SSD Operations - PowerPoint PPT Presentation

About This Presentation
Title:

SSD Operations

Description:

David Bonnet. US. Michael LeVine. Jim Thomas. Vi Nham Tram. Howard ... David Bonnet did excellent job in pass. Need new 1 scientist FTE-yr (TBD) [both tasks] ... – PowerPoint PPT presentation

Number of Views:52
Avg rating:3.0/5.0
Slides: 17
Provided by: micheal7
Learn more at: https://sseos.lbl.gov
Category:
Tags: ssd | bonnet | operations

less

Transcript and Presenter's Notes

Title: SSD Operations


1
SSD Operations
  • August 20, 2007
  • H. Matis for the SSD group

2
Key Active People this Year
  • US
  • Michael LeVine
  • Jim Thomas
  • Vi Nham Tram
  • Howard Matis
  • Poland
  • Jacek Plebanek
  • Radoslaw Pieniazek
  • France
  • Christophe Renard
  • Stephane Bouvier
  • Gerard Guilloux
  • Jonathan Bouchet
  • Artemious Geromitsos
  • Jerome Baudot
  • David Bonnet

I hope I have not left someone out
3
SSD Timetable
4
Tasks
  • QA, filtering, calibration
  • Repair and maintenance
  • Upgrade cooling
  • L2
  • Readout upgrade
  • Slow controls
  • Runtime operations
  • Reinstallation
  • QA monitoring

5
QA, filtering, calibration(urgency 1 - now)
  • Tasks
  • Run filtering
  • HV shifts
  • Alignment
  • Cluster detection
  • People
  • Jonathan (graduating)
  • Artemious
  • Jacek
  • Radoslaw
  • Need post doc leading this effort
  • Continuity when detector is used again
  • To do (when detector is reinstalled)
  • Improve QA information so that they are easy to
    understand

6
Repair and Maintenance(urgency 1 - now)
  • Several ladders are broken
  • Ladders need to be checked and broken ones
    repaired
  • Repairs must be done at Nantes
  • People
  • Stephane
  • Help from Michael, Jim, and I
  • To do
  • Create a test bench at BNL for inspection
  • Need BNL tech - 20 FTE to learn system, diagnose
    and repair
  • Assemble parts inventory
  • CAEN power supply flakey
  • Repair or spares - lower priority

7
Upgrade Cooling(urgency 2)
  • Scenario I October 1
  • 1/4 FTE designer for new cooling system
  • Transfer SVT slow controls system to SSD
  • Slow control group
  • Install cooling interlocks
  • Scenario 2 - Next year
  • Cooling done as part of HFT installation
  • Need to relate slow control interface to SSD
    interlocks

8
SSD Readout Upgrade(urgency 2 start 11/2007)
  • Upgrade electronics Design of new readout
  • Must be sensitive to DAQ1000
  • STAR needs to define triggering requirements
  • Personal for upgrade
  • Christophe (Nantes) 0.75 FTE-yr
  • Michael 0.5 FTE-yr
  • Digital electronics engineer (BNL - TBD) 0.75
    FTE-yr
  • Software to decode new data format
  • Michael L. 0.1 FTE-yr

9
L2 upgrade and fix(urgency 2 Implemented
before DAQ occupied with data taking)
  • SSD crashes with L2 trigger
  • Large amount of data needlessly sent to be
    compatible with existing code
  • Only needed for scenario 1
  • People
  • Michael - 2 months
  • Christophe
  • STAR DAQ person for diagnosis

10
New SSD-specific slow controls(urgency 2 start
3/2008)
  • Replace EPICS/VxWorks with Linux version
  • Can no longer support SUN-based system
  • New presentation required for new readout
    architecture
  • David Bonnet did excellent job in pass
  • Need new 1 scientist FTE-yr (TBD) both tasks

11
Runtime Operations(urgency 2 start 8/2008 or
9/2009)
  • Run 7 - 3 people/week - 2 FTE/week
  • Run 7 crew
  • Michael, Jim, Vi Nham
  • Jonathan, Artemious
  • Jerome (in France)
  • Did not train super expert
  • Need one leader for the runtime operations group
  • Knows all whims of the detector
  • Resident at BNL

12
Reinstallation(urgency 2 start 8/2008 or
8/2009)
  • Reinstall detector and test - One month
  • Installation
  • Stephane
  • Gerard
  • BNL Tech
  • Testing
  • Christophe
  • Train runtime crew

13
QA monitoring(urgency 2 start 8/2008 or 8/2009)
  • Need instantaneous online monitoring
  • Helps to understand the SSD behavior (HV, reboot
    of the Slow Control)
  • And to take action if needed
  • Need to revisit the current plots (less but
    relevant)
  • 2D occupancy plot
  • (SSD hits/global tracks) distribution
  • SSD hit vs. phi
  • Plots for shift crew or SSD expert
  • QA did not work well in Run7
  • Need real-time monitoring
  • Implementation 1 FTE for 1 month

14
To do Scenario I or 2?(urgency 2 - decision by
January 2008)
  • Does the SSD hurt or help the low mass run?
  • Does it separate non-photonic electronics from
    background?
  • SSD is used to calibrate the TPC
  • How important is this?
  • Need analysis by working groups of pros and cons
    of having it in
  • Installation and cone design
  • Path of upgrades
  • Is upgrade funding available
  • Longer the SSD out, the more institutional memory
    lost
  • Decision needs to made by management by say
    January 31, 2008

15
Homework for SSD Group (urgency 1 - Completed by
October 2007)
  • Need to write short proposal
  • Jim and I
  • Describe in detail how to update SSD
  • Memorandum of Understanding
  • Michael and Stephane (Christophe)
  • Between STAR and SUBATECH
  • Formally establish collaboration in DAQ1000 era

16
Summary
  • This year assembled a good team
  • Strong support from the French
  • Need to transfer center of gravity of support to
    North America
  • significant training and a Blair for the
    detector
  • STAR management must establish when the SSD will
    be reinstalled
  • Establish formal structure for the group with
    institutional responsibilities
  • Upgrade path must be specified
  • Need money, engineering and tech support
  • Many key personal are graduate students, postdocs
  • French support will not increase
  • Need to identify positions and funding for hire
  • Excellent project for small university group to
    join and provide significant contribution
  • Any volunteers?
Write a Comment
User Comments (0)
About PowerShow.com