Title: Auditorium


1
Auditorium Cloud ceiling and lights are
installed scaffolding has been removed wood
flooring subcontractor is reviewing the existing
wood floor condition and is making recommendations
2
Auditorium Some electrical demolition has been
taking place intermittently
3
E-wing as seen early in the week
4
E-wing Roof demolition in progress Thursday and
Friday on the wood framed hip roof
5
E-wing Interior wall tile demolition in progress
6
E-wing Interior wall tile demolition complete in
the same area as the previous photo
7
E-Wing
8
E-Wing Room C38 (Arch numbering) Pallets of VCT
are being stored until installation
9
Work continues after school hours on the
Auditorium entranceway
10
Trees and mulch in the planters make for a nice
appearance out front
11
Trees and mulch in the planters make for a nice
appearance out front
12
Landscaping and seeding past the last trailer on
the East side
13
Tree planting near the auxiliary gym
14
Hydro-seeding on Tuesday
15
Facing Northside Middle
16
Science Addition Landscaping
17
East Courtyard Grass is coming up
18
Media Courtyard Facing the back of the library
19
Media Center / Library New cushioned wooden
chairs arrived this week
20
Media Courtyard Facing the back hallway entry
21
Outdoor dining 9-11-08
22
Receiving Hallway New masonry wall and door
have been installed
23
Mobile Classrooms are being broken down and
readied for transport
24
Mobile Classrooms are being broken down and
readied for transport
25
Mobile Classrooms are being broken down and
readied for transport
26
Wrestling room Drywall work where a section of
wall was replaced
27
Wrestling room Being used for storage while the
lower level gets epoxy floors installed
28
Football locker room Being occupied as needed
29
Fitness room 1 Epoxy floor installation in
progress
30
Primer coat was applied in the hallway
31
Locker room Flooring in progress / New lockers
are installed
32
Flooring installation at the entrance to Girls
PE office and Laundry room
33
Storage room access through Fitness Room 2 New
doors and frame installation in progress Ceiling
grid is substantially complete
34
Electrical switch gear demolition finishes up in
the old boiler room