Behavior of Individuals
  • Group Dynamics Among Individuals

27
Part IV Human Personalities Elements of
Behavior
  • Behavior depends on
  • person
  • environment
  • anticipated future events (look ahead)

28
Part IV Human Personalities Classification of
Personal Types-I
  • A. By Carl Gustav Jung
  • Two dimensions
  • 1. Attitudes (orientations)
  • Introversion subjective experience
  • Extraversion objective experience

29
Part IV Human Personalities Classification of
Personal Types-II
  • 2. Functions
  • Thinking intellectual function
  • connect ideas
  • understand nature of problem and then solve it
  • Feeling pleasure
  • anger
  • pain
  • love
  • Sensing seeing
  • hearing
  • touching, etc.
  • Intuiting hunch

30
Part IV Human Personalities Classification of
Personal Types-III
  • Eight psychological types
  • 1. Introversion thinking
  • Emotionless, distant, arrogant, inconsiderate,
  • stubborn, pursue their own thoughts
  • 2. Extraversion thinking
  • Impersonal, cold, repress feeling,
  • objective reality is their driving force

31
Part IV Human Personalities Classification of
Personal Types-IV
  • 3. Introversion feeling
  • Feel intense emotions, keep them hidden, usually
    they have inner harmony but may erupt suddenly
  • 4.Extraversion feeling
  • Feelings change, emotional, moody, but sociable,
  • intense but short-lived attachments
  • 5. Introversion sensation
  • Calm, self-controlled, boring,
  • deemphasis on thoughts and feelings
  • 6. Extraversion sensation
  • Realistic, practical, hardheaded, accept world
    as is without giving much thought, sensation from
    their own experience

32
Part IV Human Personalities Classification of
Personal Types-V
  • 7. Introversion Intuition
  • Dreamers, visionaries, impractical. They may not
    communicate but others can benefit
  • 8. Extraversion Intuition
  • New worlds to conquer, good at promoting
  • ideas, their interest is not sustained.

33
Part IV Human Personalities Classification of
Personal Types-VI
  • B. Raymond Bernard Cattell
  • Personality is a complex structure of various
    traits
  • Started out with 4500 definitions
  • Condensed the list to 200
  • Later reduced it to 35 surface traits

34
Part IV Human Personalities Classification of
Personal Types-VII
  • Classification of Traits
  • 1. Surface traits, can be captured from
    observable behavior
  • 2. Source traits, cannot be captured from
    observable behavior
  • They can be determined by performing Factors
    Analysis. Surface traits are intercorrelated and
    factored in order to identify the influences that
    underlie them

35
Part IV Human Personalities Classification of
Personal Types-VIII
  • Another Classification
  • Dynamic traits (setting goal)
  • Ability traits (effectiveness of reaching goal)
  • Temperament traits (the way the person moves
    towards goal)

36
Part IV Human Personalities Classification of
Personal Types-IX Cattells 16 Personality Factors
  • Outgoing Reserved
  • More intelligent Less Intelligent
  • Stable Emotional
  • Assertive Humble
  • Happy-go-lucky Sober
  • Conscientious Expedient
  • Bold Shy
  • Tender minded Tough minded
  • Suspicious Trusting
  • Imaginative Practical
  • Shrewd Forthright
  • Apprehensive Placid
  • Experimenting Traditional
  • Self-sufficient Group-Tied
  • Controlled Casual
  • Tense Relaxed

37
Part IV Human Personalities Classification of
Personal Types-X
  • C. Hans Jurgen Eysenck
  • Three measures of personality dimensions
  • 1. Introversion-Extraversion
  • Introversion tender minded, seriousness,
    inhibited, performance interfered with by
    excitement, preference for solitary tasks, etc.
  • Extraversion tough mindedness, impulsiveness,
    tendency to be outgoing, desire for novelty,
    performance enhanced by excitement, preference of
    tasks that require contact with other people,
    etc.

