Title: Analyze This
1Analyze This!
- Col Michael Vidal
- F-16 System Support Manager
- DSN 777-5873
- Michael.Vidal_at_hill.af.mil
2Overview
- Improved A/C Availability Initiatives
- F-16 TNMCM
- F-16 TNMCS
- F-16 Engineering Dispositions
3Improved A/C Availability Initiative(An
Enterprise Approach to Sustainment Transformation)
Improve F-16 availability to the Warfighter
O G D E N A I R L O G I S T I C S C E N T E
R
Goal 986 A/C by Jan 05
4F-16 TNMCM Process
- Review current and historical status hours
- Analyze maintenance documentation
- Looking for factors SPO can influence
Note Phase inspections removed, Total (M) hours
- Aug 04 29,277
5F-16 TNMCM Issues
- Top drivers coded to system level
- Component level desired
- Drives exhaustive manual
- Research
- Not updating upon status change
6F-16 TNMCMImprovement Initiative
- Fuel leaks- wing attach fittings
- Sealant failure around Davis Elliptical Nuts
- Damage fracture critical component
- Significant maintenance hours
- Sealant cure times
- Improved Design
- Cold expanded Tukloc Fasteners
- Greater strength
- No sealant
Davis Elliptical Press Nut
Tukloc Fastener
7F-16 TNMCS Process
- Review current and historical hours
- Identify components
- Evaluate other key drivers
- Engage item managers
- Analyze process issues
Note Phase inspections removed, Total (S) hours
Aug 04 14,526
8F-16 TNMCS Issues
- Top drivers coded to system level
- MICAP and supply drivers may not match
9F-16 TNMCSImprovement Initiative
- Programmable Signal Processor memory cards
power supply - PSP MTBF 154 hours
- Cards drew negative voltage, drove power supply
failures - Insufficient memory
- Improved Design
- New, higher capacity cards and power supply
- Block 30 40 now common
- MTBF 230 hours
- Significant cost reduction
10F-16 Depot Process Status
- Review BQ hours
- Compare to F-16 Structural Repair Site
- Map process
- Value stream process
- Identify improvement candidates
BQ Awaiting AFMC Decision/Action
11F-16 Depot Possession Issues
- Top 22 BQ aircraft 3028 hours
- 66 of FY03 hours
- 4 of aircraft
- 121 days awaiting disposition (4)
- Median Response time
- 16 hours, 45 minutes
- Small improvement opportunity
- Refocus on depot repairs
12Improving Depot Process
- Review Top 10 monthly
- Attack resource issues
- Developing metric w/AETC
DJ Awaiting depot repair BU Repair in
progress (unit) DM Repair in progress (DFT) DO
Repair in progress (depot) TF Trainer aircraft
13F-16 Aircraft Availability
14Summary
- OO-ALC and F-16 SPO committed to improving
aircraft availability - Need help with quality of data
QUESTIONS?