1CMM in Practice
2Outline
- Relationship between Quality Productivity and
Process - Introduction to Process Frameworks and CMM
- Infosys Company Overview
- Why CMM case study?
- CMM KPAs and its implementation at Infosys
- Conclusion
3Why process is important?
- Three main characteristics of a project are its
cost, schedule and quality. Productivity
determines the cost and schedule. - Productivity and Quality (QP) can be viewed as
the main goal of the project. - QP of an organization depends on three factors
process, people and technology.
4Quality Triangle
Technology
Process
Q P
People
5Process Framework
- People and Technology remaining constant, QP can
be improved by improving the Process. - Process Frameworks specify the desirable
characteristics of the process. - CMM and ISO 9001 are two popular process
frameworks. - CMM is more oriented towards software projects.
6Capability Maturity Model
- CMM defines five maturity levels.
Productivity and Quality
5
Optimizing
Change Management Defect Prevention
4
Managed
Continuously Improving
Product and Process Quality
Engineering Process
3
Defined
Predictable
Standard, Consistent
Repeatable
2
Project Management
Disciplined
Initial
1
Heroes
Project Risk
7Key Process Area (KPA)
- CMM defines Key Process Areas (KPA) for each
maturity level which specify the areas on which
the organization should focus to elevate its
process to that maturity level. - CMMI also defines goals/ key practices for each
KPA, which can be used to satisfy the
requirements of the KPA.
8Level
Key Process Area
Focus Area
Technology Change Management Process Change
Management Defect Prevention
5- Optimizing
Continuous Improvement
Quantitative process Management Software Quality
Management
4- Managed
Product and Process quality
Organizational Process Focus Organizational
Process Definition Training Program Integrated
Software Management Software Product
Engineering Inter-group Coordination Peer Reviews
3- Defined
Engineering Process
Requirements Management Software Project
Planning Software Project Tracking Software
Subcontractor Management Software Configuration
Management Software Quality Assurance
2- Repeatable
Project Management
1- Initial
9Infosys
- In this presentation Infosys is used as the model
company to study CMM in practice. - Infosys is a CMM Level 5 company.
- Infosys is also an ISO 9001 - TickIT certified.
- Infosys is a billion dollar company with around
30,000 employees.
10Why CMM Case Study?
- CMM specifies the characteristics of a good
software process but does not define the process. - Studying the real world implementation of CMM
guidelines gives a better understanding of the
CMM requirements. - This practical knowledge can be used to implement
improved software processes. - The case study also helps to evaluate the
effectiveness of CMM guidelines.
11What we have covered so far
- Quality Productivity and Process
- Process Framework and CMM
- Infosys Overview
- Why CMM case study?
- Conclusion
- CMM KPA and Process at Infosys
12Organization Process Focus KPA
- OPF is a KPA for CMM Level 3.
- Goals of OPF as defined by CMM are
- Software process development and improvement
activities are coordinated across the
organization. - The strength and weaknesses of the software
processes used are identified. - Organization-level process development and
improvement activities are planned.
13SEPG
- OPF KPA is achieved by implementing the Software
Engineering Process Group. - The responsibility of SEPG are
- Process Management This includes process
definition and enhancement. - Process Implementation
- Audit
14Software Product Engineering KPA
- SPE is a KPA for Level 3.
- Goals of SPE as defined by CMM are
- The software engineering tasks are defined,
integrated and consistently performed to produce
the software. - Software work products are kept consistent with
each other.
15Requirements Management KPA
- RM is a level 2 KPA.
- Goals of RM as defined by CMM are
- Software requirements are controlled to establish
a base line for software engineering and
management activities. - Software plans, products and activities are kept
consistent with requirements.
16Realizing SPE and RM KPA
- SPE and RM KPA are achieved by defining process
for Requirement Analysis, Requirement Change
Management and Traceability management.
17Requirement Analysis
- Process for requirement analysis
- Template for requirement specification.