38
Part IV Human Personalities Classification of
Personal Types-XI
  • 2. Neuroticism
  • Below average emotional control, slowness in
  • thought and action, lack of persistence, lack of
  • sociability
  • 3. Psychoticism
  • Poor concentration, poor memory, insensitivity,
  • lack of caring for others, cruelty, disregard
    for danger, occasionally originality or creativity

39
Part IV Human Personalities Classification of
Personal Types-XII
40
PART V Proposed ConsiderationsHuman Profiles-I
  • There are various possibilities to incorporate
    human issues into intelligent production system
    development
  • A. Human Profiles
  • Typically, knowledge is extracted from an expert
    and KB system is built
  • The rules established may represent his
  • knowledge
  • experience
  • personality

41
PART V Proposed Considerations Human Profiles
-II
  • The user is indirectly influenced by the Experts
    personality as well
  • The idea is to keep
  • knowledge SAME
  • USE/IGNORE experience and
  • VARY personality traits/strategies
  • We need to define different Human Profiles and
    make them options during Consultation

42
PART V Proposed Considerations Human Profiles
-III
  • Example
  • A scheduler may be very optimistic in terms of
    availability of resources (i.e., no machine
    downtime, no material shortages, no worker
    absenteeism, no power failures, high efficiency,
    etc.)
  • Another may be cautious and uses averages based
    on the past data whereas another may be very
    pessimistic and allows larger buffers in the
    schedule).
  • You will get different schedules in each case.

43
PART V Proposed Considerations Human Profiles
-IV
  • Example
  • Another example may be processing and setup
    times. An optimistic scheduler uses standard
    times whereas a cautious scheduler may use
    slightly higher times and the pessimistic one may
    use high processing times.

44
PART V Proposed Considerations Human Profiles -V
  • Example
  • A scheduler may be in curious mode and ask more
    questions to get more accurate information to use
    in the planning process such as
    operator-operation times as opposed to only
    standard times.

45
PART V Proposed Considerations Human Profiles
-VI
  • Example
  • A scheduler may be in outgoing mode and gather
    information (formal/informal) about the
    availability of operators for a weekend overtime,
    in case needed, etc.

46
PART V Proposed Considerations Human Profiles
-VII
  • Example
  • A manager does not want to have more than 5 tardy
    jobs in that particular week. He runs the
    software in rigid mode and finds 7 tardy jobs
  • Output from the software
  • ? No such schedule exists
  • No further action is taken.

47
PART V Proposed Considerations Human Profiles
-VIII
  • Example
  • However, the response may be as follows if
    software is run in thinking mode in the above
    problem
  • Output from the software
  • ? No such schedule exists
  • ? However, if you allow overtime on Machine XX
    for 2 hours, you will reduce your number of
    tardy jobs to 5

48
PART V Proposed Considerations Human Profiles
-IX
  • Example
  • For the above example, even better approach would
    be to look into alternative actions and evaluate
    them in intelligent/analytical mode (overtime,
    subcontracting, alternative processes, additional
    machines, etc.)

49
PART V Proposed Considerations Human Profiles -X
  • Example
  • In the above example if the manager does not want
    to do overtime then it may be end of the
    consultation. However, if the user chooses
    persistence mode, software may generate other
    alternatives such as
  • modify ready time
  • ? if you bring in Material YY 2 days earlier,
    you can start processing W100 and W200 sooner and
    thus reduce number of tardy jobs to 5

50
PART V Proposed Considerations Human Profiles
-XI
  • Example
  • check if alternative materials are available
  • In the above example, if material cannot be
    brought in early, then check the possibility if
    alternative materials can be used and also check
    their availability

51
PART V Proposed Considerations Human Profiles
-XII
  • Example
  • If the DM chooses to use bold option, it may
    perform a capacity analysis first and warns you
    that
  • ? several tardy jobs are expected as capacity
    available is not sufficient, you will have to
    increase your capacity first!!

52
PART V Proposed Considerations Human Profiles
-XIII
  • Example
  • The software may run in aggressive and thinking
    mode where customers are classified,
    product-customer relations are established, then
    customers to be delivered are chosen.

