Title: Open source components in safety critical systems


1
Open source components in safety critical
systems
  • Suvi-Maaret Suomalainen
  • 7.12.2004

2
Content
  • Introduction
  • QA for safety critical system
  • QA in open source development
  • Examples
  • Conclusions

3
Introduction (1/2)
  • Background
  • - use of safety critical system
  • - closed automation system
  • - quality of OSS
  • Motivation
  • - closed system
  • - few suppliers
  • - high prices

4
Introduction (2/2)
  • Research Problem and objectives
  • Can components of the safety critical software be
    open source components?
  • Comparing OSS quality assurance to the
    requirements of IEC 61508
  • Method
  • Literature study
  • INSPEC and IEEE databases
  • Scope
  • European IEC 61508
  • Verification methods
  • No hardware requirements

5
QA for safety critical system
  • Safety plan
  • software lifecycle
  • Testing
  • test plans in early phases
  • documentation
  • test tools and environments
  • testing independence
  • Testing techniques
  • dynamic
  • static
  • modeling

6
QA in open source projects
  • No project plan
  • good configuration tools
  • change management differs
  • No testing plans
  • Different techniques
  • Testing independence
  • No documents
  • Highly motivated developers

7
Examples
  • Most used Linux (OS and real time OS)
  • CVS repositories
  • Bug database
  • Documentation volunteer work
  • Others used in user interfaces and specification
    tool (not so safety critical)
  • NASA experiences
  • Project maturity
  • Project longevity
  • Flexibililty

8
Conclusions
  • Differences between IEC 61508 and OSS
  • test plans
  • testing techniques mainly dynamic
  • documentation
  • change management
  • OSS cant be used as such
  • management for the developer of the safety system
  • testing and documenting

9