Title: Front end Hybrid Industrial Tester
1Front end Hybrid Industrial Tester
UCL Louvain (L. Bonnet, V. Lemaître, X.
Rouby) vincent.lemaitre_at_fynu.ucl.ac.be
In collaboration with RWTH Aachen (M. Axer, F.
Beissel, T. Franke, J. Mnich) IRES Strasbourg
(JD. Berst, P. Graehling, P.Juillot, C. Maazouzi)
http//www.fynu.ucl.ac.be/themes/he/cms/activities
/tracker/hybrids.html
Vincent Lemaitre tracker week 29.01.03
2Current measurements
Comparisons between FHIT ARC CMS-like
ARC
FHIT does not send triggers while measuring
current consumption whereas ARC and CMS-like
system do
FHIT
This problem is solved FEH needs more current
when triggered
3Electrical Test limits
From statistics on FHIT measurements intervals
m-3s m3s where m is the mean of
distribution and s the RMS
These limits can be resized with a multiplicative
parameter, common for all limit values (available
in configuration file).
4Functional Test limits
These are the ARCS parameter All these limits
are accessible in the configuration file
5FHITS 1.3
New version 1.3 (updated interface, as asked by
industry)
- Display the of good and bad hybrids of the
current day
- All part-numbers accepted 1663 ? 1674 (new
firmware)
6Conversion to XML
- conversion to XML direct contact with CERN
people to fit to their wishes - C routine being written in Louvain not
necessary _at_ industry - proposed scenario
- production and tests _at_ industry ( logfile
creation ) - delivery _at_ CERN of hybrids and logfiles (on
CD-R) - 1 delivery FEH 1 CD ( copies)
- tests _at_ CERN (with FHIT ? logfile creation)
- creation of XML files (by running the C
routine) _at_ CERN - transfer to database
7Number of FHIT set-ups
8Test procedure
S A M T E C
S A M T E C
N A I S
N A I S
E R N I
E R N I
FHIT
To be tested
Test setup
- Industry 1 Naked hybrids (w/o APVs)
- Industry 2 Hybrids
- Before bonding pitch adapter ? LINK to DB (XML)
_at_ Industry _at_ CERN
9Mechanics
New mechanics -Easier to handle -Insure
thermal contact (cooling) -Probe for test of
bias return line
Heavy cover with auto-retractile probe
Pad on hybrid for test of bias return line
Hybrid
Fine positioning plugs
Cooling contact
10Summary
- Difference between set-ups for Current
Measurement is understood - First estimate of Limits for ET and FT have been
evaluate (to be continued) -
- Most recent release of software distributed
(FHITS 1.3) -improved display -all part number
included (firmware) - Agreed procedure for loading FHIT data into DB
(almost operational) - Proposal for the number of FHIT set up
- Test procedure including thermal contact of
hybrid and test of bias return line.