53
PART V Proposed Considerations Human Profiles
-XIV
  • Example
  • The software may run in aggressive mode and
    suggest that you contact one of the customers and
    change due date or convince the customer for
    partial delivery to be able to reduce the number
    of tardy jobs to 5.

54
PART V Proposed Considerations Human Profiles
-XV
  • Example
  • The software may run in perfectionist mode and
    report that there is a schedule with 3 tardy jobs
    by running GA with higher population size and
    generations, BB, etc.
  • Example
  • The software may randomly choose overtime people
    in insensitive mode whereas it could skip elderly
    and women who has school-age children in a
    thoughtful mode.

55
PART V Proposed Considerations Human Profiles
-XVI
  • Example
  • The software may randomly choose overtime people
    in casual mode whereas it could only choose
    people with needed skills in controlled mode.
  • Software may ask how much time is available to
    solve the problem (or rescheduling) and then
    chooses the best technique to use within time
    restrictions in self-sufficient mode

56
PART V Proposed Considerations Human Profiles
-XVII
  • Example
  • The software may generate a schedule where
    several products may have to be run every day to
    use the capacity better. However, in practical
    mode, small lots can be grouped and overtime may
    be suggested one day in the week.

57
PART V Proposed Considerations Human Profiles
-XVIII
  • Example
  • In no-risk mode, jobs with materials already in
    warehouse and firm orders will be scheduled
    whereas, in risky mode, jobs with anticipated
    material arrival times and anticipated customer
    orders can also be scheduled.

58
PART V Proposed Considerations Human Profile
Simulator
  • B. Human Profile Simulator
  • A manager may simulate the system by using
    different human profiles and eventually may
    choose one of the schedules
  • He may sympathize with one of the profiles but my
    want to check others as well before he makes a
    final decision
  • Different profiles may be more suitable for
    different occasions, periods, production units,
    shifts, etc.

59
PART V Proposed Considerations Human Profile
Evaluator
  • C. Human Profile Evaluator
  • It is good idea to keep track of past performance
  • Correlation among past performance vs. chosen
    profiles should be determined
  • An effort should be made to estimate the
    performance of other profiles in the same
    situations
  • This information may be useful in deciding what
    profile to choose for the upcoming periods based
    on problem characteristics

60
PART V Proposed ConsiderationsPerformance
Measure Identifier-I
  • D. Performance Measure Identifier
  • Usually Decision Makers determine the performance
    measure to consider
  • However, in many cases they follow tradition,
    habits, etc. without looking into problem
    specifics
  • How would they know what measure is most relevant
    in this period without doing any extensive
    computation?

61
PART V Proposed Considerations Performance
Measure Identifier-II
  • Ideally, software should make several iterations
    and passes to identify the critical performances
    to focus on
  • We have made some efforts to solve a single
    machine scheduling problem by using Genetic
    Algorithms.
  • GA runs with small population size and low
    generations. We identify critical measure(s) and
    run GA full version to improve that particular
    measure(s)

62
PART V Proposed Considerations Uncertainty-I
  • E. Uncertainty
  • Fuzzy is a good technique to deal with
    uncertainties
  • Membership function contain subjective
    preferences
  • Human Profiles can be incorporated into
    membership functions

63
PART V Proposed Considerations Uncertainty-II
µ
µ
1
1
0
0
nT
nT
5
8
12
5
DM X DM Y More tolerant Less tolerant
64
PART V Proposed Considerations Uncertainty-II
µ
µ
1
1
0
0
nT
nT
3
8
12
3
DM X DM Y More demanding More
demanding more tolerant less tolerant
65
PART V Proposed Considerations Robust Solutions
  • F. Robust Solutions
  • Robust solutions can be provided based on
    stochastic parameters (processing times, setup
    times, machine availability, etc.)
  • performance measures
  • acceptable solutions with respect to multiple
    performance measures
  • combination of stochastic parameters and
    performance measures

