Title: Equipment History Report
1IW40
Equipment History Report
Use this procedure to display a multi-level work order history of all maintenance work orders on a particular vehicle. From the SAP R/3 System Easy Access screen or from your favorites, enter or select transaction code IW40. Click or press Enter. The Order List (Multi-Level) Selection of Orders screen displays. In the Order Status section, select Completed. In the Order selection section, enter the equipment number and the date range. In the Filter section, check Order, Confirmation, Goods movement, Equipment, Operation, and Costs. Click on . The Order List (Multi-Level) List of Orders screen displays. Click on Color Legend icon to get a pop-up box to see the meaning of each color. Refer to the back of this sheet for a graphical view of this report. Refer to the attached handout for information on how to work with this report.
Basic Commands
Back Cancel Help Exit Enter Save Execute
Drill-down on the work order number to display
the actual work order.
2Equipment , Vehicle , Description
Order, Description, Status, Date, Created by
Operations, Start/Finish Dates,
Confirmation, Hours, Personnel No.
Material ,Qty, Description, Price, Mvt Type
Costs
- IW40 WORK ORDERS (EQUIPMENT HISTORY)
- Selection of Fields
- Use IW40 to inquire on work orders for a given
vehicle. The screen may be formatted to display
the fields you wish to see. And filter out the
unwanted items. - Once you have selected the orders, you may select
or delete fields as desired. Use the
Settings/Field Selection menu, then choose either
Order Header or Operations Data. Once you have
the Choose Fields window, use the suggestion
below to move fields into the Selection Criteria
column. You may also use the Move Icon to
arrange the fields within the Selection Criteria
column. - Under Order Header Data, choose Order, Equipment
or Costs. - Under Order, choose Description and Reference
Date. - Under Equipment, choose Equipment, User Status,
Inventory number, Construction (Model) Year,
and Equipment Description. - Under Costs/Revenues, choose Actual Costs and
Text - Under Operations Data, choose Operation,
Completion Confirmation or Goods Movements - Under Operation, choose Operation and Short Text
- Under Completion Confirmation, choose Actual
Work, Personnel Number, Posting Date - Under Goods Movements, choose Material, Material
Description, Quantity, Base Unit of Measure,
and Amount in Local Currency (Price)