STAFFING, CONTRACTS - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

STAFFING, CONTRACTS

Description:

STAFFING, CONTRACTS – PowerPoint PPT presentation

Number of Views:67
Avg rating:3.0/5.0
Slides: 26
Provided by: ESBS
Category:

less

Transcript and Presenter's Notes

Title: STAFFING, CONTRACTS


1
STAFFING, CONTRACTS RESOURCES David Blackburn
- Waste Management
2
THE COUNTY
  • Population 396,000
  • Households 178,500
  • Excludes Unitary Authorities of Poole and
    Bournemouth

3
Civic Amenity Sites
  • 11 Bulky Household Waste Sites
  • Total Tonnage 2001/ 02 - 69,000
  • Total Visits to sites 2001/ 02 - 1.3m

4
CA Site Usage Patterns
  • 80 by cars (or estate cars)
  • 7 by small or large vans
  • 7 by 4x4s or pick-ups
  • 7 of ALL visits with trailers

5
OTHER VEHICLES
6
Purpose of Visits
  • 46 garden waste
  • 6 residual household ONLY
  • 20 bought items from the re-use area
  • Mean average no. visits 3.5 / month

7
RECYCLING RATES
  • County Wide - 26
  • CA Average (excluding rubble) - 58
  • Highest CA site - 68
  • Lowest CA site - 51

8
SHERBORNE T/S CA SITE
9
THE TIP ? AT BLANDFORD
10
SEPARATION OF USERS CONTRACTOR AT CHRISTCHURCH
11
DEDICATED ASBESTOS CONTAINER
12
MECHANICAL VS MANUAL LOADING AND COMPACTION
13
Elements of a Contract
  • Definitions
  • Payments / Schedule of Rates / Fluctuation
  • Form of Tender / Bond / Agreement
  • Insurance
  • Statutory Obligations
  • Termination

14
Contract Elements (Continued)
  • Contractors Obligations
  • Contract Particulars
  • Premises, Plant and Equipment
  • Maintenance and Services
  • Quality Standards

15
Specification
  • Input or Output based
  • Items for inclusion
  • Security / Plant / Equipment / WML / Assistance /
    Appearance / Behaviour / Cleanliness /
    Maintenance / WAMITAB / Recycling

16
Specification (Continued)
  • Method Statement
  • Location Plans
  • Quality Standards

17
STAFFING
  • Training
  • Conditions of Employment
  • League Tables of Performance
  • Feedback and Suggestions - Team
  • Monitoring

18
RESOURCES
  • Method Statement
  • Specify minimum provision
  • Shadow Bid
  • Evaluation Process
  • Effective Monitoring Regime

19
SITE WITH LOW RECYCLING PERFORMANCE
20
THE REPLACEMENT SITE
21
Changing a Tip into a RECYCLING CENTRE
  • Recycling increased 26 to 63
  • Bonus / Incentive scheme
  • Staff and Resources
  • Range of Facilities

22
Changing to a Recycling Centre
  • Site Layout presentation
  • Effective and efficient use of staff
  • Education of users
  • Contract / Specification Details
  • Establish Re-use areas

23
THE POPULAR SALES (RE-USE) AREA
24
THE FUTURE
  • DEFRA funding bid - 260,000
  • Wood shredding scheme
  • Fluorescent lamps
  • Mixed household batteries
  • Rubble Restrictions
  • Van trailer restrictions

25
ALTERNATIVE TRANSPORT IN THE RURAL COUNTY
Write a Comment
User Comments (0)
About PowerShow.com