Title: Commanders Guidebook Appendix C
1Commanders Guidebook Appendix C
- TRW Template...2
- Current Readiness VTC Template 22
- MAERB Mini Brief template .. 35
- NAE Board of directors Briefing Rules of
Engagement..... 40
2 CH-53DT/M/STRW Brief
SAMPLE
- TYCOM READINESS WORKSHOP
- Date
- Colonel Malavet MAG-24
- CAPT Muldoon PMA -261
3Mission Statement/Inventory
- Support the MAGTF Commander by providing assault
support transport of combat troops, supplies, and
equipment, day or night under all weather
conditions during expeditionary, joint, or
combined operations. - Core Capable Squadron (10 Aircraft)
- Able to sustain 17 sorties 1.5 hr (or 25.5 hrs a
day) during contingency/combat operations with
FMC gt70 with 90 TO (170 Marines-23
Pilots/20CrewChiefs/14 AOs). - 720 hrs per month
- 3 Tactical Squadrons, 1 MALS (60 USN)
- 10 aircraft currently deployed to Okinawa.
- UDP WESTPAC HMH-463 in Jan 08
- OIF HMH-363 in Aug 08
- 34 Total Aircraft
- Source NAVMC DIRECTIVE 3500.89 CH-53 Training
and Readiness Manual
4 Aircraft SDLM Kimhae, ROC
20 Aircraft MCBH Kanehoe Bay, HI
10 Aircraft Okinawa
4USMC Top Five
ALERTS
Use callouts to highlight issues
This chart will be populated using ACES
MAINTAINER CORE COMPETENCY
AIRCREW CORE COMPETENCY
FW
AFM
AVDLR
SPI1.07 CPI1.10
FUEL
COST PERFORMANCE
AIRCRAFT LIFE MANAGEMENT
RFT SETS
5T/M/S CWRIIP SLIDE
Short Term AIPs
RFT Gap Sep07 5.9 A/C
CWRIIP SLIDES WILL BE IN ALL BRIEFS REQUIRES PMA
INPUT
Example Slide
Required Slide
6Aircrew Training CpC
Chart captures raw Core Skills data
Must add appropriate forecast line to all charts
7Aircraft Systems CpC
Need further guidance of this template as the top
5 panel chart has changed
Side panels should represent Mission Sets
identified by T/M/S team for RFT Sets
Required Slide
8CH-53D RFT Gap Analysis
- Root Causes
- Flight Line Actual Deficit 4 ACFT
- Depot WIP 8 ACFT
- 3 ACFT HMH-362
- 1 ACFT HMH-363
- 4 ACFT HMH-463
- RBA Deficit7.5 ACFT
- NMC WIP 5 ACFT
- 1 ACFT HMH-362 0 NMCM/ 1 NMCS
- 3 ACFT HMH-363 1 NMCM/ 2 NMCS
- 1 ACFT HMH-463 0 NMCM/ 1 NMCS
- 6 ACFT MC/NRBA
-
- AIPs
- Flight Line Deficit Examining Depot/UDP
shipping issues to determine efficient and cost
effective transport of ACFT. We are constantly
dealing with the tyrannies of time and distance
when it comes to the transport of ACFT anywhere
in the world. - RBA Deficit Same as Flight Line Deficit.
- Mission Systems Deficit None at this time.
- RFT Gap Projection OIF aircraft build up. UDP
aircraft broken down for C-5 movement to Okinawa.
RFT gap will close for Jan and Feb 08 and will
increase by 5 aircraft during the month of Mar 08
ISO WTI. - Assistance Required None at this time.
9MSCM CpC
Under development
Required Slide
10Maintainer Core Competency
Required Slide
11MAG-24 Cost Charts
CPI 1.20 Plan 6M EV 6.7M Actual 5.5M
Target 6,303 FYTD 5,256
Plan 4.3M FYTD 3.5M
ACES is the authoritative data source
Plan 1.2M FYTD 1.5M
Plan 951Hrs FYTD 1,054 Hrs
FYTD Variance 1.1M
Plan 564K FYTD 550K
12Focus Areas
- Marine Top Five
- ACC- On track, recovering from OIF deployments
- Maintenance Manning- Sufficient
- Cost within budget for FY-08
- RFT SETS- Major impact C-5 Transportation ISO of
operations. - SDLM inductions
- IMRL
- Main Rotor Head Dampers
- Aircrew Life Management- No issues.
