Title: Strategic Planning for NTPs


1
Strategic Planning for NTPs
  • EMRO NTP Managers Meeting 2004
  • Holger Sawert

2
TB budget data 2003
3
Making a plan a general framework
GOALS
4
The general framework in TB control
  • Goal
  • Eliminate TB as a public health problem
  • Objectives
  • Detect and cure cases
  • Products
  • DOTS
  • Activities/Process
  • Training, supervision, supply of drugs/reagents
    etc
  • Inputs
  • staff, equipment, drugs, reagents etc.

5
Stages of NTP development
6
Determining the program stage
7
DOTS and Beyond DOTS
  • Most NTPs are in stage I or stage II, i.e., cure
    rate is below 85, detection below 70
  • For these programs, ensuring quality
    implementation of the five DOTS components is the
    absolute priority
  • Quality DOTS will ensure high cure rates and may
    also be sufficient to achieve high case detection

8
TB Control The 5 components of DOTS
  • Political commitment
  • Diagnosis by microscopy
  • Adequate supply of SCC drugs
  • Directly observed treatment
  • Monitoring, Management

9
Setting the standards
  • Commitment
  • sufficient funding for all activities available
    at all levels
  • Diagnosis
  • labs well equipped, QA system in place
  • Drugs
  • drugs of good quality available at all centers at
    all times
  • DOT
  • all patients have appropriate supervisor
  • Quality
  • all training, supervision, monitoring according
    to guidelines
  • records complete, reports adequate and timely

10
Example of Task Analysis
11

The management cycle
Planning
12
Strategic evaluation
Goals achieved?
13
Indicators for strategic planning
  • Goals achieved?
  • Prevalence, mortality
  • Objectives achieved?
  • Cure rate, case detection rate
  • Planned activities and products produced?
  • Process indicators for DOTS components

14
Interaction planning and monitoring
GOALS
Process indicators
15
Process indicators for DOTS
  • Commitment
  • Proportion of total financial requirements met
  • Proportion of implementation units with adequate
    budget
  • Diagnosis
  • Proportion of units adequately equipped and
    supplied
  • Proportion of symptomatics examined with 3 smears
  • Proportion of units with adequate QA results
  • Drugs
  • Proportion of treatment units with stockouts
  • Proportion of drugs that concur to standard
    quality criteria
  • DOT
  • Proportion of cases receiving adequate DOT
  • Monitoring, development, management
  • Proportion of staff trained
  • Proportion of planned supervision and monitoring
    activities actually performed
  • Proportion of units with accurate, complete and
    timely reports

16
Example of a Problem Tree
17
Turning problems into actionable objectives
18
Actionable objectives
?
  • Increase cure rate!
  • Ensure uninterrupted
  • drug supply!
  • Design new drug
  • logistics system!

?
?
19
(No Transcript)
20
Thinking more deeply
Treatment centers not supervised
No money for per diems
NTP budget too low
21
Thinking more deeply
Ensure supervision
Provide per diems
Provide transport
Ensure staff availability
Buy cars/ Advocacy ?
Money from MOH/donors
Employ staff/ Advocacy ?
22

The management cycle
Planning buy drugs for 20,000 pts.
23
Interaction Planning, monitoring, problem
analysis
24
Obtaining actionable objectives
25
Strategic activities based on problem analysis
  • NTP can chose cheapest drug supplier
  • obtain drug price quotes from several suppliers
  • Advocacy to minister to allow alternative
    procurement
  • Central level warehouse available
  • construct new warehouse at central level
  • Regional warehouses functional
  • renovate warehouses at provincial level
  • National drug logistics system available
  • Hire consultant to design new drug logistic
    system
  • revise national training material to include new
    drug logistic system (print separate brochure?)
  • print and distribute new drug order forms
  • hold training course on drug logistics with
    PTCs/DTCs
  • include drug logistics in PTC supervision
    checklist

26

The management cycle
Planning
Buy drugs for 20,000 pts.
  • obtain drug price quotes from several suppliers
  • Advocacy to minister to allow alternative
    procurement
  • construct new warehouse at central level
  • renovate warehouses at provincial level
  • Hire consultant to design new drug logistic
    system
  • revise national training material to include new
    drug logistic system (print separate brochure?)
  • print and distribute new drug order forms
  • hold training course on drug logistics with
    PTCs/DTCs
  • include drug logistics in PTC supervision
    checklist

Drug procurement, distribution

Drug stockouts in 30 of all centers
No stockouts
27
Challenges
  • Making planning an important NTP activity
  • E.g., annual planning workshop with staff from
    peripheral levels, in time for MOH budget
    submission
  • Including process indicators in NTP monitoring
    system
  • WHO indicator manual
  • Little experience
  • Collect actionable data
  • Avoid data drowning

28
Group exercise
  • Each group to consider one DOTS component
  • Are there problems with this component?
  • Identify process indicators
  • Analyze problems with problem tree
  • Convert problem tree into activity tree
  • Do the same exercise for other DOTS components!