Car parking / pedestrian access. Deliveries. Key. Central staff spaces. Social Spaces / Dining ... Main Dining Hall. Toilets. Medical. Room ... – PowerPoint PPT presentation

Number of Views:15
Avg rating:3.0/5.0
Slides: 15
Provided by: rob53
Category:
Tags: option

less

Transcript and Presenter's Notes

Title: OPTION 1


1
(No Transcript)
2

Background - High Storrs School
3
Ground Floor Original 1933 Drawings
4
Vision -High Storrs School
5
BSF KEY QUESTIONS OF LEADERSHIP
  • What does a transformed school look like?
  • What are the curricular and organisational
    aspects?
  • The implications of transformation and
    risk-taking?
  • Expertise and capacity required to secure the BSF
    Learning Dividend?
  • Support for remodelling and standards over an
    extended period?
  • Specialist curricular design expertise?
  • Maintaining momentum, vision and energy?
  • Engagement with school leaders and wider learning
    communities?

Proposed Scheme Indicative Landscape, High
Storrs School
6
Space Relationship Diagram - High Storrs School
7
Proposed Scheme Indicative Landscape, High
Storrs School
8
Proposed Scheme, High Storrs School
9
(No Transcript)
10
  • N01 - NEW BUILD PHASE
  • Works to be undertaken
  • Build New North Block
  • R01 REFURBISHMENT PHASE
  • Works to be undertaken
  • Refurb North West wing of Building
  • Key Accommodation issues
  • Performing Arts in temporary accommodation
  • Food Tech in temporary accommodation
  • Art remain in-situ
  • NT accommodation block to provide 19 teaching
    spaces
  • Temporary Kitchen to be provided by SCC
    location to be decided
  • No Main Hall provided

11
  • N01 - NEW BUILD PHASE
  • Works to be undertaken
  • Build New North Block
  • R02 REFURBISHMENT PHASE
  • Works to be undertaken
  • Refurb South West wing of Building
  • Key Accommodation issues
  • Performing Arts in temporary accommodation
  • Food Tech in temporary accommodation
  • Art remain in-situ
  • NT accommodation block to provide 19 teaching
    spaces
  • Temporary Kitchen to be provided by SCC
    location to be decided
  • No Main Hall provided
  • South Gym (Main Bldg) remains in operation

12
  • N02 - NEW BUILD PHASE
  • Works to be undertaken
  • Build Sth Block Sports Hall etc
  • Demolish Art block
  • R03 REFURBISHMENT PHASE
  • Works to be undertaken
  • Refurb North East wing of Building
  • Key Accommodation issues
  • Performing Arts transferred to new North Block
  • Art transferred to new North Block
  • Food tech moved to permanent location in Main
    Bldg
  • CDT moved from Sth Blcok to new North block
  • NT accommodation block to provide 19 teaching
    spaces
  • 5No temporary Science labs
  • Hall / Kitchen / dinning / Library in new north
    block
  • South Gym (Main Bldg) remains in operation

13
  • N02 - NEW BUILD PHASE
  • Works to be undertaken
  • Build Sth Block Sports Hall etc
  • R04 REFURBISHMENT PHASE
  • Works to be undertaken
  • Refurb South East wing of Building
  • Key Accommodation issues
  • NT accommodation block to provide 19 teaching
    spaces
  • 5No temporary science labs
  • South Gym (Main Bldg) out of operation