13SDLM Inductions
- Current CH-53D depot maintenance conducted under
ASPA/SDLM program. - Limited airframes coupled with increased
utilization and fleet demand makes this program
inefficient. - CH-53D needs to transition to a Depot fixed
induction date (FID) in order to level load depot
events across the aircraft inventory to meet RFT
requirements. - No assistance required at this time from TRW.
14IMRL
- Squadron IMRL employment will change in FY-11 to
support 2 X 16 squadrons. - Current IMRL supports 2 X 10 and 2X 5 (4 bags)
- IMRL accounts need to grow to support a 8 4
4 for 2 squadrons (6 bags). - Funding requested, not yet identified.
15Main Rotor Dampers
- Main Rotor Head Damper demand higher than
historical usage resulting in supply shortages. - BRT formed and working the issue.
- All flightline aircraft requisitions filled.
Supply shelves bare.
16Summary
- Current Marine AVPLAN has the CH-53D in the
inventory through 2017 - We need to continue to maneuver, shoot, and
communicate in order to provide viable assault
support to our customer the infantry. - The T/M/S team will focus its efforts to support
this legacy platform well into the next decade. - The T/M/S Summary slide should wrap up the
story into a bullet list of gaps/issues the
T/M/S is asking for help with or would like to
offer to CNAF as solutions to possible fleet-wide
issues.
17BACKUP SLIDES
18T/M/S Team Members
- MAG 24 CO XXXXXXXX
- PMA 261 XXXXXXXX
- PMA 261 APML XXXXXXXX
- MALS 24 CO XXXXXXXX
- MALS 24 AMO XXXXXXXX
- MALS 24 SupO XXXXXXXX
- MALS 24 Class Desk XXXXXXXX
- MAG 24 OPSO XXXXXXXX
- MAG 24 Analyst XXXXXXXX
- DLA XXXXXXXX
- NAVICP XXXXXXXX
- Class Desk (CNAF) XXXXXXXX
- Class Desk (CNAF) XXXXXXXX
- FST Rep XXXXXXXX
- Thomas Group XXXXXXXX
- APW-51 XXXXXXXX
19TRW Overview
- The TRW (as with all NAE briefs) should represent
a coherent story. Observed gaps in performance
should be tied to root causes. An effective
T/M/S team will blend the efforts of the
Typewing/MAG, PMA, IWST and FRC to identify and
resolve gaps and issues. - The TRW is the first vehicle for
Type/Model/Series (T/M/S) Team to publicly
present Key Performance Indicators (KPIs),
associated documentation, and T/M/S initiatives
supporting the Naval Aviation Enterprise
readiness and efficiency goals. - The TRW is hosted by the CNAL N01R, N42 and N40.
In the case of USMC specific TRWs, the host will
be designated by the Marine Aviation Executive
Readiness Board (MAERB) lead. USMC TRWs will
normally precede the MAERB by one to four weeks.
- The TRW is a metrics-driven working group
established to conduct specific root cause
analysis and gap closure planning based on a
review of T/M/S cockpit charts and other
supporting documentation. - The TRW provides the opportunity to the T/M/S to
gain valuable feedback and direction from the
Current Readiness Staff, the Readiness Standards
Policy (RSP) and Maintenance Supply Chain
Management (MSCM) Teams for the preparation of
the Progress Assessment Report (PAR) brief.
Admin Slide
20TRW Overview
- The TRW discussion should begin with
identification of gaps between entitled and
actual performance in the T/M/S specific KPIs
(Big Four/Five). After identifying gaps, the
T/M/S shall present the supporting cockpit charts
in order to drill down into and describe root
causes, identify gap closure activity and propose
barrier escalation. Root cause analysis and gap
closure activity should focus on four specific
areas - Readiness accomplishment as it applies to
aircrew, aircrew training and training sorties. - Readiness accomplishment as it applies to RFT
aircraft sets. - Readiness accomplishment as it applies to
maintenance manpower - Cost.
