Scheduler Basics - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Scheduler Basics

Description:

... the board. EDI updates ePace Job Planning record. Info comes from published scheduler board (import) ... Status update ( ready/running/interrupted/complete) ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 15
Provided by: roberto7
Category:
Tags: basics | scheduler

less

Transcript and Presenter's Notes

Title: Scheduler Basics


1
Scheduler Basics
  • Fusion 08
  • John Berenguer

2
10,000 foot view
  • Integrated systems
  • ePace Browser based
  • Scheduler Windows based
  • Server application on Windows Server as service
  • Workstation client on Windows PC
  • Database is on ePace appliance

3
10,000 foot view
  • Moving parts
  • Estimate converted to Job
  • Creates Job Planning records
  • EDI moves ePace Job Plan info to scheduler inbox
    - export
  • Schedulable jobs
  • Designer plans schedule and adopts the board
  • EDI updates ePace Job Planning record
  • Info comes from published scheduler board
    (import)
  • Data Collection updates published scheduler board
  • Real time via TCP/IP packet

4
10,000 foot view
  • Requirements
  • Job Part must have
  • a status that is configured as schedulable
  • at least one Job Planning record whose activity
    code is configured as schedulable and has planned
    hours

5
ePace Procedures
  • Activity code Setup
  • Planning integration
  • Set to schedulable
  • Rollup
  • If needed to group functions on same piece of
    equipment
  • Ask if Complete
  • D/C interface automatically removes entry from
    board

6
ePace Procedures
  • Creating Job Planning recs
  • Manually entered
  • User keys in activity, hours, dates/times
  • Estimate Convert
  • Automatic if system is configured to do so
  • Job Type
  • A template to automatically create Job Plan
    records
  • Can be sophisticated - use of xpath expressions
  • Duplicate Job Part
  • ePace can be configured to duplicate Job Plan
    records

7
ePace Procedures
  • Scheduler EDI
  • Launch from menu - Production/JobPlanning/Run
    Scheduler EDI
  • View log details from admin console
    (Config/edi/Logs)
  • Data Collection
  • Status update ( ready/running/interrupted/complete
    )
  • View log details from admin console
    (Config/edi/Logs)

8
ePace Procedures
  • Data Collection
  • Status update ( ready/running/interrupted/complete
    )
  • View log details from admin console
    (Config/edi/Logs)

9
Scheduler Procedures
  • Tray vs Board
  • Tray is the inbox where you choose what goes on
    board
  • Board is where you see your availability/load
  • Design vs monitor
  • Design is your sandbox hypothetical
  • Monitor is the published active board - official
  • Resource vs activity code
  • Resource is something you are scheduling in
    Scheduler
  • Activity code is a process in ePace

10
Scheduler Procedures
  • Display options
  • Workstation specific
  • Background color/bar color/tags
  • Down Bars
  • Also called proforma your plant holiday/shift
    schedule
  • Scale
  • User defined, workstation specific
  • Short run shop use small scale, long run shops
    large scale

11
Scheduler Procedures
  • Moving jobs
  • drag/drop/fix left/reassign
  • Scheduling methodology
  • Forward scheduling
  • Backwards scheduling (just in time)
  • Pin row
  • Take control away from scheduler automation
  • Resource view
  • See all jobs for a selected resource

12
Scheduler Procedures
  • Job View
  • Displays job summary info
  • Displays job part info
  • Production list
  • Displays each scheduled activity in grid format
  • Summary at bottom of board
  • Displays key information for selected process

13
Reports
14
Questions and Answers
Write a Comment
User Comments (0)
About PowerShow.com