Title: Photo Album OMU 0300336 BIV Daviess County 4242006


1
Photo Album OMU 0300336 BIV Daviess County
4-24-2006
  • by L. Peyton Adams
  • Madisonville Regional Office
  • Kentucky Division of Water

2
Cavin High Service pump area and crane
3
Diked chemical feeder room and scales used for
pounds per day feed rates with cameras pointed to
monitor that allows an operator at Fourth Street
plant to see the feeds at Cavin.
4
Camera monitor of chlorine rate of feed
5
Chlorine safety, alarms, and SCBA at locked room
6
Ton cylinders and alarms
7
Ton cylinder chlorine room, alarms, sniffers, and
venting
8
Chlorine operator documentation logs
9
Ton cylinder in use
10
Ton cylinder of chlorine in use
11
Scales for MOR for pounds of chlorine feed used
12
Sniffer vent in entrance door
13
Outside chlorine room safety equipment
14
Lock out/tag out safety features in use
15
Filter control room at Cavin
16
Filter control panel
17
Middle of control room panel
18
Right side of control panel with SCADA data
connected.
19
Filter profile cylinder on a camera view held on
one side
20
Backwash tank and well aeration
21
In line turbidimeters with SCADA connections.
22
New filter controls
23
New filter controls and Hach NTU feedback to SCADA
24
Filter 2 Hach NTU feedback to SCADA and new
electronic controls of valves
25
Filter 1 Hach in line NTU feedback to SCADA
system.
26
Bulk chemical storage, vents, dikes, emergency
eye wash stations and showers.
27
Chemical bulk storage rooms with diking
28
Bulk storage and diking of chemicals in basement
level.
29
Dike paint scheduled for regular scraping and
repainting as part of PM program.
30
Diked chemical storage with color coded and
stenciled piping.
31
Piping with stenciling, vector arrows, valves,
and pipe gallery areas
32
Backflow prevention valve set up between fire
system and potable with color coding. Efforts to
keep valving functional with deposition issues
continue.
33
Condensate and corrosion on paint job at transfer
pump areas.
34
Condensate impact on transfer pump piping in pipe
gallery.
35
Leaking valve stains from past valve problem on
the paint job of the transfer pump piping.
36
SCADA linked Hach chlorine analyzer in transfer
pump pipe gallery room.
37
High service pump discharge line stenciled and
color coded.
38
High service room pumps, venting, and crane area.