Front end Hybrid Industrial Tester - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Front end Hybrid Industrial Tester

Description:

Front end Hybrid Industrial Tester. UCL Louvain (L. Bonnet, V. Lema tre, X. Rouby) ... Berst, P. Graehling, P.Juillot, C. Maazouzi) Current measurements ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 11
Provided by: xro3
Category:

less

Transcript and Presenter's Notes

Title: Front end Hybrid Industrial Tester


1
Front end Hybrid Industrial Tester
UCL Louvain (L. Bonnet, V. Lemaître, X.
Rouby) vincent.lemaitre_at_fynu.ucl.ac.be
In collaboration with RWTH Aachen (M. Axer, F.
Beissel, T. Franke, J. Mnich) IRES Strasbourg
(JD. Berst, P. Graehling, P.Juillot, C. Maazouzi)
http//www.fynu.ucl.ac.be/themes/he/cms/activities
/tracker/hybrids.html
Vincent Lemaitre tracker week 29.01.03
2
Current measurements
Comparisons between FHIT ARC CMS-like
ARC
FHIT does not send triggers while measuring
current consumption whereas ARC and CMS-like
system do
FHIT
This problem is solved FEH needs more current
when triggered
3
Electrical Test limits
From statistics on FHIT measurements intervals
m-3s m3s where m is the mean of
distribution and s the RMS
These limits can be resized with a multiplicative
parameter, common for all limit values (available
in configuration file).
4
Functional Test limits
These are the ARCS parameter All these limits
are accessible in the configuration file
5
FHITS 1.3
New version 1.3 (updated interface, as asked by
industry)
  • Display the of good and bad hybrids of the
    current day
  • All part-numbers accepted 1663 ? 1674 (new
    firmware)

6
Conversion to XML
  • conversion to XML direct contact with CERN
    people to fit to their wishes
  • C routine being written in Louvain not
    necessary _at_ industry
  • proposed scenario
  • production and tests _at_ industry ( logfile
    creation )
  • delivery _at_ CERN of hybrids and logfiles (on
    CD-R)
  • 1 delivery FEH 1 CD ( copies)
  • tests _at_ CERN (with FHIT ? logfile creation)
  • creation of XML files (by running the C
    routine) _at_ CERN
  • transfer to database

7
Number of FHIT set-ups
8
Test procedure
S A M T E C
S A M T E C
N A I S
N A I S
E R N I
E R N I
FHIT
To be tested
Test setup
  • Industry 1 Naked hybrids (w/o APVs)
  • Industry 2 Hybrids
  • Before bonding pitch adapter ? LINK to DB (XML)

_at_ Industry _at_ CERN
9
Mechanics
New mechanics -Easier to handle -Insure
thermal contact (cooling) -Probe for test of
bias return line
Heavy cover with auto-retractile probe
Pad on hybrid for test of bias return line
Hybrid
Fine positioning plugs
Cooling contact
10
Summary
  • Difference between set-ups for Current
    Measurement is understood
  • First estimate of Limits for ET and FT have been
    evaluate (to be continued)
  • Most recent release of software distributed
    (FHITS 1.3) -improved display -all part number
    included (firmware)
  • Agreed procedure for loading FHIT data into DB
    (almost operational)
  • Proposal for the number of FHIT set up
  • Test procedure including thermal contact of
    hybrid and test of bias return line.