FWD DETECTORS 17-09-2002 - PowerPoint PPT Presentation

About This Presentation
Title:

FWD DETECTORS 17-09-2002

Description:

09:00 Introduction, TDR and main issues ( JJG: 15') 09.15 News on beam line and integration. ... 11. Prototype test at RHIC/BRAHMS (late 2003- RHIC run IV) ... – PowerPoint PPT presentation

Number of Views:27
Avg rating:3.0/5.0
Slides: 8
Provided by: jensjrgen
Category:
Tags: detectors | fwd | brahms

less

Transcript and Presenter's Notes

Title: FWD DETECTORS 17-09-2002


1
FWD DETECTORS 17-09-2002
  • ALICE FORWARD DETECTORS  workshop. AGENDA
  • Tuesday, September 17th, 2002 at 09.00.
    40-R-C10
  • 0900 Introduction, TDR and main issues ( JJG
    15)
  • 09.15  News on beam line and integration.
    (Charles Gregory 20)
  • 09.35 Examples of Back End (BE) electronics in
    ALICE. (Luciano Musa 30).
  • 10.05 Greek DAQ effort in ALICE. (Martha
    Spyropoulou-Stassinaki 10)10.15 FMD status
    of industry contacts  and ideas for FE and BE
    electronics solution. (Borge Svane Nielsen 40) 
  • 11.00 Coffee 
  • 11.20 T0 update, development and integration (V.
    Grigoriev/V. Trzaska 40)
  • 12.00 V0 update, development and integration
    (Jean Yves Grossiord 30)
  • 12.30 Lunch 
  • 14.00  FMD simulations (Alla Maevskaia20)
  • 14.20  ITS, cables and cooling. Input to
    simulations (Bjoern Nielssen20) 
  • 14.40  Integration sequence (Luciano Simonetti
    20).
  • 15.00  ALICE DAQ, update and requirements for
    Forward detectors (Pierre van de Vyvre25)
  • 15.25  Summary discussion, and action items on
    integration with trigger, DAQ, Back End
    electronics, slow control, alignment and survey,
    etc., discussion on planning up to TDR. (JJG)
        

2
FMD progress plan
  • 1. Update, revise all simulations for actual
    geometry and beam pipe layout(started, in
    progress)
  • 2. Explore details of Si layout and manufacture
    details with companies(started, in progress)
  • 3. Explore in simulations consequence of ITS
    cabling. Not started yet, but now in principle
    possible to start after first ITS materials
    balance by P.L.Barberi.
  • 4. Once Si manufacture details and specs are
    clearer, return to IDEAS and fix more detailed
    specs for FE electronics (after summer 2002)
  • 5. Develop drawings for mounting of Si detectors
    onto interface agreed withITS (3rd cone etc...).
    Interface not yet fully agreed. Fall 2002
  • 6.Describe integration and installation sequence.
    Still far from clear. Hand in hand with ITS.

3
FMD
  • 7. Define cabling better. Must wait for next
    round of discussing with FE company.
  • 8. Move towards ordering of prototype Si and FE
    system. (fall 2002)
  • 9. Start work defining Back End (BE) electronics
    and interfacing withDAQ.We are missing people
    for this. Some discussion with 2 potential
    groups(Zagreb , Krakow) are in progress. Outcome
    unsure at this moment. (fall2002).
  • 10. First prototyping and test with e-beam.
    (early 2003).
  • 11. Prototype test at RHIC/BRAHMS (late 2003-
    RHIC run IV).I would believe that the time for
    a TDR is between items 9 and 10.
    Thisrealistically brings us into the late spring
    of 2003.

4
FWD detectors TDR status
  • - A draft (v1.3) of the FMD document was
    distributed at last ALICE week - next version
    will soon appear on our Web page.- A recent -
    not yet published - ALICE note on V0 will be
    forwarded toBSN.- The published ALICE note on
    T0 needs updating before it can be turnedinto a
    draft for the T0 TDR.- In the September ALICE
    week, we should have the next versions of
    3separate documents. Discuss the structure of
    the combineddocument.- The aim is to have a
    draft TDR in December 2002, and an edited draft
    inFebruary 2003.

5
Action items
  • Clarify installation issues between beam pipe,
    ITS and FMD by end of 2002.
  • F. Tosello to give an update on ITS services at
    September TB
  • F. Tosello and A. Morsch to update simulation
    input from ITS by autumn 2002
  • Seek common back end electronics solutions for
    FMD, VO, TO by autumn 2002.G.Stefanini involved.

6
(No Transcript)
7
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com