UCSB CMS Weekly Status Meeting. CMS 4-Hybrid Test System Sam Burke EE. Slide 1 ... External Buss connector and associated IC's on lower left of photo. U32 ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 17
Provided by: sbu7
Learn more at: http://hep.ucsb.edu
Category:
Tags: ucsb | hybrid | status | system | test | thermal

less

Transcript and Presenter's Notes

Title: UCSB 4-Hybrid Thermal Test System Status


1
UCSB 4-Hybrid Thermal Test System Status
13 October 2003 Sam Burke Lance Simms UCSB
HEP Group
2
Status
  • UCSB 4-Hybrid Thermal Test system is operational
  • ARCS and ACDC software integrated so that test is
    a one button operation

3
Setup in UCSB Clean Room
4
UCSB Cold Box
5
Installing Hybrid/PAs
6
Pulser Functional
  • Pulser had been triggering on noise. Needs to be
    synchronized with ARC Clock .
  • Twisted cable from ARC Controller card used
  • Eliminated noise in UCSB LVDS/CMOS Converter
  • No LVDS signals from ARC Controller Card

7
LVDS Signal?
  • ARC Boards with
  • functioning External Bus
  • Ser 29
  • Ser 31
  • ARC Boards with
  • non-functioning External Bus
  • Ser 56
  • Ser 57
  • Ser 59

LVDS Signal
Noise
8
ARC Controller Problem
  • Bad Batch of ARC BOARDS LVDS Driver and LVDS
    Receiver U32 and U33 were switched during board
    assembly. Problem was never discovered.
  • External Buss connector and associated ICs on
    lower left of photo.

U32
9
With Pulser Operational
  • Opens detectable in Scope Mode

Intentionally Plucked Bonds Show up in Pedestal
Profile
10
With Pulser Operational.
  • Opens are also detectable in Pedestal Noise Test

Plucked Bonds
11
Grounding Issues
Huge spikes in noise at APV edges
Same Problem CERN was having.
12
Using their same method
Ground lines connected to Support plate by
silver strip Problem Solved No more spikes
13
Thermal Cycle Test
  • Test Time 42 min.
  • Three Sets of Tests
  • Pedestal Noise
  • Pulser
  • Short Detection

14
Automated Test Results
  • Final Report After Thermal Cycle Test
  • Lists -Shorts
  • -Opens
  • -Noisy Channels

15
So Far At UCSB
  • 6 Hybrids Bonded and Thermal Cycled

Serial Shorts Opens
Failure at -20
30216711300712 30216711600699 30216711500720 30216
711500730 30216711500732 30216711500733
No
0
0
No
0
0
No
0
0
No
0
0
0
0
No
0
No
0
16
And Now
  • Building a new peltier plate in order to bring
    test time down
  • Goal Loading Testing Unloading
  • in 50 minutes

Nevertheless, ready to thermal test on mass scale