Title: The Expansion of the Black Mountain CrossCountry Ski Stadium


1
The Expansion of the Black Mountain Cross-Country
Ski Stadium
2
  • Team Members
  • Kourtney Tourigney
  • Phil Gagnon
  • Jeff Caron
  • Greg Norton
  • Niel Kasper

3
Summary of Project
  • Upgrades to Black Mountain will include
  • Conforming to International Skiing Federation
    (FIS) standards
  • Grade changes, cut/fill
  • Removal and relocation of buildings
  • Design and construction of pedestrian tunnel
  • Construction of retaining wall

4
The Stadium
CurrentLayout
Proposed Design
5
Design Criteria
  • FIS regulations
  • Lengths
  • Widths
  • Grade

6
(No Transcript)
7
Cross-Section of Lanes
8
(No Transcript)
9
Surveying courtesy of Professor Raymond Hintz
10
Survey Points, Contours, and Site Boundaries
11
AGTek Earthwork 3D
12
Existing Grade
946 ft
956 ft
978 ft
952 ft
938 ft
2 ft Contours
13
Proposed Design Grade
956 ft
946 ft
14
Level Grade
3 Slope
15
Level Grade
1 Slope
16
3
1
17
Tunnel Design
  • Pre-cast Concrete
  • From American Concrete
  • Benefits
  • Strength increases with time
  • Nontoxic, environmentally safe
  • Lasts a long time and will stay aesthetically
    pleasing
  • Easy to install
  • American Concrete is also treated with special
    high-quality sealants to offer a superior
    solution to water tightness

18
Boxcar Detail
19
Track Profile
Parking Lot
20
Pedestrian Tunnel within Retaining Wall
Precast or cast in place box culvert
12 ft
8 ft
Keystone units cut in half (typical)
Keystone standard unit
Via Keystone
21
Via Keystone
22
Via Keystone
23
Retaining Wall Profile
24
Cost Analysis
  • Stadium work
  • 15,000
  • Retaining Wall
  • 45,000
  • Tunnel
  • 72,000
  • Total cost including engineering fees
  • 160,000


25
Job Schedule
26
Thank You! Any Questions?