Title: PDO CEO HSE Conference
1PDO CEO HSE Conference
2AL HASSAN ENGINEERING Co. S.A.O.G.Stopping the
Pain
-
- How can CEOs help to reduce
- the suffering and Pain within
- our Community ?
- Presentation by Mr Hassan Ali Salman
- CEO, Al-Hassan Group of Companies, Oman
3Fatalities in 2001
Fatalities in 2000
Soud Al-Dughary
Saeed Yasser Al-Bathary
Leith Bahakur
Maqbool Abdul Rasool Al-Zadjali
Khalfan Mubarak Al Omeiry
Faisal Qasim Abdul Rahim Al-Balushi
Hafidh Mohamed Al Balushi
Simon Arimangalath F. N. Samuel
Kasab Aamir Saleem Al Junaibi
Salim Khila Musallam Al-Junaibi
Tek Bahadur
Aslam Dalvi
Malik Mohd Solemn
Hamad Salim Hamad Al-Duri
Bolisetti Gupta
Nasser Saif Al Habsi
Fatalities in 2002 Abdullah Salem Al
Hilali Mohd Rushed Hussein Abdullah
Solemn (Non-work) Bell Khalfan Saad al Hosni
(Non-work)
Al Abd Hamed Al Duree
Tariq Mahmoud Mohd Sadiq
Suresh Kumar
Mohammed Saleem
24 People in the last 2yrs Can we STOP
this cycle of fatalities?
4Safety Performance (2000 - 2002)
5What went well in 2002 ?
- Reduction in number of Roll-overs
- Reduction in LTIs from RTAs
- Involvement of CEOs (Joint Management
Inspections) - Introduction of 2-level Incident Review Scheme
- Enhancement of HSE Awareness through ESSW
- Working Safely Workshop for workforce
- Enhancement of Competence of HSE Advisors through
Propulsion Project.
6What did not go well ?
- 2 Fatalities, plus another 2 non-work related
- Increase in LTIs, 50 being Finger Injuries
- Increase in Total Recordable Cases
- Inadequate implementation of STOP
- Disruption of HSE training by the third party
training Institutes - Discontinuation of Qarn Alam HSE Pressure Group
Meetings.
7How can we reinforce our Strength ?
- Install Safety Posters along Interior Roads
- Install Speed-Detection Radar System
- Coastal Road Safety Awareness (Signals Junction)
- Speed breakers at TEE-junctions
- Finger Saving Campaign
- CEOs to Visit and spend evening (Barbecue) with
the workforce which include a night stay in
interior (incentive scheme PDO/OPAL/MOG). - Safety Message cassettes
8Areas of Weakness requiring Improvement?
- CEOs to participate in Finger Saving campaign
in the interior - Continue Joint Management Facility Inspection
- Enforce Enhanced Site Supervision workshop for
all levels - Effective Implementation of STOP Programme.
- CEOs to attend No-LTI Club functions in interior
(along with overnight stay)
9Conclusions
- Concerted and sustained efforts by CEOs required
to improve HSE performance, - Implement agreed action items from CEO HSE
Conference. - Safety never rests because danger never
sleeps(Slogan)