Lt Col Tim Thompson - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

Lt Col Tim Thompson

Description:

Operationally Responsive Space Need. Major tasks. Transport mission assets to, through ... Contribute to energizing small satellite/launcher industrial base. 6 ... – PowerPoint PPT presentation

Number of Views:17
Avg rating:3.0/5.0
Slides: 8
Provided by: Word6
Category:
Tags: col | energizing | thompson | tim

less

Transcript and Presenter's Notes

Title: Lt Col Tim Thompson


1
Responsive Space ConferenceSpace Needs Panel
Session
  • Lt Col Tim Thompson
  • 20 Apr 04

2
AFSPC - Operationally Responsive Space Need
  • Major tasks
  • Transport mission assets to, through and from
    space
  • Spacecraft servicing
  • Key capabilities
  • On-demand payload deployment (CAV and satellites)
  • Launch to sustain constellations for peacetime
    ops
  • Recoverable, rapid-response transport
  • Integrated space operations mission planning
  • Key characteristics
  • Responsive, maneuverable, economical, survivable,
    flexible, interoperable

JROC-Validated Mission Needs Statement (Apr 02)
3
ORS Analysis of Alternatives
  • Determine military utility of potential
    capabilities that ORS can provide to meet
    National Security needs across all AFSPC mission
    areas
  • - Force Application - Counterspace
  • - Force Enhancement - Space Support
  • Evaluate range of candidate solutions for the ORS
    Mission Needs Statement
  • Launch emphasis, with insight into other
    capabilities
  • Develop launch alternatives
  • Broad trade space expendable, reusable, hybrid
    rocket and air breathers
  • Determine life cycle cost/risk for each
    alternative
  • Provide acquisition strategy and technology/risk
    mitigation roadmap for a potential ORS
    acquisition decision

4
AoA Findings
  • AoA results identified key risk areas and
    uncertainties that must be addressed prior to
    acquisition decision
  • Spacelift ground processing timelines
  • RLV and small ELV production costs
  • RLV technology maturation

5
AFRL-AFSPC TacSat Initiative
  • OVERALL OBJECTIVE - Build an executable plan to
    demonstrate TacSats in warfighter experiments,
    exercises, and wargames to reduce risks in future
    responsive space systems acquisition
  • TACSAT CHARACTERISTICS
  • Responsive
  • Development lt 15 Months
  • Launch from Call-Up lt 7 days
  • Operational from Orbital Insertion lt 1 day
  • Integrated Spacecraft Weight 1000 Lb
  • DEMONSTRATION PROGRAM
  • Launch on 12 month centers
  • Build upon on-going TacSat-1 and TacSat-2
    programs
  • Leverage DARPA/AF FALCON program booster
    development
  • Community-wide participation
  • Government AFSPC/NRO/DARPA/ONR/AFMC(AFRL)
  • Industry
  • Academia
  • Goal for first operational system spiral IOC
    2011

Contribute to energizing small satellite/launcher
industrial base
6
Vision for Joint Warfighting Space (JWS)
  • Rapid-reaction, Joint Forces Commander (JFC)
    -dedicated space capabilities
  • Tailored for specific missions/geographic areas
  • Emphasis on operational/tactical levels of war
  • Real time integration into self-forming/self-heali
    ng networks
  • Provides decision quality data to the warfighter
  • Augments national asset support

7
Joint Warfighting Space Implications
  • May require relatively low-cost, short-lived
    satellites
  • Focused-mission satellites
  • Standard buses with plug-n-play payload
    interfaces
  • War-ready reserve of launchers and payloads
  • ISR, comm, nav, space superiority and CAV
    payloads
  • Mission flexibility through modular components
  • Establish routine and rapid acquisition for space
  • Develop, fabricate and field urgent combat
    solutions
  • Implementation may require new operational
    concepts
  • C2 organizational relationships and processes
  • Responsive range and launch operations
  • Satellite/payload integration and on-orbit
    operations
Write a Comment
User Comments (0)
About PowerShow.com