1
Improving Plant Operating Efficiency through Lean
Production Methods
  • Lean Advocate Training

2
Orientation
  • Jordan Dentz

3
Orientation
  • Project goal
  • Introductions
  • What is lean?
  • Project plan
  • Roles and responsibilities
  • Training program schedule

4
Project Goal
  • Transform the way homes are manufactured,
    substantially reducing manufacturing costs,
    production time, product defects, and labor hours
    per home while improving quality.

5
Method
  • Plan and implement cost-justified changes in
    manufacturing process by implementing concepts of
    lean production
  • Establish within the plant a culture of
    continuous improvement and develop a system to
    institutionalize these changes

6
Self Introductions
  • Cavalier Homes
  • Chelsea Modular
  • Clayton Homes
  • Four Seasons Housing
  • Hi-Tech Housing
  • Palm Harbor Homes, Albemarle
  • Palm Harbor Homes, Plant City
  • R-Anell Housing
  • Southern Energy Homes

7
MHRA Team
  • MHRA project coordination
  • Jordan Dentz
  • Senco training and plant facilitation
  • Dewey Warden
  • University of Central Florida - training and
    plant facilitation
  • Dr. Michael Mullens

8
Lean What is it?Dr. Mike Mullens, UCF
  • A general way of thinking and specific practices
    that focus on using less of everything.
  • An approach to manufacturing that transforms the
    plants culture to one in which all forms of
    waste are systematically and continuously rooted
    out at all levels.

9
Lean Guiding Principles
10
Lean Management Perspective
  • Is a culture -- not a management technique.
  • Focuses on processes -- not just results.
  • Applies to both production and office functions.

11
Lean Benefits
  • From establishing and mastering a lean production
    system

Source 1000Ventures.com
12
Characteristics of a Lean Factory
  • Orderly, clean work place
  • Standardized best methods
  • Plant layout facilitates continuous flow
  • Just-in-time processing driven by customer demand
    or pull
  • Single piece or small batch continuous workflow
  • Quick changeovers of machines/processes
  • Minimal inventories

13
Characteristics of a Lean Factory
  • Short order-to-ship cycles times
  • Total quality control
  • Defect prevention built into processes
  • Preventative maintenance
  • Team-based continuous improvement
  • Partnership-oriented relations with suppliers and
    distributors

14
Milestones
  • Select plants
  • Train lean advocates
  • Map plant value streams
  • Develop lean implementation strategy
  • Conduct RPI events
  • Re-convene to evaluate progress

15
Select Plants
  • Cavalier Homes
  • Chelsea Modular
  • Clayton Homes
  • Four Seasons Housing
  • Hi-Tech Housing
  • Palm Harbor Homes, Albemarle
  • Palm Harbor Homes, Plant City
  • R-Anell Housing
  • Southern Energy Homes

16
Train Lean Advocates
  • Train lean advocates in the concepts and
    techniques of lean production
  • Charge lean advocates with tasks to complete back
    at their plant

17
Map the Value Stream
  • Collect data to describe current plant
    performance
  • Develop current-state value stream map
  • Identify specific areas for improvement
  • Conduct detailed observations and create process
    flow maps of those areas
  • Develop future-state value stream map

18
Develop Strategy
  • Select areas for improvement
  • Develop a strategy for implementing lean
    improvements as depicted on the future-state
    value stream map
  • Strategy will be based on conducting at least
    three RPI events

19
Conduct RPI Events
  • Train plant staff to participate in RPI events
  • Conduct at least three RPI events
  • Document and evaluate the RPI events
  • Report results to plant management
  • Plant lean advocates will be encouraged to
    conduct additional RPI events in between
    advisory team member visits

20
Re-convene to Evaluate Progress
  • One-day de-briefing where all participants will
    share experiences

21
Schedule
  • April Training
  • May Value stream mapping
  • June - September RPI events
  • November Final team meeting

22
Key Players and Their Roles
  • Plant management support
  • Lean advocates facilitate, lead
  • Plant staff participate
  • MHRA team (MHRA, Senco, UCF) guide

23
Plant Management
  • Assign senior staff members as the lean advocates
  • Make available other plant staff as necessary to
    assist the lean advocates
  • Support of senior management for lean activities

24
Lean Advocate
  • Approximately 200 hours
  • Pivotal members of the project team
  • Develop value stream maps
  • Train plant staff
  • Lead RPI events
  • Document RPI events
  • Participate in final team meeting

25
Plant Staff
  • Support the data collection effort
  • Undergo pre-RPI training lead by the lean
    advocates
  • Participate in RPI events
  • Participate in the continuous improvement process

26
MHRA Team
  • Dentz overall project coordination
  • Warden and Mullens serve as primary team contact
    for 4 or 5 plants
  • Responsibilities
  • Guidance on value stream mapping
  • Feedback and input on strategy
  • Facilitate RPI events
  • Four visits to each plant
  • Be a sounding board for any lean issues for the
    duration of the project

27
Plant Assignments
  • Cavalier Homes
  • Chelsea Modular
  • Clayton Homes
  • Palm Harbor Homes, Plant City
  • Southern Energy Homes
  • Team contact Michael Mullens
  • Four Seasons Housing
  • Hi-Tech Housing
  • Palm Harbor Homes, Albermarle
  • R-Anell Housing
  • Team contact Dewey Warden

28
Agenda - Monday
  • Orientation 800 to 900
  • Senco plant tours 900 to 1200
  • Visit to daily accountability meeting room 1200
    to 1230
  • Lunch and panel discussion 1230 to 130
  • Sencos Lean Transformation and Management
    Commitment 130 to 230
  • Lean Basics 230 to 400
  • Demonstrations 400 to 530

29
Agenda - Tuesday
  • Value stream mapping current state
  • Case study
  • Value stream mapping exercise
  • Review of exercise

30
Agenda - Wednesday
  • Value stream mapping future state
  • Case study drawing the future state
  • Value stream mapping exercise future state
  • Review of exercise

31
Agenda - Thursday
  • RPI event overview
  • The 5 Ss
  • Plant focus areas

32
Agenda - Friday
  • Review of lean topics
  • Next steps discussion of assignments
  • Tools
  • Wrap-up

33
Daily Schedule
  • Meet in hotel lobby 700 for ride to Senco
  • Breakfast 730 in Senco training room
  • Lunch in Lean Management Training Room
  • Ride back to hotel
  • Dinner meet in hotel lobby 630pm

34
In Conclusion
  • Ask questions
  • Share ideas
  • Debate concepts
  • Discuss past experiences
  • After each concept is introduced how can this
    apply to a housing plant?