Title: Presentation by


1
Stochastic Modelling Approach for the Reduction
of Technical Engineering-based Risk
  • Presentation by
  • Gordon BarrDept. of Engineering Mathematics,
    University of Bristol
  • 30th January 2003

2
Research Background
  • Initially developed through the EPSRC STARTright
    project, in collaboration with Cambridge
    University
  • Brief To provide software-based methods for
    engineers to minimise risk in the design process
  • Companies were consulted from several sectors of
    the engineering industry and their project
    processes studied
  • Prototype software and methods primarily
    developed with ALSTOM, and to lesser extent,
    Metso-Svedala

3
The SMARTER Software Development
  • SMARTER endeavours to
  • Allow design information to be inputted which has
    an impact on key project deliverables
  • Enable engineers to highlight the major causes of
    uncertainty and risk in engineering projects
  • Permit the entire project team to participate in
    the management of project risk and uncertainty
  • Reuse relevant historical data in current project
    situations
  • Make possible the exploration of project
    alternatives and what-if analysis

4
Key Performance Indicators (KPIs)
  • KPIs are used to help make decisions
  • SMARTER enables
  • KPIs to be identified
  • Using Sensitivity Analysis
  • KPIs to be tackled
  • At the outset of engineering projects
  • Given limited amounts of historical information
  • Using the ability of experienced engineers
  • The consequence of failing to meet KPIs
  • e.g. How likely is it that the project will be
    over budget?
  • e.g. Which KPIs should we be most worried about?

5
About the Case Study Metso-Svedala
  • Mechanical Design Management Company
  • Specialise in designing coordinating the build
    of heavy mechanical plant.
  • Product designs include
  • Rail Car Dumper Systems
  • Stacker Systems for Loose Material
  • Reclaimer Systems for Loose Material
  • Ship Mounted Material Unloaders
  • Selected Case StudyTandem Random Car Dumper
    (Crescent)

6
Metso-Svedala - Single Unit Car Dumper
7
Metso-Svedala - Car Dumper In Operation
Crescent Dumper (0º)
Crescent Dumper (45º)
8
Metso-Svedala Car Dumper Pictures
9
Metso-Svedala Risk Issues
  • Each Metso-Svedala project typically contains a
    large amount of original, adaptive or variant
    design
  • Original designs cause problems!
  • Will the client change their requirements
    radically?
  • Will the components work together in a different
    configuration?
  • Suppliers and contractors are often new to the
    company
  • Performance issues
  • Problems adhering to standards (local practices,
    etc)

10
SMARTER Method Overview
  • Application split into two distinct sections
  • Wizard
  • Advanced
  • Reason Generally engineers do not fully
    understand / like to use probability theory!
  • The Wizard section
  • Removes the exposure of engineers to the
    underlying probability model.
  • Allows engineers to assert probability
    distributions based on linguistic statements.

11
Software Demonstration
  • Please do feel free to ask questions!

12
Additional Slides
  • These slides may be used toelaborate on certain
    points.

13
Project Structures
14
PBS and WBS Interaction
Product Breakdown Structure
Work Breakdown Structure
DesignLink
ManufacturingLink
15
Issues Important to Metso-Svedala
  • The following Metso-Svedala issues were
    identified
  • Conceptual design stage / tendering stage is
    critical
  • Uncertainty relating to original design
    elements is not currently quantified
  • Monitoring project target values is critical
    (similar to KPIs)
  • Metso-Svedala engineers need a fast method of
    evaluating data owing to time pressures
  • Not all Metso-Svedala engineers are familiar with
    probabilistic modelling methods