- Sample checklist for review.
Gather Req
Analyze
Prepare
Sign-off
Review
Prepare SRS
18Requirement Change Management
- Changes are inevitable but needs to be managed.
- Steps in the change management process
- Log the changes
- Perform impact analysis on work products
- Estimate effort need for change requests
- Evaluate the effect on project schedule.
- Review with senior management.
- Obtain customer sign off
19Requirement Change Management
- Sample change request.
- Cumulative impact of all the changes are also
recorded and monitored. - Sample of Tracking Cumulative Effect of Changes.
20Traceability Management
- Traceability makes it possible to trace each
requirement to design and code that implement
that requirement and test cases that test the
implementation. - Benefits of Traceability
- Ensures that all requirements are implemented.
- Ensures that test cases are developed for all
requirements. - Helps in impact analysis.
21Traceability Matrix
- At Infosys traceability is maintained in a
traceability matrix. - Sample Traceability Matrix.
- Audits on Traceability Matrix.
22Organization Process Definition KPA
- OPD is a level 3 KPA
- Goals of OPD as defined by CMM are
- A standard software process for the organization
is developed and maintained. - Information related to the use of the
organizations standard software process by the
software projects is collected, reviewed and made
available. - Process Models are used to implement OPD
23Process Models
- Process Models for different types of project
like development, maintenance, testing etc are
defined and used. - Process Model divides the process into small well
defined phases. - For each phase the input and deliverable and the
activities are clearly defined. - The relation between the phases are also defined.
24Integrated Software Management KPA
- ISM is a KPA for level 3.
- Goals of ISM KPA are
- The project's defined software process is
tailored version of the organizations standard
software process. - The project is planned and managed according to
the project's defined software process. - Process Tailoring is used to implement ISM.
25Process Tailoring
- Standard process for different types of project
like development, maintenance etc are defined. - Tailoring is the act of modifying the standard
organization process so that the resulting
process is better suited for achieving the goals
of the project. - Tailoring Guidelines permissible rules for
changing the standard process.
26Process Tailoring
- Sample Tailoring Guideline
- Sample Process Tailoring document.
27Quantitative Process Management KPA
- QPM is a KPA for level 4
- The Goals for QPM are
- The quantitative process management activities
are planned. - The process performance of the projects defined
software process is controlled quantitatively. - The process capability of the organizations
standard software process is known in
quantitative terms.
28Process Database and Capability Baseline
- Quantitative Process Management KPA is achieved
using PDB and PCB. - PDB (Process Database) consists of data from the
completed projects with each project contributing
a single data point. - PCB (Process Capability Baseline) is derived from
PDB and contains the capability baseline of
different processes in quantitative terms.
29PDB and PCB
- The capability of a process is essentially the
range of outcomes that can be expected if the
process is followed. - The main data that are captured in PDB and PCB
are productivity, effort, quality and defects.
30Information Flow
Project Estimates
Project Actual - IPM
Process Artifacts
Process Data From Closure reports
Process Database
Process Assets
Analyzed Process data
Process Capability Baseline
31Defect Prevention KPA
- Defect Prevention (DP) is a Level 5 KPA.
- Goals of DP as defined by CMM are
- Defect prevention activities are planned
- Common causes of defects are sought and
identified - Common causes of defect are prioritized and
systematically eliminated
32Defect Prevention
Evaluate Evaluate DP Capture Learnings
Execute Do defect prevention
Plan Conduct Kick - off meeting Milestones
for DP
Prepare Identify DP team Training
Project DP Activities starts from Project kick
off
33Conclusion
- Studying the Implementation of KPAs gives a
better understanding of the KPAs. - This Case Study illustrates one way of
implementing KPAs as defined by CMM in real
world. - This practical knowledge can be utilized as a
base line for defining better software process. - This case study also illustrates the
effectiveness of CMM guidelines in improving
Quality and Productivity of an organization.
34Questions