1st Installation and Commissioning Workshop

About This Presentation
Title:

1st Installation and Commissioning Workshop

Description:

6 October 2006. Borge S. Nielsen, Niels Bohr Institute ... NBI: - cables on absorber and service chariot - all cable connectors - full cable testing ... –

Number of Views:24
Avg rating:3.0/5.0
Slides: 14
Provided by: rieg8
Category:

less

Transcript and Presenter's Notes

Title: 1st Installation and Commissioning Workshop


1
1st Installation and Commissioning Workshop
Forward Multiplicity Detector (FMD)
2
Forward Multiplicity Detector (FMD)
ITS
Outer ring
Inner ring
FMD 3
FMD 1
FMD 2
3
Detector elements
Muon absorber cabling
Final Inner Digitizer
Final FMD3 cone with beam pipe support
Complete module (outer type)
Cone assembly test
4
System tests already done
Mechanical assembly with models at CERN
Beam tests with gt5000 active channels and 2
digitizer cards 1 RCUDATE
Full read-out tests with DigitizerRCUDATE
5
Pre-commissioning
  • Pre-commissioning plans prior to installation
  • _at_NBI - assemble complete detectors (FMD3
    FMD2, then FMD1)
  • - complete test with RCU, DDL, DATE,
    TTC/LTU, cooling
  • (but not final CAEN LV and HV)
  • - basic DCS panels, tested on simulated
    CAEN and real RCU/DCS card
  • _at_CERN (Jan-Feb 2007)
  • - retest as above, but with final CAEN
    power supplies
  • Status of pre-commissioning (_at_NBI)
  • - FMD3 mechanics ready, FMD2 starting
    production
  • - all detector modules in house
  • - TTC/LTU being set up
  • - cooling plates in production
  • - DCS work starting
  • - complete read-out working

6
Electronics Racks
  • Locations of racks in the cavern drawings of
    rack content including rack patch-panels and
    possible communication lines between racks and
    entry point of cables (top, bottom ?)
  • - Rack O13 contains one EASY 3000 crate
    with 48 V power supply etc
  • one patch panel to distribute the LV cables
    from 10 digitizers and 3 RCUs to 4 low
    voltage modules
  • - Rack X06 contains one SY1527 crate
  • one patch panel to distribute the HV cables
    from 70 modules
  • and 6 high voltage modules
  • Schedule for arrival of electronics and
    individual rack components at CERN.
  • - Power supply crates hopefully early 2007
  • - Power supply modules before August 2007
    delivery schedule unknown
  • - Patch panels to be mounted together with
    cable connectors
  • Electronics commissioning
  • - Power supplies to be installed and
    commissioned together with FMD3

7
Detector Arrival _at_ CERN
  • Installation dates FMD3 16-20 February 2007
  • FMD2 07 March 2007
  • FMD1 03-05 July 2007
  • When will the detector arrive at CERN ?
  • - before mid January 2007 (FMD3 and FMD2, FMD1
    later)
  • What are the dimensions of the transport cradle
    that must be brought to the place of
    installation ? How will it be brought there?
  • - 2 times 1x1x1 m3 by car
  • How many people will participate in the
    installation ?
  • - 6-8 people (physicists and technicians)
  • How many days before installation will the team
    arrive ?
  • - early-mid January for lab. test 3-4 people
  • - for installation above 3-4 people

8
Cables Patch panels
  • Status of cable, fibre and connector ordering.
  • - C side cables on absorber done, remaining
    defined
  • but cables not pulled. Fibres not pulled.
  • - A side defined, but missing final cable
    lengths and final patch panel designs.
  • Plans for cabling, connector and cable testing
    activity by subgroup.
  • - NBI - cables on absorber and service
    chariot
  • - all cable connectors
  • - full cable testing
  • - CERN - pull long cables and all fibres
  • Needed patch panels and status of patch panels.
  • - Still to be done panels on A side (PP2, PP1,
    PP0)
  • panels in racks (LV and HV distributions)

9
Installation (1)
  • Minimum status of services at start of
    installation.
  • - all cables and fibres ready and tested
  • - LTU/TTC running
  • - DAQ running
  • - CAEN HV and EASY LV crates and some modules
    delivered
  • - preferably cooling water from TPC heat screen
    system
  • Installation tooling provided by the subdetector
    group.
  • - support for cones during assembly
  • Other Infrastructure needed.
  • - full ITS installation infrastructure
  • Installation scenario day by day.
  • - Before installation date install and cable
    RCU modules
  • - FMD3 3 days mechanical installation, then
    complete test
  • - FMD2 1 day mechanical installation
  • 1 day (12/03/2007) set aside for complete
    test after the cable hook-up

10
Installation (2)
  • Tests and verifications during installation for
    cables, fibers and cooling lines.
  • - cables etc should be tested before
    installation
  • - FMD3 should be verified through to the racks
    and counting rooms (with DCS and DAQ)
  • - FMD2 cannot be cabled until TPC is in place
  • ideally detector should be tested with the
    commissioning electronics
  • Not clear what is possible with temporary
    cabling, power etc.
  • Alignment requirements
  • - assured at required precision by ITS
    installation scenario

11
Commissioning summary (1)
At NBI
  • Test all detector modules at NBI.
  • Results stored in systematic fashion. Make list
    of repairs, send modules to CERN.
  • Pre-assembly at NBI
  • Cables
  • Shielding (HF and light)
  • Cooling
  • Mechanical fit. Detectors, Honeycomb, Digitizer,
    beam tube support.
  • Noise tests
  • RO system w. 2 branches
  • Calibration pulse test
  • DCS control software
  • Monitor software, test and calibration scripts.
  • Check safety procedures (leakage current, auto
    shut off at beam injections, etc)
  • Final e-beam test at Aarhus data taken 4-5
    November
  • Test inner and outer digitizers with. inner and
    outer detectors.
  • S/N systematics
  • Rate dependence
  • System stability
  • Limitations at NBI

12
Commissioning summary (2)
At CERN
  • Detector operation at CERN in Lab. conditions
    similar to NBI lab.
  • (Re-) Assemble detector system after transport
  • Connect detectors to LV, HV, and self-generated
    trigger
  • Run with stand-alone DAQ
  • Operate system in lab. Measure noise, stability
    and rate
  • Detector operation at CERN in Lab. conditions
    similar to ALICE.
  • Connect detectors to real LV, HV, and trigger
  • Establish DCS control of hardware
  • Run with real external trigger (LTU/TTC) and
    real ALICE DAQ
  • Operate system in lab. Measure noise, stability
    and rate
  • Calibration and Control procedures
  • Exercise scripts to calibrate (pedestals, gain)
    and operate detector (start/stop/reset/load)
  • Exercise first monitor programs
  • Check stability and rate performance
  • Check safety procedures (leakage current, auto
    shut off at beam injections, etc)
  • Preparation in ALICE (in pit) prior to
    installation
  • Verify all cables/connectors (long cables and
    local (PP-to detector) cables)
  • Availability of trigger signal
  • Availability of real HV, LV - LV situation
    problematic due to CAEN delivery schedule

13
Commissioning summary (3)
At CERN post installation
  • Detector operation in ALICE.
  • Connect detectors to real LV, HV, and trigger
  • Establish DCS control of final hardware
  • Run with real external trigger (TTC) and real
    ALICE DAQ
  • Operate system in ALICE. Measure noise and
    stability.
  • Calibration and Control procedures
  • Exercise scripts to calibrate (pedestals, gain)
    and operate detector (start/stop/reset/load)
  • Exercise first monitor programs
  • Check stability and rate performance