- Aircraft Utilization (USMC)
- The TRW should be conducted with the following
goals in mind - Identify gaps to overall readiness, training
readiness, aircraft RFT, maintenance manpower and
cost entitlements. - Present root cause analysis to provide a
quantifiable link between gaps and the barriers
to closing those gaps. - Rank order and prioritize equipment readiness
barriers by readiness and cost impact using the
CWRIIP reporting format. - Provide information with regard to T/M/S program
costs that relate to RFT improvement, i.e. PRE"
(Program Related Engineering), "PRL" (Program
Related Logistics), and APN-5, etc. - Develop/review action plans for eliminating the
barriers including cost impact analysis.
Admin Slide
21TRW Overview
- The T/M/S should be prepared to ask for
assistance/coordination with issues that are
beyond their control or require action on the
part of the TYCOM, NAVAIR, NAVICP, OPNAV N43, or
other headquarters activities. - Issues raised by the T/M/S will be assigned as
Actions in Progress (AIP). These issues will
normally be escalated to the CR CFT. - It may not be possible to brief completed root
cause analysis in every case. If not - Develop clear way ahead.
- Assign responsibilities and timeline.
Admin Slide
22 CH-53DT/M/SCR VTC Brief
SAMPLE
- TYCOM READINESS WORKSHOP
- Date
- Colonel Malavet MAG-24
- CAPT Muldoon PMA -261
23Mission Statement/Inventory
- Support the MAGTF Commander by providing assault
support transport of combat troops, supplies, and
equipment, day or night under all weather
conditions during expeditionary, joint, or
combined operations. - Core Capable Squadron (10 Aircraft)
- Able to sustain 17 sorties 1.5 hr (or 25.5 hrs a
day) during contingency/combat operations with
FMC gt70 with 90 TO (170 Marines-23
Pilots/20CrewChiefs/14 AOs). - 720 hrs per month
- 3 Tactical Squadrons, 1 MALS (60 USN)
- 10 aircraft currently deployed to Okinawa.
- UDP WESTPAC HMH-463 in Jan 08
- OIF HMH-363 in Aug 08
- 34 Total Aircraft
- Source NAVMC DIRECTIVE 3500.89 CH-53 Training
and Readiness Manual
4 Aircraft SDLM Kimhae, ROC
20 Aircraft MCBH Kanehoe Bay, HI
10 Aircraft Okinawa
24USMC Top Five
ALERTS
Use callouts to highlight issues
This chart will be populated using ACES
MAINTAINER CORE COMPETENCY
AIRCREW CORE COMPETENCY
FW
AFM
AVDLR
SPI1.07 CPI1.10
FUEL
COST PERFORMANCE
AIRCRAFT LIFE MANAGEMENT
RFT SETS
25CH-53D RFT Gap Analysis
- Root Causes
- Flight Line Actual Deficit 4 ACFT
- Depot WIP 8 ACFT
- 3 ACFT HMH-362
- 1 ACFT HMH-363
- 4 ACFT HMH-463
- RBA Deficit7.5 ACFT
- NMC WIP 5 ACFT
- 1 ACFT HMH-362 0 NMCM/ 1 NMCS
- 3 ACFT HMH-363 1 NMCM/ 2 NMCS
- 1 ACFT HMH-463 0 NMCM/ 1 NMCS
- 6 ACFT MC/NRBA
-
- AIPs
- Flight Line Deficit Examining Depot/UDP
shipping issues to determine efficient and cost
effective transport of ACFT. We are constantly
dealing with the tyrannies of time and distance
when it comes to the transport of ACFT anywhere
in the world. - RBA Deficit Same as Flight Line Deficit.
- Mission Systems Deficit None at this time.
- RFT Gap Projection OIF aircraft build up. UDP
aircraft broken down for C-5 movement to Okinawa.
RFT gap will close for Jan and Feb 08 and will
increase by 5 aircraft during the month of Mar 08
ISO WTI. - Assistance Required None at this time.
26T/M/S CWRIIP SLIDE
Short Term AIPs
RFT Gap Sep07 5.9 A/C
CWRIIP SLIDES WILL BE IN ALL BRIEFS REQUIRES PMA
INPUT
Example Slide
Required Slide
27MAG-24 Cost Charts
CPI 1.20 Plan 6M EV 6.7M Actual 5.5M
Target 6,303 FYTD 5,256
Plan 4.3M FYTD 3.5M
ACES is the authoritative data source
Plan 1.2M FYTD 1.5M
Plan 951Hrs FYTD 1,054 Hrs
FYTD Variance 1.1M
Plan 564K FYTD 550K
28Focus Areas
- Marine Top Five
- ACC- On track, recovering from OIF deployments
- Maintenance Manning- Sufficient
- Cost within budget for FY-08
- RFT SETS- Major impact C-5 Transportation ISO of
operations. - SDLM inductions
- IMRL
- Main Rotor Head Dampers
- Aircrew Life Management- No issues.
