Integrated DDR Planning, Processes and Structures - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Integrated DDR Planning, Processes and Structures

Description:

Relation to a peace agreement. Assessment of national capacities. Identification of options ... Political, social and economic context and background ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 14
Provided by: joshuas5
Category:

less

Transcript and Presenter's Notes

Title: Integrated DDR Planning, Processes and Structures


1
Integrated DDR Planning, Processes and Structures
  • 3.10

2
Overview
  • Introduction
  • Situating DDR within UN and national planning in
    post-conflict contexts
  • Phase One
  • Phase Two
  • Phase Three
  • Phase Four
  • Phase Five
  • Institutional requirements and modalities for
    planning

3
Introduction
  • The implementation of DDR programmes often
    necessitates difficult compromises and trade-offs
    between various political, security and
    development considerations. It also relies very
    much on establishing an appropriate balance
    between international engagement and national
    ownership.

4
Introduction (Cont.)
  • DDR programmes have a better chance of success
    when the DDR planning process starts early
    (preferably from the beginning of the peace
    process), builds on the accumulated experience
    and expertise of local actors, is based on a
    solid understanding of the conflict.

5
Situating DDR within UN and National Planning in
Post-conflict Contexts
  • Basis for delimiting DDR planning considerations
  • Phase One Pre-planning and predatory assistance
  • Development of an initial set of strategic
    options or assessments
  • Technical advice within peace negotiations/mediati
    on
  • Hiring of DDR specialists and DDR consultants

6
Situating DDR within UN and National Planning in
Post-conflict Contexts
  • Exploratory DDR assessments
  • Capacity mapping
  • Engagement of key donors and stakeholders
  • Identification of DDR personnel

7
  • Phase Two Initial technical assessment and
    concept
  • of operations
  • Conditions and requirements for DDR
  • Relation to a peace agreement
  • Assessment of national capacities
  • Identification of options
  • Role of DDR (mission strategy and support to
    international and national stakeholders)
  • Report of the SG to the Security Council
  • Mission mandate of DDR

8
  • Phase Three Development of strategic and policy
  • framework
  • Overall strategic objectives
  • Key DDR tasks
  • Initial organizational and institutional
    framework
  • Identification of other national and
    international stakeholders

9
  • Phase Four - Development of programme
  • Three main phases of the design cycle
  • Detailed field assessments
  • Political, social and economic context and
    background
  • Causes, dynamics consequences of armed conflict
  • Participants, potential partners other
    interlocutors
  • Distribution, availability proliferation of
    weapons
  • Institutional capacities of national stakeholders
  • Survey of socio-economic conditions local
    capacities
  • Preconditions other factors
  • Baseline data performance indicators

10
  • Phase Four - Development of programme
  • Detailed programme development and costing of
    requirements
  • Development of an implementation plan

11
  • Phase Five Continuation and Transition planning
  • DDR strategy and plan should remain flexible
  • Process of periodic reviews, monitoring and
    real-time evaluations to measure performance and
    impact during implementation

12
(No Transcript)
13
Institutional Requirements and Modalities for
Planning
  • Planning structures Headquarters
  • Field DDR planning structures and processes
  • UN country team DDR task force
  • Mission DDR steering group
  • Integrated UN DDR unit
  • Integrated planning, programming and management
  • Joint operations and implementation
Write a Comment
User Comments (0)
About PowerShow.com