66
PART V Proposed Considerations Multiple
Performance Measures-I
  • G. Multiple Performance Measures
  • Non dominated solutions
  • Weighted approaches
  • Lexicographical approach
  • Fuzzy Genetic Algorithms can be used to deal
    with these problems as well
  • GA fitness function includes what measures have
    been satisfied how well they have been
    satisfied
  • How well is measured through satisfaction levels

67
PART V Proposed Considerations Multiple
Performance Measures-II
Various fitness functions can be used for
GA-based fuzzy scheduling FF min (?i) FF max
(?i) FF ?i (?i) FF ?i (ai ?i)
68
PART V Proposed Considerations Multiple
Performance Measures-II
Qualitative and Quantitative Measures can be
combined by using fuzzy as well Qualitative
evaluation can be done in interactive mode with
Decision Maker or by using membership
functions
69
PART V Proposed Considerations Dynamic
Environment-I
  • H. Dynamic Environment
  • Alternative membership functions are defined for
    different situations
  • Situations may be environment-dependent and/or
    future dependent
  • A company is more sensitive to reducing tardy
    jobs in a highly competitive period than in a
    less competitive period

70
PART V Proposed Considerations Dynamic
Environment-II
  • A company is more willing to do overtime due to
    high demand than simply due to machine failure
  • A company is reluctant to invest in new equipment
    when demand is flat. However, when trend is
    increasing demand, they will be less reluctant
  • More suitable membership function is used in each
    instant
  • Similarly, fuzzy rules can be revised

71
I PART V Proposed ConsiderationsInteractiactive
Operating Mode
  • I. Interactive Operating Mode.
  • The software should be able to evaluate any
    plan/scheduled suggested by human Decision Maker
  • If the DM is satisfied with most of the schedule
    but asks a few changes, it should evaluate the
    impact of requested changes
  • If the DM is satisfied with most of the schedule
    but still interested in improvement, neighborhood
    search can be conducted
  • If the DM is satisfied with the schedule but now
    interested in a secondary performance measure,
    neighborhood search can be conducted

72
PART V Proposed Considerations Fuzzy Group
Decision Making-I
  • J. Fuzzy Group Decision Making
  • Individuals have their membership functions
  • Membership functions may be similar or
    conflicting
  • Individuals may have the same weight or varying
    weights
  • If sum of satisfaction gt Th, schedule is
    acceptable
  • GAs can be used to maximize the sum of
    satisfaction

73
PART V Proposed Considerations Fuzzy Group
Decision Making-II
If no schedule is found with satisfaction gt
Th discussions (simulation) start.
74
PART V Proposed Considerations Fuzzy Group
Decision Making-III
  • Membership functions are modified to reflect
    discussions. Some personality profiles/traits
    determine whose membership functions can be
    modified and by how much. This process is
    repeated a number of times to obtain a
    resolution.
  • No solution is a possibility as well
  • Such a tool can be used to determine the makeup
    of a group so that working relations can be
    established

75
PART V Proposed Considerations Fuzzy Group
Decision Making-IV
  • GAs can be used to solve these problem with
    Maxmin type of fitness function (Maximize the
    minimum satisfaction level)
  • OR
  • Maximize total satisfaction subject to an
    acceptable minimum satisfaction of each DM.
  • (Max sum FF s.to. SLigtMIN)

76
PART V Proposed Considerations Fuzzy Group
Decision Making-V
  • Another possibility is to have group discussion
    but single DM. Each person in the group is trying
    to influence the decision (membership function)
    of the Decision Maker.
  • This problem can also be extended to Multi-DM and
    Multi-PM as well.

77
PART VI Other Components
  • Distributed Systems
  • Everybody connected and all relevant information
    available to the user
  • Vision systems
  • Status Check
  • Evaluation of performance
  • Mood Predictor

78
PART VI Other Components-II
  • Natural Language Processing
  • Automatic Instructions
  • Computer vs. DM
  • Computer vs. Implementers
  • Automation
  • Highly automated environment, robotics

79
PART VI Other Components-III
  • Create Operator skill and preference database and
    use it during Task Allocation
  • Extend these concepts to Supplier Evaluation
  • Extend these concepts to Customer Evaluation