Title: CMM in Practice


1
CMM in Practice
  • Presented By Manas Singh

2
Outline
  • Relationship between Quality Productivity and
    Process
  • Introduction to Process Frameworks and CMM
  • Infosys Company Overview
  • Why CMM case study?
  • CMM KPAs and its implementation at Infosys
  • Conclusion

3
Why process is important?
  • Three main characteristics of a project are its
    cost, schedule and quality. Productivity
    determines the cost and schedule.
  • Productivity and Quality (QP) can be viewed as
    the main goal of the project.
  • QP of an organization depends on three factors
    process, people and technology.

4
Quality Triangle
Technology
Process
Q P
People
5
Process Framework
  • People and Technology remaining constant, QP can
    be improved by improving the Process.
  • Process Frameworks specify the desirable
    characteristics of the process.
  • CMM and ISO 9001 are two popular process
    frameworks.
  • CMM is more oriented towards software projects.

6
Capability Maturity Model
  • CMM defines five maturity levels.

Productivity and Quality
5
Optimizing
Change Management Defect Prevention
4
Managed
Continuously Improving
Product and Process Quality
Engineering Process
3
Defined
Predictable
Standard, Consistent
Repeatable
2
Project Management
Disciplined
Initial
1
Heroes
Project Risk
7
Key Process Area (KPA)
  • CMM defines Key Process Areas (KPA) for each
    maturity level which specify the areas on which
    the organization should focus to elevate its
    process to that maturity level.
  • CMMI also defines goals/ key practices for each
    KPA, which can be used to satisfy the
    requirements of the KPA.

8
Level
Key Process Area
Focus Area
Technology Change Management Process Change
Management Defect Prevention
5- Optimizing
Continuous Improvement
Quantitative process Management Software Quality
Management
4- Managed
Product and Process quality
Organizational Process Focus Organizational
Process Definition Training Program Integrated
Software Management Software Product
Engineering Inter-group Coordination Peer Reviews
3- Defined
Engineering Process
Requirements Management Software Project
Planning Software Project Tracking Software
Subcontractor Management Software Configuration
Management Software Quality Assurance
2- Repeatable
Project Management
1- Initial
9
Infosys
  • In this presentation Infosys is used as the model
    company to study CMM in practice.
  • Infosys is a CMM Level 5 company.
  • Infosys is also an ISO 9001 - TickIT certified.
  • Infosys is a billion dollar company with around
    30,000 employees.

10
Why CMM Case Study?
  • CMM specifies the characteristics of a good
    software process but does not define the process.
  • Studying the real world implementation of CMM
    guidelines gives a better understanding of the
    CMM requirements.
  • This practical knowledge can be used to implement
    improved software processes.
  • The case study also helps to evaluate the
    effectiveness of CMM guidelines.

11
What we have covered so far
  • Quality Productivity and Process
  • Process Framework and CMM
  • Infosys Overview
  • Why CMM case study?
  • Conclusion
  • CMM KPA and Process at Infosys

12
Organization Process Focus KPA
  • OPF is a KPA for CMM Level 3.
  • Goals of OPF as defined by CMM are
  • Software process development and improvement
    activities are coordinated across the
    organization.
  • The strength and weaknesses of the software
    processes used are identified.
  • Organization-level process development and
    improvement activities are planned.

13
SEPG
  • OPF KPA is achieved by implementing the Software
    Engineering Process Group.
  • The responsibility of SEPG are
  • Process Management This includes process
    definition and enhancement.
  • Process Implementation
  • Audit

14
Software Product Engineering KPA
  • SPE is a KPA for Level 3.
  • Goals of SPE as defined by CMM are
  • The software engineering tasks are defined,
    integrated and consistently performed to produce
    the software.
  • Software work products are kept consistent with
    each other.

15
Requirements Management KPA
  • RM is a level 2 KPA.
  • Goals of RM as defined by CMM are
  • Software requirements are controlled to establish
    a base line for software engineering and
    management activities.
  • Software plans, products and activities are kept
    consistent with requirements.

16
Realizing SPE and RM KPA
  • SPE and RM KPA are achieved by defining process
    for Requirement Analysis, Requirement Change
    Management and Traceability management.

17
Requirement Analysis
  • Process for requirement analysis
  • Template for requirement specification.
  • Sample checklist for review.