29SDLM Inductions
- Current CH-53D depot maintenance conducted under
ASPA/SDLM program. - Limited airframes coupled with increased
utilization and fleet demand makes this program
inefficient. - CH-53D needs to transition to a Depot fixed
induction date (FID) in order to level load depot
events across the aircraft inventory to meet RFT
requirements. - No assistance required at this time from TRW.
30IMRL
- Squadron IMRL employment will change in FY-11 to
support 2 X 16 squadrons. - Current IMRL supports 2 X 10 and 2X 5 (4 bags)
- IMRL accounts need to grow to support a 8 4
4 for 2 squadrons (6 bags). - Funding requested, not yet identified.
- No assistance required at this time from TRW.
31Main Rotor Dampers
- Main Rotor Head Damper demand higher than
historical usage resulting in supply shortages. - BRT formed and working the issue.
- All flightline aircraft requisitions filled.
Supply shelves bare. - No assistance required at this time from TRW.
32Summary
- Current Marine AVPLAN has the CH-53D in the
inventory through 2017 - We need to continue to maneuver, shoot, and
communicate in order to provide viable assault
support to our customer the infantry. - The T/M/S team will focus its efforts to support
this legacy platform well into the next decade. - The T/M/S Summary slide should wrap up the
story into a bullet list of gaps/issues the
T/M/S is asking for help with or would like to
offer to CNAF as solutions to possible fleet-wide
issues.
33BACKUP SLIDES
34T/M/S Team Members
- MAG 24 CO XXXXXXXX
- PMA 261 XXXXXXXX
- PMA 261 APML XXXXXXXX
- MALS 24 CO XXXXXXXX
- MALS 24 AMO XXXXXXXX
- MALS 24 SupO XXXXXXXX
- MALS 24 Class Desk XXXXXXXX
- MAG 24 OPSO XXXXXXXX
- MAG 24 Analyst XXXXXXXX
- DLA XXXXXXXX
- NAVICP XXXXXXXX
- Class Desk (CNAF) XXXXXXXX
- Class Desk (CNAF) XXXXXXXX
- FST Rep XXXXXXXX
- Thomas Group XXXXXXXX
- APW-51 XXXXXXXX
35USMC EA-6B Issues and Actions
- Marine Top Five
- ACC Optempo Focus on PTP req Single-site
deployment - ALERTS L4 centered on select MOS deficiencies
- Cost Below CPH tgt for FY-08
- Aircraft Availability Historical RBA No RFT
based data (awaiting AMSRR re-code) - Aircraft Life Management Tracking A/C currently
designated to meet USMC
sundown plan
36T/M/S Monthly Update to MAERB
AIRCREW CORE COMPETENCY
MAINTAINER CORE COMPETENCY
AIRCRAFT LIFE MANAGEMENT
COST
For A/C to meet USMC Sundown Plan
Target CPH 7,592 Actual CPH 5,859 Delta
1,733 Pct 22.83
ECMO ES
Pilot OAS
AIRCRAFT AVAILABILITY
ECMO OAS
Pilot DEFTAC
ECMO DEFTAC
No RFT based data
37T/M/S Monthly Update to MAERB
AIRCREW CORE COMPETENCY
MAINTAINER CORE COMPETENCY
AIRCRAFT LIFE MANAGEMENT
COST
For A/C to meet USMC Sundown Plan
Target CPH 7,592 Actual CPH 5,859 Delta
1,733 Pct 22.83
Inspectors
AIRCRAFT AVAILABILITY
MATMEP
No RFT based data
38T/M/S Monthly Update to MAERB
AIRCREW CORE COMPETENCY
MAINTAINER CORE COMPETENCY
AIRCRAFT LIFE MANAGEMENT
COST
For A/C to meet USMC Sundown Plan
Target CPH 7,592 Actual CPH 5,859 Delta
1,733 Pct 22.83
Aircraft WIP (DEPOT/NMC)
AIRCRAFT AVAILABILITY
- Root Causes
- Flight Line Deficit
- 5 PMI-1
- 1 PMI-3
- 1 PMI-1 and 1 Block I Mod Completed during
month. - RBA Deficit (6 month Avg)
- Avionics 3.00, Flt Ctls 1.39, Structures 1.29.
