Title: INDIVIDUAL CONSTRUCTION SURVEY
1INDIVIDUAL CONSTRUCTION SURVEY
BOSNIA AND HERZEGOVINAREPUBLIKA
SRPSKAINSTITUTE OF STATISTICS
I C S
- Paris
- 23-25 January, 2006
2?d hoc Survey
- Purpose (objective) of the survey
- Unit of observation
- Sample
- Method of interviewing
- Resources
- Results of the survey
- Conclusions
3Purpose of the survey
- To check the estimates of the value of GVA part
that refers to individual construction of
buildings
4Objective of the survey
- To obtain data on the total cost of buildings,
structure of investments, structure of costs,
financial sources and similar
5Unit of observation
- Buildings in a chosen sample of enumeration areas
- Respondent
- Owner of the building or a person most familiar
with construction works on the building
6Reference period
- The survey included construction works started in
period 1996 - 2005, irrespective of the
completion date
7Sampling
Trebinje 6
Foca 6
Banja Luka 40
I. Sarajevo 16
Doboj 16
Bijeljina 16
8Interviewing
- Field work from 1st 10th September, 2005
- Direct interview with the respondent
- based on questionnaire
- Data entry application CSP-ro software
- Analysis SPSS statistical programme
9Buildings by type of construction works
10Buildings by the year of beginning works at the
building
11Duration of construction works
years
frequency
12Age of the building being repaired/reconstructed
or extended/enlarged
years
frequency
13New buildings by number of floors
14Useful floor area of one storey
15Total cost of the building
KM/m2
up to 200 KM/m2
1200.1 KM/m2 or more
1000.1-1200 KM/m2
400.1-600 KM/m2
200.1-400 KM/m2
600.1-800 KM/m2
800.1-1000 KM/m2
frequency
16Structure of the construction costs
17Construction costs
!
!
18Structure of financing
19Financial sources
!
20Structure of investments by year
21Investments in the first year
frequency
22Conclusions
- After the expansion in the period 2000-2002, a
number of buildings under construction is rapidly
decreasing - Building works last around 8 years
- Average useful floor area of one storey is around
62 m2, and most frequently buildings have ground
floors and one storey
23- The total planned cost of building 1 m2 is around
786 KM, of which the share of costs of material
is around 50, labour costs 30 and land, land
preparation and permits, projects and similar is
20 - During construction, the largest investments take
place in the first year, and make around 30 of
the total planned cost of building works. The
share of investments in each next year is 10 in
average.
24Application
- one storey 62m2 x 786 KM 48,732KM
- ground floor 50
24,366KM - total cost of the new building
73,098?? - investment in the first year 30 21,929??
25- Number of new buildings?
- Assumption number of new buildings 1,000
-
- 21,929?? x 1,000
21,929,000KM - all other construction 50
10,964,500?? - total investments in the first year
32,893,500KM
26- Discussion
- Comments
- Suggestions