Gather Req
Analyze
Prepare
Sign-off
Review
Prepare SRS
18
Requirement Change Management
  • Changes are inevitable but needs to be managed.
  • Steps in the change management process
  • Log the changes
  • Perform impact analysis on work products
  • Estimate effort need for change requests
  • Evaluate the effect on project schedule.
  • Review with senior management.
  • Obtain customer sign off

19
Requirement Change Management
  • Sample change request.
  • Cumulative impact of all the changes are also
    recorded and monitored.
  • Sample of Tracking Cumulative Effect of Changes.

20
Traceability Management
  • Traceability makes it possible to trace each
    requirement to design and code that implement
    that requirement and test cases that test the
    implementation.
  • Benefits of Traceability
  • Ensures that all requirements are implemented.
  • Ensures that test cases are developed for all
    requirements.
  • Helps in impact analysis.

21
Traceability Matrix
  • At Infosys traceability is maintained in a
    traceability matrix.
  • Sample Traceability Matrix.
  • Audits on Traceability Matrix.

22
Organization Process Definition KPA
  • OPD is a level 3 KPA
  • Goals of OPD as defined by CMM are
  • A standard software process for the organization
    is developed and maintained.
  • Information related to the use of the
    organizations standard software process by the
    software projects is collected, reviewed and made
    available.
  • Process Models are used to implement OPD

23
Process Models
  • Process Models for different types of project
    like development, maintenance, testing etc are
    defined and used.
  • Process Model divides the process into small well
    defined phases.
  • For each phase the input and deliverable and the
    activities are clearly defined.
  • The relation between the phases are also defined.

24
Integrated Software Management KPA
  • ISM is a KPA for level 3.
  • Goals of ISM KPA are
  • The project's defined software process is
    tailored version of the organizations standard
    software process.
  • The project is planned and managed according to
    the project's defined software process.
  • Process Tailoring is used to implement ISM.

25
Process Tailoring
  • Standard process for different types of project
    like development, maintenance etc are defined.
  • Tailoring is the act of modifying the standard
    organization process so that the resulting
    process is better suited for achieving the goals
    of the project.
  • Tailoring Guidelines permissible rules for
    changing the standard process.

26
Process Tailoring
  • Sample Tailoring Guideline
  • Sample Process Tailoring document.

27
Quantitative Process Management KPA
  • QPM is a KPA for level 4
  • The Goals for QPM are
  • The quantitative process management activities
    are planned.
  • The process performance of the projects defined
    software process is controlled quantitatively.
  • The process capability of the organizations
    standard software process is known in
    quantitative terms.

28
Process Database and Capability Baseline
  • Quantitative Process Management KPA is achieved
    using PDB and PCB.
  • PDB (Process Database) consists of data from the
    completed projects with each project contributing
    a single data point.
  • PCB (Process Capability Baseline) is derived from
    PDB and contains the capability baseline of
    different processes in quantitative terms.

29
PDB and PCB
  • The capability of a process is essentially the
    range of outcomes that can be expected if the
    process is followed.
  • The main data that are captured in PDB and PCB
    are productivity, effort, quality and defects.

30
Information Flow
Project Estimates
Project Actual - IPM
Process Artifacts
Process Data From Closure reports
Process Database
Process Assets
Analyzed Process data
Process Capability Baseline
31
Defect Prevention KPA
  • Defect Prevention (DP) is a Level 5 KPA.
  • Goals of DP as defined by CMM are
  • Defect prevention activities are planned
  • Common causes of defects are sought and
    identified
  • Common causes of defect are prioritized and
    systematically eliminated

32
Defect Prevention
Evaluate Evaluate DP Capture Learnings
Execute Do defect prevention
Plan Conduct Kick - off meeting Milestones
for DP
Prepare Identify DP team Training
Project DP Activities starts from Project kick
off
33
Conclusion
  • Studying the Implementation of KPAs gives a
    better understanding of the KPAs.
  • This Case Study illustrates one way of
    implementing KPAs as defined by CMM in real
    world.
  • This practical knowledge can be utilized as a
    base line for defining better software process.
  • This case study also illustrates the
    effectiveness of CMM guidelines in improving
    Quality and Productivity of an organization.

34