Title: FLRC BLISS
1FLRC - BLISS
- Field Installation Readiness Support Team
(FIRST) - Contract
- INDUSTRY DAY
- BRIEFING
POC Mike Frankland (915) 568-0802 DSN
978 Mike.frankland_at_us.army.mil
2POCs
- COR PM
- Mike Frankland Dean Smith
- (915) 568-0802 (404) 464-5318
- mike.frankland_at_us.army.mil dean.smith3_at_us.army.mil
- Ordering Officer Ordering Specialist
- Betty Parker Jennifer Zielinsky
- (910) 907-5103 (910) 907-4750
- Betty.parker1_at_us.army.mil jennifer.zienlinsky_at_us.a
rmy.mil
3Supporting ARFORGEN
Resetting the Force
Sustaining the Force
LOGFORGEN
National Level Reset Work
Left Behind Equipment (LBE)
Available 3
APS
New Equipment
Reconstitute APS
Contractor Logistics Support
Depots
LOGCAP
Depots
Director of Logistics
Director of Logistics
FLRC
Technology Insertion
Theater Provided Equipment (TPE)
FLRC
Life Cycle Mgmt Commands
Reestablish Ammo War Reserves
Life Cycle Mgmt Commands
Sustainment Brigades
Sustainment Brigades
Joint Logistics Integration
Army Field Support Brigades
Army Field Support Brigades
Distribution Management
Repair IAW TMs (10/20)
Training Sets
Reset/ Training 1
Ready 2
Current Missions
Army Materiel Command Logistics Synchronizer
and Integrator for ARFORGEN
11
4- FLRC Relationships
- On Installations
- Have local mission focus regional missions as
assigned by FLRD - Have a long-standing role and relationship with
local commanders - Provide mutual reciprocal support to LSE Cdr and
his/her Face to the Commander mission - FLRC Project Officers determine how their
missions will be accomplished - Are supported by an FLRD Program Manager for
Funding and Contract Management - Project Officers are CORs for Task Orders
supporting FLRC / FLRD missions - Must know and understand LSE CDR missions
- Can leverage each others strength to support
on-post customers
4
5CURRENT MISSIONS
6What We Are Doing
- Left Behind Equipment (LBE)
- Pre-Deployment Training Equipment (PDTE)
- Field Level REST
- RECAP (AMCOM) TCM-1 Program
- Organizational Contractor Augmentation Teams
(OCAT) - WSMR DOL Tactical Maint. Support
7Current Activity
- LBE 4th BCT 1st BCT
- SVC RTN 10/20/30 for WSMR, JTF-N
- RECAP AMCOM/LTPO TCM-1 Shelter
- RESET MPP local ECP Region
- RETROFIT ASV FRAG Kits
- PDTE Bliss McGregor
- Flyaway Pkg Ft. Lewis and others
8WHERE WE DO IT AT
- Ft. Bliss, TX
- McGregor Range Base Camp, NM
- Biggs Army Air Field, TX
- White Sands Missile Range, NM
9ADMIN OFFICES
Production Control
RM 113
RM 114
Budget Analyst
RM 108 FCMF-BLISS
Sr QAR
RM 115
Assistant Project Officer
Project Officer
RM 116
ENTRANCE
BLDG 515-B RM 108, FT BLISS TX
10THE DUNGEON
Currently Remodeling
Contractors office
Storage
SWO
SWO
BUILDING 515-B BASEMENT AREA
11FLRC Capacity Capability
12FLRC Capacity Capability
13(No Transcript)
14FLRC Capacity Capability
OPERATIONAL STOCK 3340 LINES
VALUED OVER 2.6 MILLION
15FLRC Capacity Capability
16FLRC Capacity Capability
17FLRC Capacity Capability
18FLRC Capacity Capability
- Capacity One facility on McGregor Range Base
Camp 18,000 sq. ft. - Fenced, lighted w/sentry gate
- W/ 25K Crane 2 15K external
- Wash rack w/ oil/water separator
- 3 inspection pits
- Closed bay vehicle exhaust system
- ASL/PLL storage 8.5K sqft
- Wield, HVAC, HYD, CRP
19Field Logistics Readiness Center (FLRC)
PDTE
Restores Equipment to a Completely Fault-Free
Condition
20PDTE
- Pre-Deployment Training Equipment
- Two sites McGregor Bliss
- McGregor 125 weapons 75 vehicles
- Bliss 300 vehicles to include ASV MRAPs
- Growth Increase to 800 Density in FY10
- ASV Support
- MRAP Support
21PDTE McGregor
22BLISS PDTE
23(No Transcript)
24FLRC Capacity Capability
- Capability 450 Wrench Turners wherever needed.
