Hana Mining Ltd' - PowerPoint PPT Presentation

1 / 30
About This Presentation
Title:

Hana Mining Ltd'

Description:

20 percussion holes completed. Total meters drilled to date: ... 2,160m percussion. Total number of drill samples collected = 3,723 3200 soil samples collected ... – PowerPoint PPT presentation

Number of Views:64
Avg rating:3.0/5.0
Slides: 31
Provided by: joseph189
Category:
Tags: hana | ltd | mining | percussion

less

Transcript and Presenter's Notes

Title: Hana Mining Ltd'


1
(No Transcript)
2
Hana Mining Ltd.
  • HANA MINING Ltd.

2
3
Corporate Structure
TSX V Listing HMG Frankfurt Listing -
4LH Market Capitalization - 14 Million Current
Cash - 3,100,000 Insider / Institutional
Holdings - 50 Shares Outstanding 40,275,897 War
rants _at_ .17 - .75 9,830,967 Options _at_ .20
- .45 2,850,000 Total Fully
Diluted 52,956,864
3
4
Management
  • Marek J. Kreczmer, M.Sc., P. Eng. CEO 30
    years mining executive and geologist
  • Founder of Tan Range Exploration (now Tanzanian
    Royalty Exploration Corporation
    .
  • TNX-TSX, TRE-AMEX) and Northwestern Mineral
    Ventures (NWT-TSXV)
  • Founder of HMG TSXV
  • Peter G. Wilson President 15 years
    executive public finance experience
  • Extensive experience in corporate management
    and marketing
  • Joseph Arengi, M.Sc., P.Geo. VP Exploration 30
    years exploration geologist 2003-07 with Aur
    Resources evaluating copper projects
  • Bill Thomas, CA CFO 30 years financial
    management experience with a focus on the
  • natural resource sector worked with Denison
    Mines Ltd.
  • and two decades with Kerr McGee.
  • Jacques Janse van Rensburg, B.Sc (Hons) Pr.Sci
    Nat Project Manager 15
    years exploration geologist 2003 07 Anooraq
    Resources

  • and Pangea Diamond
    Fields

4
5
Hana in Botswana
  • 23 permanent employees
  • local consultants and contractors used for soil
    sampling, environmental assessment, camp
    construction
  • Employee training improve skills of employees
  • Good relations with farmers and local residents

5
6
Environmental Compliance
  • Environmental Baseline Assessment completed 2008
  • Water borehole monitoring program in place
  • Drill site cleanup compliant with PDAC
    recommended guidelines
  • Transparency is paramount

6
7
Hana Mining Ltd.
  • The Ghanzi Copper-Silver Project

7
8
Location
9
Project History
  • Most work done on property by Anglo American
    Prospecting Service during 1990s
  • Most recent work done by Delta Gold.

9
10
Hana Exploration
  • gt 60 diamond drill holes completed
  • gt 20 RC holes completed
  • gt 20 percussion holes completed
  • Total meters drilled to date
  • gt 10,000m core
  • gt 2,300m RC and
  • gt 2,160m percussion
  • Total number of drill samples collected 3,723
  • gt 3200 soil samples collected

10
11
Hana Exploration
  • 106 Drill holes to date, with 102 holes
    intersecting Cu mineralization
  • Airborne magnetic survey reprocessed and
    reinterpreted
  • IP and HLEM surveys completed over gt 75 line
    kilometers
  • Satellite imagery analysis
  • Total strike length of 13 km drill tested out of
    500 km

11
12
Geology
  • One of many copper deposits that extend 1000
    kilometers along the Neoproterozoic age Damara
    Mobile Belt
  • Mineralization occurs above the contact between
    finely laminated and chemically reduced mudstones
    and siltstones of the DKar Formation and
    oxidized arkoses and sandstones of the Ngwako Pan
    Formation
  • Folding along northeast trending axes has
    repeated the stratigraphy resulting in gt 500 km
    of cumulative strike length
  • Similar grades mineralization to Kupferschiefer
    in Germany Poland

12
13
Geology
13
14
Overall Scale of Project
14
15
Mineralization
  • Sediment-hosted Cu-Ag mineralization hosted in
    redox front
  • Copper minerals include bornite, chalcopyrite,
    chalcocite, malachite, Cu Oxides
  • Mineralization occurs as finely disseminated
    specks, finely laminated, concordant and
    discordant veins and veinlets

15
16
Mineralization
17
Mineralization
18
Exceptional Potential
18
19
Exceptional Potential
19
20
Target Areas
20
21
Zone 1 North Section
22
Zone 1 South Section
23
Zone 2
23
24
Zone 2 South Limb
25
Zone 6
25
26
Zone 6 Section
27
Moving Forward
  • Continue chasing drill targets along extensions
    of prospective horizons making use of ground
    geophysics
  • Generate NEW targets with aeromag and soil
    geochemistry
  • Follow up preliminary RC drilling in Zone 6 where
    mineralization has been proven
  • Drill test existing targets at Zones 3, 4 and 5
  • Enlarge historical resource
  • Open country office in Gabs
  • Country advisor appointed

27
28
Moving forward
Four rigs will continue to test different
mineralized horizons
28
29
Moving forward
Generate drill targets in unexplored areas using
soil geochemistry
29
30
Hana Mining Ltd.
  • Thank you

30
Write a Comment
User Comments (0)
About PowerShow.com