Landing Gear 1.08, Power Plant Install 1.00, Seat
Components .94, ECS .72, Lighting .67,
Inspections .57, Engine .59 - Mission Systems Deficit TBD
No RFT based data
39T/M/S CR Actions In Progress
- Key Briefing Takeaways
- Issue AMSRR Recode req for RFT based data
reporting - ACC Impact of optempo/RFF/deployment
cycle/focus on PTP reqs
Reduce impact by maximizing full sqdn support
of WTI aircrew participation in
LFEs when able -
- Way Ahead
- Apr/May begin RFT based data reporting
- Joined established BRTs (PMI Ldg Gear)
- Finalize Common RFT based MESM (Mar)
- Coordinate with T/M/S as issues surface with RFT
based data reporting
40 41Background
- Air Boss requested assessment of BoD VTC as forum
to stimulate more discussion and actions - VTC intent unique forum for operators,
constituents, and stakeholders to engage in
dialogue with core leadership to address - VTC purpose / outcomes
42BoD VTC Issues
- Issue 1 The briefers desire to inform and the
length of briefs provided limit opportunities for
NAE leadership to influence or shape outcomes of
discussion - Recommendation Provide briefer ROE to reshape
briefs - Issue 2 VTC time is limited. Insufficient
opportunity to address and influence NAE areas of
interest. - Recommendation Create stable BoD VTC topic
schedule
43Issue 1 Briefer ROE
- Core BoD is audience. Allow sufficient time for
BoD discussion. - Wording must be concise, targeted, and meaningful
- TMS/PMA briefs should be a maximum of 10-15
slides. Specific guidelines - First and final slide should be labeled Issues
and Actions - Overview of all aircraft inventory and their
locations - TMS or Pipeline Big X
- TMS CWRIIP
- Gap analysis/drivers
- Articulate salient trends for data and gap
drivers - Month-to-month, year-over-year for cycles
- Verbalize trends as favorable/unfavorable vice
up/down or /- - Clearly state where and when
- Seeking BoD approval
- Discussion for issues desired
- Identifying path forward actions
44Issue 1 Briefer ROE
- Issues and Actions slide as lead-off for the
brief - To present a mini-read ahead for the information
and issues that will be discussed throughout the
brief (particularly the gap analysis/issues
section) - To provide the audience with advance notice of
request for assistance - Issues and Actions slide as conclusion for the
brief - To present key takeaways (when no action is being
requested) - To present action items when the TMS is asking
for help or would like to offer to the NAE/CNAF
solutions to possible fleet-wide issues - Action item assignment is recommended by the
briefer, approved by the BoD - Proposed cognizant organizations are routinely a
CFT or sub-team of a CFT. The intent is to
remain within the NAE construct - Stoplights are not required, but provide a good
representation of the importance of the issue
45Issue 1 Briefer ROE
No Action Required Example
Action Required Example
46Issue 2 BoD Schedule
- Twelve monthly VTCs 2 hrs each gt 24 hrs per
year - Must maximize this 1.15 of available working
hours - Common every month
- AIP review, TMS brief and CR CFT brief 50
minutes of 2 hour block - Recognition / Best Practices (every month as
topics are made known) - Notional Schedule
47Engagement ROE
- For Flag / General Officer consideration
- Challenge presentation
- Ask hard questions
- Question data particularly where not supported
- Engage on decision points assign action and
timeline - Direct updates / status reports off drumbeat to
drive action - Specify form of response (e.g., email to N00, BoD
brief, etc.) - Question alignment of effort to strategic plan
- Offer assistance
- Reward / acknowledge performance and results
- Ex Coin, kudos, website recognition, message
traffic, email follow-up
48Conclusion
- Summary
- Briefer ROE and engagement issues promote
discussion and actions - Stable topic structure allows for other NAE areas
of concern to be shaped and influenced - Provided for discussion