Binds resources together. - Flyaway packages to Irwin, Hood, Lewis, Bragg,
Hawaii, Kentucky, Arizona - Can lease what is not available on installation
- Can SUB if required
- Can SURGE to meet short and long missions
- Test equipment to meet the 10/20/30 missions
- Programmed ASL/PLL
- Welding, HVAC, HYD, CCRP
25FLRC Capacity Capability
- Capability Test and Repair Capability for
- Armored Personnel Carrier (APC) M113A3
- Hercules (M88)
- And upcoming programs
- ATLAS II
- HMEE
- Lightweight Prime Mover (LWPM)
- Internally Transported Vehicle (ITV)
- M1A2 and Bradley upgrades
- HMMWV
- Stryker
- Palletized Loading System (PLS)
- Heavy Expanded Mobility Tactical Truck (HEMTT)
- Heavy Equipment Transporter (HET)
- Family of Medium Tactical Vehicles (FMTV)
- Medium Tactical Vehicle Replacement (MTVR)
- HIPPO
- Light Equipment Transporter (LET) M915, M916, M917
26FLRC Capacity Capability
- Capability Sub-Components that can be onboard
Tested and Repaired
Detroit Diesel - DDEC II - DDEC III -
DDEC IVCaterpillar - 3126A - 3126B -
C12 - C7
WABCO ABSEaton - ABS - CTIS GM
4L80Allison - ATEC - WTEC
27WSMR SUPPORT
28WSMR DOL SUPPORT
29FLRC - WSMR
FLRC LIGHT MAINTENANCE FACILITY B-1794
11
1
5
12
6
7
13
10
9
8
- Latrines / Locker Room 7. Inspection Section
- DOL Fast Maintenance 8. Break Area
- DOL Fast Maintenance 9. SAMS-E Office
- DOL Fast Maintenance 10. Supply Office
- Production Control Section 11. Site Supervisor
Office - Tool Room Cage 12. Break Room
-
13. Team Leader
Office
FLRC AO
DOL AO
30FLRC - WSMR
B-1794 Capability This maintenance area has 8
medium size bays with the capability for light
vehicle maintenance with approximately 7000sf of
space There is outside storage for equipment
processing The administrative area for WMMS and
QA are approximately 700sf The parts storage area
is approximately 700sf to include shelving The
equipment wash area is located 200yds east of the
facility There is no overhead lift in this
facility There is no QA or Lube pit
31(No Transcript)
32Organizational Contract Augmentation Teams (OCAT)
Provide on-site maintenance assistance, tailored
to the specific needs of our customer
Scheduled Services
Supply Support
10/20/30 Repairs
PATRIOT Systems
Power Generation
A/C and Heaters
33FLRC Past Performance
WE WORK WELL WITH OTHERS
- OIF-1, PATRIOT RESET in concert with LCOE,
Raytheon TYAD - DOL MOB 211th TRANS 29th BCT
- DOL AETF Surge w/ CLIN Established
- OCAT within the FORSCOM ADA BDEs, TRADOC 6th
ADA BDE, 4th BCT - FLYAWAYS working with other contracts for a
common goal - CCRP with 4th BCT for Track Element
refurbishment. - MWOs TACOM HEMTT Wheels Oil Cooler, CECOM A/C
Conv.
34AMCOM PATRIOT RESET
TEAM OF TEAMS
- Tobyhanna Army Depot for COMMO
- Raytheon for PAC III
- Letterkenny Army Depot for PAC II
- FLRC-Bliss for all Prime Movers
4 BDEs 7 BNs
35Operation Iraqi Freedom Redeployment Recovery Plan
FORSCOM initiative to restore units to pre-war
readiness
On-site maintenance support
36PATRIOT RESET
Restoring the PATRIOT fleet to pre-deployment
condition
Intensive Inspection
Complete Service
Repair and Return
10/20 Minus
37Trailer Rebuild Program
A complete rebuild and refurbishment program for
PATRIOT maintenance and parts trailers
38Maintenance and Parts Trailer Rebuild Program
BEFORE
Seam Damage
Poor Paint
Old Repairs
Water Damage
Corrosion
Frame Damage
Insulation Damage
39Maintenance and Parts Trailer Rebuild Program
AFTER
Structure Repaired
New Floor
Interior Paint
All Electrical Works
Interior Like New
Complete Exterior Paint
Frame Repaired
40FLRC TCM-1 Project
41TACOM 5 TON RESET
42(No Transcript)
43(No Transcript)
44INITIAL
45FINAL
46INITIAL
47FINAL
48FINAL
4931ST BDE
5011TH BDE
51FINAL
52FINAL
53CECOM PWR GEN RESET
FINAL
54FLRC TRACK CCRP
HARDWARE USED IN 10-20 TRACK REFURBISH
TRACK TENSION TABLE
55FLRC TRACK CCRP
EVAPO RUST TRACK CLEANING SOLUTION
TRACK WORK TABLE BEFORE
56FLRC TRACK CCRP
Cost savings 50
CODE B TRACK FINISH PRODUCT
57FUTURE OPS
- 1/1 AD RESET/LBE
- Army Reserves M870 FOV 10/20/30
- NM National Guard M870 FOV 10/20/30
- TACOM FMX
- 32nd AAMDC M901 LS 10/20/30 excess
- DOL AETF Surge SPT
58ISSUES CONCERNS
- AMC Footprint Growth Affect on DRM and DOC AMC
not core to the departments for support. - FLRC Facilities Current size designed to support
ADA, 10K Troops. BRAC Modularity will bring it
to 40K by 2011 or sooner. 1391 is ready to submit.
59CLOSING
- FLRC On Time! At Quality! Within Cost!!!
- You pay for only what you want and you get what
you pay for! - FLRC Versatile, Applicable Thinks outside the
box! NO is not in vocabulary. - FLRC Ties the resources together accomplish the
overall mission. - No Excuses with the RIGHT Results.
60 TOTAL COMBAT READINESS
61