Title: Stream Biogeochemistry
1- Stream Biogeochemistry
- What is it and why should you care?
- Autotrophy, Heterotrophy and Nutrient Limitation
- Measuring Nutrient Cycling in Streams
- Experiments Cool Frontiers
2(No Transcript)
3(No Transcript)
4(No Transcript)
5(No Transcript)
6INPUTS OUTPUTS
7Streams are the gutters down which flow the
ruins of continents --Leopold, Wolman and
Miller, 1964
8Water Sources
Precipitation
Stream Segment
Lateral Inflow groundwater and tributaries
9Water Losses
Evaporation
Stream Segment
Groundwater Seepage
outflow
10Autochthonous Allochthonous
11(No Transcript)
12Fisher and Likens 1973
13(No Transcript)
14(No Transcript)
15OUTFLOW
INFLOW
16Traditional view of a nutrient cycle
biotic
abiotic
17dissolved
particulate
18FLOW
19Spiraling Length
Sw
SB
FLOW
R
U
20Biological Uptake by algae Immobilization by
bacteria and fungi Nutrient Transformations Abio
tic Coprecipitation Sorption Hydrologic
Storage (short-term)
21What Limits Primary Productivity
(P)? Light Nutrients Grazers Disturbance
(scouring floods) Competition (with microbes)
22What limits heterotrophic metabolism
(R)? Organic Matter inputs allochthonous autoch
thonous Organic Matter Quality conditioning vs.
original composition Organic Matter
losses speed of mechanical breakdown presence
of retention structures Nutrients
23(No Transcript)
24Bilby 1981
25- Measuring Nutrient Retention in Streams
- input-output budgets
- nutrient uptake length measurements
- isotopic nutrient tracers
26Inputs
Outputs
Outputs - Inputs Retention
27Fisher and Likens 1973
28Triska et al. 1984
29Meyer and Likens 1979
30Newbold et al. 1983
31Measuring Uptake Lengths
Nutrient
Distance from Addition Site
32Measuring Uptake Lengths
Nutrient
P Br
Distance from Addition Site
33Measuring Uptake Lengths
Conservative Tracer
Nutrient
P Br
Nonconservative Solute
Distance from Addition Site
34Measuring Uptake Lengths
slope k, 1/k Sw
Nutrient Tracer
P/Br
Distance from Addition Site
35FLOW
Uptake Velocity Vf (vd) / Sw
36FLOW
Uptake Rate (Q ) (Sw
w)
U
37Conservative Tracer Concentration
Injection Starts
Injection Ends
travel time
Time
38(No Transcript)
39Hall et al. 2002
Main channel
Side Pool
40Hall et al. 2002
41Greater contact time between water column and
sediments gt greater opportunity for uptake
42Grimm 1987
43Grimm 1987
44Dent and Grimm 2000
45Mulholland et al. 1985
46Meyer 1979
47Whole-stream manipulations
48Elwood et al. 1981
49Peterson et al. 1985
Added 10?g/L
50(No Transcript)
51Scaling Up -- moving out from the reach
perspective
Longitudinal Surveys Regional Models
52Dent and Grimm 2000
53(No Transcript)